Who will be doing <strong>test</strong>ing and how will it be verified?<br />

Most likely James Parrott will complete <strong>test</strong>s. Graduate students will also help in the<br />

<strong>test</strong>ing.<br />

Power System Simulation and Integration Testing<br />

How and where will <strong>test</strong>ing be performed?<br />

Testing will be performed in our <strong>SCADA</strong> lab. We will need to verify that our <strong>SCADA</strong><br />

<strong>test</strong><strong>bed</strong> is interacting with and controlling our power flow s<strong>of</strong>tware.<br />

Exactly what will be <strong>test</strong>ed?<br />

We will need to <strong>test</strong> each component on our power flow simulation that is linked to our<br />

OPC server and controlled by our <strong>SCADA</strong> system. These components will mainly be<br />

relays.<br />

How will <strong>test</strong>ing accuracy be determined?<br />

Our <strong>test</strong>ing will be very objective, since the components that we are <strong>test</strong>ing—virtualized<br />

relays—only exist in two states: on and <strong>of</strong>f. Our operator will be sitting at our control<br />

terminal, and he will toggle the status <strong>of</strong> a relay. If the change is reflected on our<br />

PowerFactory display, and the power flow solution is adjusted accordingly, we know<br />

that the <strong>test</strong>ed component is functional.<br />

What information will be recorded on the forms that will be used to record <strong>test</strong> results?<br />

Date/Time, name <strong>of</strong> component <strong>test</strong>ed, location on OPC server, <strong>test</strong> failed/successful,<br />

comments<br />

Who will be doing <strong>test</strong>ing and how will it be verified?<br />

Most likely Tony Gedwillo will be performing these <strong>test</strong>s. Our cooperating grad students<br />

will help to verify these results by attempting to operate the system.<br />

<strong>Cyber</strong> <strong>Security</strong> Testing<br />

How and where will <strong>test</strong>ing be performed?<br />

o In the lab, on the physical substations.<br />

Exactly what will be <strong>test</strong>ed?<br />

o We will <strong>test</strong> the overall security configuration <strong>of</strong> the system and attempt to<br />

implement any promising vulnerabilities that are discovered.<br />

How will <strong>test</strong>ing accuracy be determined?<br />