Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

BIO-10: All refuse created or brought on site by construction<br />

personnel or contractors must be placed in covered<br />

containers, removed from <strong>the</strong> site daily and disposed of<br />

properly.<br />

BIO-11: The Biological Monitor shall examine <strong>the</strong> Project<br />

vicinity <strong>for</strong> any bird nests (tree, cavity, or ground) in which<br />

fledging has not occurred. If any are found during layout and<br />

marking or implementation, <strong>the</strong> Project biologist will evaluate<br />

and recommend protection measures.<br />

Management<br />

Indicator Species BIO-1, BIO-3-8, BIO-10 -11. See Above.<br />

Migratory Birds BIO-1, BIO-4, BIO-6, BIO-11. See Above.<br />

Weed Risk BIO-13: All heavy equipment used on this Project will be<br />

cleaned and inspected be<strong>for</strong>e moving into <strong>the</strong> Project area.<br />

This will ensure no noxious weeds will enter <strong>the</strong> Project area.<br />

Fire Risk<br />

Fire Risk<br />

BIO-14: All equipment will be cleaned and inspected be<strong>for</strong>e<br />

leaving <strong>the</strong> Project area to prevent <strong>the</strong> spread of existing<br />

weeds to new areas.<br />

BIO-15: All temporary staging areas shall be placed in<br />

unvegetated areas with compacted soils, and if adjacent to<br />

natural vegetation communities, shall be delineated with silt<br />

fencing. Staging areas will not be infested with noxious<br />

weeds.<br />

FIR-1: In order to minimize fire risk during <strong>the</strong> construction<br />

phase of <strong>the</strong> Project, <strong>the</strong> Fire Plan For Construction And<br />

Service Contracts 6-14-2006 (FSH 6309.32 and 6309.11)<br />

shall be implemented by <strong>the</strong> Project proponent.<br />

Land Use, Ownership, Easements, Traffic, and Road Maintenance<br />

Road<br />

Maintenance<br />

Socio-Economic and Noise Effects<br />

BIO-9, Additionally BMP’s will be employed including:<br />

BIO-13, 14, SOI-1, 2, 3, 4, and AIR-2, 5, 6, 7.<br />

Frank Springer & Associates, Inc. Page 18 of 79 Environmental Assessment