Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

Noise<br />

NOI-1: To reduce <strong>the</strong> effects of construction noise, <strong>the</strong><br />

applicant shall require construction contractors to limit high<br />

noise-producing activities to <strong>the</strong> least noise-sensitive times of<br />

day and week (e.g., 7:00 am to 6:00 pm), Monday through<br />

Friday<br />

NOI-2: The applicant shall require that all construction<br />

contractors equip and maintain all construction equipment<br />

with effective muffler exhaust systems no less effective than<br />

those provided on <strong>the</strong> original equipment.<br />

NOI-3: During construction, <strong>the</strong> Project Engineer shall require<br />

all construction contractors to comply with all federal, state,<br />

county and local sound control and noise-level regulations<br />

and ordinances.<br />

NOI-4: As directed by <strong>the</strong> Project Engineer, <strong>the</strong> contractor<br />

shall implement appropriate additional noise mitigation<br />

measures including, but not limited to, changing <strong>the</strong> location<br />

of stationary equipment, shutting off idling equipment,<br />

rescheduling construction activity, notifying adjacent<br />

residents in advance of construction work or installing<br />

acoustical barriers around stationary construction noise<br />

sources<br />

Soils and Hydrology<br />

Soils To reduce <strong>the</strong> possibility of erosion, <strong>the</strong> applicant shall<br />

require construction contractors to utilize <strong>the</strong> following best<br />

management practices (BMPs) to prevent discharges from<br />

entering waters of <strong>the</strong> U.S. during construction.<br />

SOI-1: Erosion control and sedimentation prevention<br />

methods shall be utilized during <strong>the</strong> construction phase of <strong>the</strong><br />

<strong>project</strong>. These will include <strong>the</strong> placement of fiber rolls, sand<br />

bags, rice mats, straw wattles, or similar measures.<br />

SOI-2: No stockpiles shall be placed within waters of <strong>the</strong> U.S.<br />

SOI-3: No vehicle maintenance shall be conducted within or<br />

adjacent to waters of <strong>the</strong> U.S.<br />

Frank Springer & Associates, Inc. Page 19 of 79 Environmental Assessment