Govt.of Jh<strong>ark</strong>hand<br />
Road Construction Department<br />
Name of Work :-<br />
Road Circle, Dumka<br />
Bill of Quantity<br />
B.O.Q. surface Renewal in D.M.K Nala<br />
road in K.m 43(110m),58(100m),61(50m),<br />
63(50m),66(800m). 67(510m) and Guard<br />
wall in Km 54 and 46 for the Year 2011-12.<br />
rdinary Repair of JAMA-JAMTARA-RUPNARAYA) TO 103.4 FOR<br />
AR 20-12<br />
OFFICE OF THE EXECUTIVE ENGINEER,<br />
ROAD CONSTRUCTION DEPARTMENT,<br />
ROAD DIVISON,JAMTARA.
Tender paper for filling rates by the tenders on the basis of enclosed approved bill<br />
of quantity for the work of B.O.Q. surface Renewal in D.M.K Nala road in K.m<br />
43(110m),58(100m),61(50m), 63(50m),66(800m). 67(510m) and Guard wall in<br />
Km 54 and 46 for the Year 2011-12.<br />
1.Estimated Cost:- Rs. 46,63,728.00<br />
2. Amount of E.M to be deposited:- Rs. 94,000.00<br />
3. Cost of bill of Quantity:- Rs.5,000.00<br />
4. Time of Completion:- 3 Month<br />
5. Last Date of sale of bill of Quantity:- 11.11.2011 upto 3:00 P.M<br />
6. Date & Time of receiving tender:- 12.11.2011 upto 3:00 P.M<br />
7. Date & Time of Opening the tender:- 12.11.2011 at 3:30 P.M<br />
8. Authority receiving tender:-<br />
C.E (C) / S.E. / E.E. /<br />
R.C.D Ranchi / R.C.D., Dumka/ R.C.D, Jamtara<br />
9. Tenders is to quote his rate on percentage basis of enclosed bill of quantity<br />
rates both in word & figure in the noted colums (Note:- Cross (X) below the other<br />
rates which does not apply him.<br />
10.<br />
(i)in figure:-<br />
(ii)in words:-<br />
Percentage<br />
above the<br />
enclosed<br />
B.O.Q Rates<br />
on all item of<br />
work<br />
Precentage<br />
below the<br />
enclosed<br />
B.O.Q rates on<br />
all item of<br />
work<br />
At the<br />
enclosed bill of<br />
quantity rates<br />
on all item<br />
REMARKS<br />
11. Issued to Sri………………………<br />
12. Name & Complete postal address of<br />
Tenderer:-<br />
13. Registration Number:-<br />
14. Amount of E.M deposited by the tenderer in shape of:-<br />
15. Time of Comletion as Quoted by the tenderer:-<br />
16 Whether T.C.C. I.T.C enclosed on not:-<br />
17. Labour Registration on number :-<br />
18. Total number of sheets tender sheet<br />
incl uding this sheet submitted by<br />
tenderer:-<br />
Executive Engineer<br />
Date , Sign of tenderer R.C.D. Road Division<br />
Jamtara
B.O.Q. surface Renewal in D.M.K Nala road in K.m 43(110m),58(100m)<br />
61(50m), 63(50m),66(800m). 67(510m) and Guard wall in Km 54 and 46 for the<br />
Year 2011-12<br />
Sl.No. Item of work Quantity Unit Rate (Rs.)<br />
1 2 3 4 5<br />
1/<br />
S/R<br />
6.3.22(a)<br />
2.<br />
S/R<br />
N.H.5.2<br />
Providing 50mm thick compacted<br />
built up spray grout over bitumenous<br />
(old) surface in proper grade camber<br />
and superrelevation with stone metal<br />
grade -III(20mm to 37mm size)<br />
@0.66m3 key stone or screening<br />
materials of size 12mm ungraded<br />
@0.13 M3 and bitumen @20kg.<br />
(including taxk coat @5Kg.) all per<br />
10m2 surface including cost of<br />
cleaning the surface properly with<br />
iron brush and broom cost of heating<br />
bitumen to required tem. with cost of<br />
fuel, rolling, providing light, barrier,<br />
danger signal, chowkidar, returning<br />
the empty bitumen drums in good<br />
condition to the godown and hire<br />
charge of roller as pr specification<br />
and direction of E/I(with paked<br />
bitumen)<br />
43th K.M 605.00<br />
58th K.M 49.50<br />
61th K.M 19.25<br />
63th K.M 19.25<br />
66th K.M 352.00<br />
Providing and applying tack coat<br />
with bitumen emuision using<br />
emuision presure distributer at the<br />
rate of 0.20 kg. per sqm on the<br />
prepared bitumen/ granuler surcafe<br />
cleaned with mechanical broom.<br />
43th K.M<br />
1045.00 m2 213.23<br />
605.00<br />
58th K.M 550.00<br />
61th K.M 275.00<br />
63th K.M 275.00<br />
66th K.M 4400.00<br />
67th K.M 2805.00<br />
8910.00 m2 9.28
3.<br />
S/R<br />
N.H.5.7<br />
(ii)<br />
4.<br />
S/R N.H.<br />
8.4(iv)<br />
5.<br />
6.1.1.2<br />
Providing and laying 25mm thick<br />
semi dense bitumeious concrete with<br />
100-120 TPH batch type HMP<br />
providing an average output of 75<br />
tones per our using crushed<br />
aggregates of specified grading<br />
primixed with bituminous binder @<br />
4.5 to 5 percent of mix and fitters<br />
transporting the not mix to m<strong>ark</strong> site<br />
keying with a hydrostatic paver<br />
finsiher with sensor control to the<br />
requried grade level and aliment<br />
roling with smooth wheeled<br />
vibratory area same as item<br />
Providing & laying of hot applied<br />
thermoplastic compound 2.5mm<br />
thick including refloctorised glass<br />
beads @250gms/sqm as per IRC-35<br />
do do all complete job as per<br />
MOSRT & H.S.P Cl No. 803 for<br />
centre line making (Broken)<br />
Earth work in road embankment and<br />
shoulders with ordinary soil (vide<br />
classification o soil item -A)<br />
obtained from borrow pits or any<br />
other source free from logs, slumps,<br />
roots, rubbish or any other<br />
ingredients likely ot deteriorate or<br />
effect the stability of the<br />
embankment including breaking the<br />
clodas maximum to 60mm. cube<br />
placing the earth in layers not<br />
exceeding 225m in loose thickness,<br />
rough dressing, including cost of<br />
cutting and removing shrubs and<br />
roots falling in borrow area, all<br />
complete as per approved desighm<br />
specification and direction of E/I<br />
229.43 m3 7748.94<br />
405.00 m2 384.00<br />
424.57 m3 51.73
6.<br />
S/R<br />
6.1.14.2<br />
7.<br />
S/R<br />
9.1.8<br />
8.<br />
S/R<br />
9.1.9<br />
Rolling and compaction of road<br />
embankment in all kinds of soil<br />
including hard gravelly soil mixed<br />
with boulders by road roller in layers<br />
not exceeding 225mm in loose<br />
thickness do to achieve 90 to 95%<br />
maximum dry density of O.M.C<br />
uniformly including mixing of<br />
requried quantity of water including<br />
cost of supply and carriage of water<br />
with all leads and lifts, finishing the<br />
surface to proper grade, camber or<br />
superelevation icluding cost of hire<br />
charges of road roller providing light<br />
barriers danger signals, chowkidars<br />
all complete as per specification and<br />
direction of E/I<br />
Earth work in excavation of<br />
foundation trenches in ordinary soil<br />
(vide classification of soil item-A)<br />
and disposal of excavated earth so<br />
obtained (50M awary from the edge<br />
of the trench) with initial lead of<br />
150M and initial lift of 1.50M as per<br />
specification and direction of E/I.<br />
54th K.M 501.80<br />
46th K.M 258.62<br />
377.57 m3 11.03<br />
760.42 m3 69.49<br />
Extra for earth work in hard soil<br />
(vide classification of soil item-N)<br />
all complete as per specification and<br />
derection of E/I.<br />
54th K.M 501.80<br />
46th K.M 258.62<br />
760.42 m3 6.02
9.<br />
S/R<br />
9.3.3<br />
10<br />
S/R<br />
9.4.7<br />
11<br />
S/R<br />
9.4.10<br />
Providing and laying P.C.C or R.C.C<br />
(M150) with nominal mix of (1:2:4)<br />
in various components of barrage<br />
foundation with approved quality of<br />
coarse aggregate of required grades<br />
as per design and approved quality<br />
same of requisite F.M. washed and<br />
screned excluding cost of shuttering<br />
on form work as well as of<br />
reinforcement its cutting, bending,<br />
binding and placing but including<br />
necessary tools and plants, vibrating,<br />
cutting royalty and all taxes etc all<br />
complete job as per specification and<br />
direction of E/I.<br />
54th K.M 106.86 m3 4493.57<br />
46th K.M 55.074 m3 4465.82<br />
Providing rough dressed random<br />
rubble stone masonry in CM. (1:3) in<br />
foundation with approved quality of<br />
coarse sand of requisite F.M. washed<br />
and screened with raking out joints,<br />
curing, scaffolding and its removal<br />
wherever required including royalty<br />
and all taxes etc. complete job as per<br />
specification and direction of E/I.<br />
54th K.M 250.64 m3 2750.94<br />
46th K.M 129.176 m3 2713.79<br />
Providing rough dressed random<br />
rubble stone masonry in CM. (1:3) in<br />
super structure with approved quality<br />
of coarse sand of requisite F.M.<br />
washed and screened with raking out<br />
joints, curing, scaffolding and its<br />
removal wherever required including<br />
royalty and all taxes etc. compete job<br />
as per specification and direction of<br />
E/I.<br />
54th K.M 86.45 m3 2821.74<br />
46th K.M 44.555 m3 2784.59
12.<br />
S/R<br />
9.5.4<br />
13.<br />
S/R<br />
8.3.17<br />
14.<br />
S/R<br />
8.3.18<br />
15.<br />
S/R<br />
9.7.6<br />
16.<br />
S/R<br />
9.1.17<br />
Providing 25mm. Thick cement<br />
plaster (1:3)with approved quality<br />
sand of requsite f.M washed and<br />
screned including curing, scaffolding<br />
where ever required and its removal<br />
royalty and all taxes etc. complete<br />
jaob as per direction of E/I.<br />
54th K.M 208.00 m2 183.61<br />
46th K.M 107.20 m2 186.82<br />
Providing shuttering including<br />
strutting propping etc. and its<br />
removal after use in foundation work<br />
as per specification and direction of<br />
E/I<br />
54th K.M 104.00<br />
46th K.M 53.60<br />
157.60 m2 218.74<br />
Providing shuttering including<br />
strutting propping etc. and its<br />
removal after use in super structure<br />
portion of various components of<br />
dam work as per specification and<br />
direction of E/I<br />
54th K.M 26.00 m2<br />
46th K.M 13.40 m2<br />
39.40 m2 230.90<br />
Providing weep holes with dry<br />
grades stone filter of 20mm to<br />
40mm. Size in abutment and wing<br />
wall as per specification and<br />
direction of E/I.<br />
54th K.M 65 Nos<br />
46th K.M 33 Nos<br />
Earth work in filling foundation or<br />
back filling of masonry structures<br />
with semi previous or suitable earth<br />
in layers not exceeding 150mm<br />
thick, well watered, rammed and<br />
fully compacted and finely dresed<br />
with earth obtaining after cutting<br />
from borrow pits with intial lead of<br />
30M and initial lift of 1.5M as per<br />
specification and direction of E/I.<br />
54th K.M 150.80 m3<br />
98 Nos 59.24
17.<br />
S/R<br />
9.1.22<br />
46th K.M 77.72 m3<br />
228.52 m3 49.49<br />
Earth work in filling foundation<br />
trenches or back filling of masonry<br />
structures with previous soil in layers<br />
not exceeding 150mm thick, well<br />
watered, rammed and fully<br />
compacted and finely dresed with<br />
earth obtaining from borrow pits<br />
beyond 150M lead but up to 1/2 Km<br />
with all lifts and carriage by truck<br />
including loading, uloading,<br />
spreading construction and<br />
mainntaenance of haul road etc. a per<br />
specification and direction of E/I<br />
54th K.M 380.25 m3<br />
46th K.M 99.495 m3<br />
479.745 m3 183.88<br />
Executive Engineer,<br />
Road<br />
Division,Jamtara
<strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong> <strong>dk</strong> <strong>dk</strong>;<strong>kZy</strong>;<br />
iFk fuekZ.k foHkkx] iFk ize.My]tkerkM+k<br />
vYi<strong>dk</strong>fyu iqu% fufonk vkea=.k lwpuk<br />
1- foKkiu nkrk <strong>dk</strong> uke%& <strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx]<br />
iFk izeaMy] tkerkM+k<br />
2- ifjek.k foi= dh fcdzh<br />
dh frfFk ,oa le;% & 11-11-11 3%00 cts vijkgu rd<br />
3- fufonk izkfIr dh vafre<br />
frfFk ,oa le;%& 12-11-11 3%00 cts vijkgu rd<br />
4 fufonk [kksyus dh frfFk<br />
,oa le;%& 12-11-11 3%30 cts vijkgu<br />
5 ifjek.k foi= fodzh 1- eq[; <strong>vfHk</strong>;<strong>ark</strong>¼;k0½ iFk fuekZ.k foHkkx <strong>dk</strong> <strong>dk</strong>;<strong>kZy</strong>;]<br />
lh0,e0Mh0vkbZ ifjlj <strong>dk</strong>ads jksM] jkWph<br />
2- v/kh{k.k <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx] iFk vapy]nqe<strong>dk</strong> <strong>dk</strong><br />
<strong>dk</strong>;<strong>kZy</strong>; 3- uxj Fkkuk ifjlj] tkerkM+kA<br />
6 fufonk izkfIr ,oa [kksyus<br />
<strong>dk</strong> LFkku %& dzekad 5 esa n'kkZ;s x;s mfYyf[kr LFkku ijA<br />
7- <strong>dk</strong>;Z <strong>dk</strong> fooj.kh<br />
dz0 <strong>dk</strong>;Z <strong>dk</strong> uke izkDdfyr jkf'k<br />
¼:0 esa½<br />
1- nqe<strong>dk</strong>&elfy;k&dq.Mfgr&ukyk iFk ds<br />
fd0eh0 43(110m), 58(100m),<br />
61(50m), 63(50m),<br />
66(800m),67(510m) es a lrg<br />
uohdj.k ,oa fd0eh0 54osa ,oa 46osa es a<br />
lqj{kk nhokj fuekZ.k <strong>dk</strong>;Z<br />
vxz/ku dh<br />
jkf'k ¼:0½<br />
ifjek.k<br />
foi=<br />
<strong>dk</strong> ewY;¼:½<br />
<strong>dk</strong>;Z lekfIr<br />
dh vof/k<br />
46,63,728.00 94,000.00 5,000.00 3 eghuk<br />
fufonk dh 'krsZ www.jh<strong>ark</strong>hand.gov.in ,oa <strong>dk</strong>;<strong>kZy</strong>; ds lwpuk iVV ij ns[kk tk ldrk gSA<br />
<strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>]<br />
iFk fuekZ.k foHkkx]<br />
iFk ize.My]tkerkM+kA
fufonk dh 'krsaZ<br />
1 ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh es a fuca/ku<br />
Js.kh es a fuca/ku izek.k&i=] v|ru vk;dj lQk;k izek.k i=] okf.kT; dj fuca/ku izek.k i=]<br />
v|ru Je okf.kT; dj lQk;k izek.k i=] v|ru Je vuqKfIr] v|ru pfj= izek.k i= dh<br />
Nk;k izfr ¼<strong>vfHk</strong>izekf.kr½ ,oa ifjek.k foi= <strong>dk</strong> ewY; ¼tks ykSVk;k ugha tk;sxk½ ds lerqY; cSad<br />
MªkIV tks <strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx] iFk ize.My] tkerkM+k ds inuke ls Hkkjrh;<br />
LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] <strong>dk</strong>s layXu djuk vfuok;Z gksxkA<br />
2 fufonk dh vU; fo'ks"k 'krsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa <strong>dk</strong>s ekU; gksxhA<br />
3 fufonknkrk }kjk ifjek.k foi= es a ;Fkk vafdr jkf'k ds vuqlkj fufonk <strong>vfHk</strong>ys[k ds lkFk N%<br />
o"khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd?kj lokf/k tek] tks >kj[kaM jkT; ds<br />
fdlh Hkh Mkd?kj ls fuxZr gks] ds :i es a <strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx] iFk ize.My]<br />
tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxkA<br />
4 fufonk fu"iknu ds lkr fnu ds vUnj laosnd <strong>dk</strong>s ,djkjukek djds <strong>dk</strong>;Z izkjaHk dj nsuk<br />
vfuok;Z gksxkA vU;Fkk nwljs U;wure nj nkrk <strong>dk</strong>s <strong>dk</strong>;Z vkoafVr dj fn;k tk;sxkA<br />
5 'krZ;qDr fufonk ekU; ugha gksxhA<br />
6 fufonk<strong>dk</strong>j ftu <strong>dk</strong>;Z ds fy, fufonk ns jgs gS os Lo;a LFkyh; fLFkfr ns[kdj larq"V gksus ds<br />
ckn gh fufonk nj vafdr djsa aA ckn ea s <strong>dk</strong>sbZ Hkh nkok ekU; ugha gksxkA<br />
7 izkDdfyr jkf'k ?kV c
12 fufonk dh 'krsZ www.jh<strong>ark</strong>hand.gov.in ls Bid Document download dj Hkh fufonk<br />
tek dj ldrs gS ,oa bl<strong>dk</strong> ewY; vyx funsf'kr Lo:Ik es a ls fufonk Mkyrs le; tek djsaxsA<br />
13 fufonk dh 'krksZ <strong>dk</strong>s www.jh<strong>ark</strong>hand.gov.in ,oa v/kksgLrk{kjh <strong>dk</strong>;<strong>kZy</strong>; ds lwpuk iVV<br />
ij ns[kk tk ldrk gSA<br />
14 fdlh <strong>dk</strong>j.ko'k fcdzh ,oa izkfIr dh frfFk <strong>dk</strong>s vo<strong>dk</strong>'k ?kksf"kr gksus ij dze'k% vxys <strong>dk</strong>;Z fnol<br />
<strong>dk</strong>s fcdzh ,oa izkfIRk dh frfFk c
OFFICE OF THE EXECUTIVE ENGINEER<br />
ROAD DIVISION,JAMTARA(JHARKHAND)<br />
SPECIAL CONDITION<br />
1. Tenderers must examine the site and the various aspect likely to affect the construction and cost and<br />
then quote with full knowledge of site conditions.<br />
2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />
3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales tax,<br />
income tax and other taxes, the payment of which will be whole responsibility of the contractor.<br />
4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by the<br />
contractor in Department works.<br />
5. Labour Rules fixed from time to time have also to be followed and quoted rates should include for<br />
all such items.<br />
6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />
before use. The contractor will have to remove all dust foreign materials and unapproved<br />
materials at his own cost.<br />
7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />
required for the execution of work.<br />
8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />
of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which the<br />
Govt. may have under taken (ii) natural calamities, (iii) transport and procurements difficulties,(iv)<br />
Circumstances beyond the control of Govt.<br />
9. Department materials should be used in works strictly in accordance with the actual requirement<br />
and for any differences the cost will be recovered at panel rates which will be double the issue rate.<br />
The contractor should also maintain proper accounts for such materials and should be in a position<br />
to submit the same when ever required.<br />
10. The Contractor will be full responsibility for watch and award of the materials supplied by or to the<br />
Department and the materials will be open to inspection by the Departmental Officer No claim will<br />
be entertained in the case of theft, damages of materials at site till completion of the work.<br />
11. Contractors has to maintain necessary technical organtsation for proper execution of works and<br />
should employ only such persons who are skilled and experienced in the similar nature of works &<br />
the Executive Engineer shall be at liberty of object and enquire the contractor who in his opinion<br />
mis-conducts him self or is incompetent or neg egent in performacne of his duties and such persons<br />
shall not be employed by the contractor whout permission of the Executive Engineer.<br />
12. No Conditional tender will be accepted.<br />
13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance and<br />
stacked as per direction of E/I and be verified before consumption in the work.<br />
14. Leveling dressing and clearing of the site will be done after completion of works as per direction of<br />
Engineer-in-Charge.<br />
15. Empty drums and empty cement bags shall be returned by the contractor to the Department in good<br />
condition at P.W.D. Godown at their own cost. In case of loss of empty drums and ampty cement<br />
bags the cost will be recovered from the contractor double rate of schedule rate .<br />
16. The letters sent to the contractor at the address given in the agreement and returned undelivered will<br />
be treated as to have been served.<br />
17. The Contractor invariably in all kinds of works will have to maintain a site order book at his own<br />
cost duly certified by the S.D.O. or Executive Engineer. The site order book should always be kept<br />
at site and should be produced properly when demanded by inspecting officer for loss of the book<br />
the contractor will be wholly responsible.<br />
18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D.<br />
But the site order book will be the properly of the department.<br />
19. Any addition ordteration in the work must be done under the order of competent authority for which<br />
contractor should get order written on order book duly certified by Gazetted officer of the<br />
Department. the site order book should always be kept at the work sites.<br />
20. Royalty and cess will be recovered from each on account bill in case contractor will fail to produce<br />
royalty clearance certificate at this time of passing of bills.
-2-<br />
21. The value of work to be done should not exceed the agreement amount without the proper<br />
permission of the competent authority.<br />
22. Payment will be made subject to the availability of fund.<br />
23. If the contractor supply boulder, stone metal moorum grave, bricks etc from less distance than<br />
those mentioned in the Bill of quantity then their rates will be reduced propopertionately on basis of<br />
the approved rate of the contractor if the contractors are required to supply the materials from<br />
longer distance then prior approval of the officer who has approved the tender shall have to be<br />
obtained.<br />
24. In case of sectional measurement of earth work, the initial long and cross section of existing ground<br />
will be taken by the Departmental officer in presence of the contractor of their authorized agent and<br />
graphs papers will be prepared showing existing ground level and proposed formation level which<br />
with also from part of the agreement the section plotted on graphs will entered in measurement<br />
book and the contractor will have to sign both the graphs sheets and measurement book for taken of<br />
his acceptance before commencement of the work.<br />
25. Earth work in filling be dons in the layers not exceeding 225mm layers. The surface of the unrolled<br />
earth will be made as per designed grads and cross section after breaking the coldness to the<br />
maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />
moisture content within the permissible limit of the obtimum moisture content. The subsequent<br />
layer of earth on the roller surface will be put only after ensuring that the earth roller has achieved<br />
the designed density at the designed moisture content. In order to ensure the proper compaction the<br />
test result of the compaction will have to be get seen by the Engineer-in-Charge of the work or his<br />
authorized representative.<br />
26. The Item of roller and compection includes the work of breaking the clouds to a maximum to 63<br />
mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing the<br />
earth in required grades and profile.<br />
27. The decution of sale tax will be made from the contractor bill as per order of Jh<strong>ark</strong>hand Govt. from<br />
time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on the<br />
contractor.)<br />
28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />
entertained & the rate to be quoted after decimal point should but no more than two degists.<br />
29. In case of tender filled by registered firm of company character certificate should be enclosed of all<br />
members.<br />
30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />
entertained.<br />
31. All other terms & conditions contained in vigilance department letter no.1/Est.27/83-2347 T.E.C.,<br />
Patna dt. 31.12.83 will be binding on the contractors.<br />
32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes and<br />
grated should be stacked at work site with proper size and for which no claim will be entertained.<br />
Mode of Measurement:<br />
Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />
To be taken to 1 M 3<br />
Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />
To be taken to 1 M 3<br />
Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />
Should be taken to 1 M 3<br />
33. For maintating temperature Every agency must have their own rate thermometer during the<br />
execution of bitumen work.<br />
34. The contractor will be responsible for making good to the Road/Bridge/Culvert repaired by him<br />
of any damage of failure occurs in the road on his own cost up to period<br />
of…………………………….<br />
From the date of completion.<br />
35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />
As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />
quality control test reports of the materials and the work done with the bill.<br />
36. Payment will be done only after finding Satisfactory test reports of the work done.<br />
37. Agreement for work will be done after acquisition of land for purpose approach road.<br />
Executive Engineer,<br />
R.C.D.,Road Division,Jamtara