Govt.of Jh<strong>ark</strong>hand<br />

Road Construction Department<br />

Name of Work :-<br />

Road Circle, Dumka<br />

Bill of Quantity<br />

B.O.Q. surface Renewal in D.M.K Nala<br />

road in K.m 43(110m),58(100m),61(50m),<br />

63(50m),66(800m). 67(510m) and Guard<br />

wall in Km 54 and 46 for the Year 2011-12.<br />

rdinary Repair of JAMA-JAMTARA-RUPNARAYA) TO 103.4 FOR<br />

AR 20-12<br />

OFFICE OF THE EXECUTIVE ENGINEER,<br />

ROAD CONSTRUCTION DEPARTMENT,<br />

ROAD DIVISON,JAMTARA.


Tender paper for filling rates by the tenders on the basis of enclosed approved bill<br />

of quantity for the work of B.O.Q. surface Renewal in D.M.K Nala road in K.m<br />

43(110m),58(100m),61(50m), 63(50m),66(800m). 67(510m) and Guard wall in<br />

Km 54 and 46 for the Year 2011-12.<br />

1.Estimated Cost:- Rs. 46,63,728.00<br />

2. Amount of E.M to be deposited:- Rs. 94,000.00<br />

3. Cost of bill of Quantity:- Rs.5,000.00<br />

4. Time of Completion:- 3 Month<br />

5. Last Date of sale of bill of Quantity:- 11.11.2011 upto 3:00 P.M<br />

6. Date & Time of receiving tender:- 12.11.2011 upto 3:00 P.M<br />

7. Date & Time of Opening the tender:- 12.11.2011 at 3:30 P.M<br />

8. Authority receiving tender:-<br />

C.E (C) / S.E. / E.E. /<br />

R.C.D Ranchi / R.C.D., Dumka/ R.C.D, Jamtara<br />

9. Tenders is to quote his rate on percentage basis of enclosed bill of quantity<br />

rates both in word & figure in the noted colums (Note:- Cross (X) below the other<br />

rates which does not apply him.<br />

10.<br />

(i)in figure:-<br />

(ii)in words:-<br />

Percentage<br />

above the<br />

enclosed<br />

B.O.Q Rates<br />

on all item of<br />

work<br />

Precentage<br />

below the<br />

enclosed<br />

B.O.Q rates on<br />

all item of<br />

work<br />

At the<br />

enclosed bill of<br />

quantity rates<br />

on all item<br />

REMARKS<br />

11. Issued to Sri………………………<br />

12. Name & Complete postal address of<br />

Tenderer:-<br />

13. Registration Number:-<br />

14. Amount of E.M deposited by the tenderer in shape of:-<br />

15. Time of Comletion as Quoted by the tenderer:-<br />

16 Whether T.C.C. I.T.C enclosed on not:-<br />

17. Labour Registration on number :-<br />

18. Total number of sheets tender sheet<br />

incl uding this sheet submitted by<br />

tenderer:-<br />

Executive Engineer<br />

Date , Sign of tenderer R.C.D. Road Division<br />

Jamtara


B.O.Q. surface Renewal in D.M.K Nala road in K.m 43(110m),58(100m)<br />

61(50m), 63(50m),66(800m). 67(510m) and Guard wall in Km 54 and 46 for the<br />

Year 2011-12<br />

Sl.No. Item of work Quantity Unit Rate (Rs.)<br />

1 2 3 4 5<br />

1/<br />

S/R<br />

6.3.22(a)<br />

2.<br />

S/R<br />

N.H.5.2<br />

Providing 50mm thick compacted<br />

built up spray grout over bitumenous<br />

(old) surface in proper grade camber<br />

and superrelevation with stone metal<br />

grade -III(20mm to 37mm size)<br />

@0.66m3 key stone or screening<br />

materials of size 12mm ungraded<br />

@0.13 M3 and bitumen @20kg.<br />

(including taxk coat @5Kg.) all per<br />

10m2 surface including cost of<br />

cleaning the surface properly with<br />

iron brush and broom cost of heating<br />

bitumen to required tem. with cost of<br />

fuel, rolling, providing light, barrier,<br />

danger signal, chowkidar, returning<br />

the empty bitumen drums in good<br />

condition to the godown and hire<br />

charge of roller as pr specification<br />

and direction of E/I(with paked<br />

bitumen)<br />

43th K.M 605.00<br />

58th K.M 49.50<br />

61th K.M 19.25<br />

63th K.M 19.25<br />

66th K.M 352.00<br />

Providing and applying tack coat<br />

with bitumen emuision using<br />

emuision presure distributer at the<br />

rate of 0.20 kg. per sqm on the<br />

prepared bitumen/ granuler surcafe<br />

cleaned with mechanical broom.<br />

43th K.M<br />

1045.00 m2 213.23<br />

605.00<br />

58th K.M 550.00<br />

61th K.M 275.00<br />

63th K.M 275.00<br />

66th K.M 4400.00<br />

67th K.M 2805.00<br />

8910.00 m2 9.28


3.<br />

S/R<br />

N.H.5.7<br />

(ii)<br />

4.<br />

S/R N.H.<br />

8.4(iv)<br />

5.<br />

6.1.1.2<br />

Providing and laying 25mm thick<br />

semi dense bitumeious concrete with<br />

100-120 TPH batch type HMP<br />

providing an average output of 75<br />

tones per our using crushed<br />

aggregates of specified grading<br />

primixed with bituminous binder @<br />

4.5 to 5 percent of mix and fitters<br />

transporting the not mix to m<strong>ark</strong> site<br />

keying with a hydrostatic paver<br />

finsiher with sensor control to the<br />

requried grade level and aliment<br />

roling with smooth wheeled<br />

vibratory area same as item<br />

Providing & laying of hot applied<br />

thermoplastic compound 2.5mm<br />

thick including refloctorised glass<br />

beads @250gms/sqm as per IRC-35<br />

do do all complete job as per<br />

MOSRT & H.S.P Cl No. 803 for<br />

centre line making (Broken)<br />

Earth work in road embankment and<br />

shoulders with ordinary soil (vide<br />

classification o soil item -A)<br />

obtained from borrow pits or any<br />

other source free from logs, slumps,<br />

roots, rubbish or any other<br />

ingredients likely ot deteriorate or<br />

effect the stability of the<br />

embankment including breaking the<br />

clodas maximum to 60mm. cube<br />

placing the earth in layers not<br />

exceeding 225m in loose thickness,<br />

rough dressing, including cost of<br />

cutting and removing shrubs and<br />

roots falling in borrow area, all<br />

complete as per approved desighm<br />

specification and direction of E/I<br />

229.43 m3 7748.94<br />

405.00 m2 384.00<br />

424.57 m3 51.73


6.<br />

S/R<br />

6.1.14.2<br />

7.<br />

S/R<br />

9.1.8<br />

8.<br />

S/R<br />

9.1.9<br />

Rolling and compaction of road<br />

embankment in all kinds of soil<br />

including hard gravelly soil mixed<br />

with boulders by road roller in layers<br />

not exceeding 225mm in loose<br />

thickness do to achieve 90 to 95%<br />

maximum dry density of O.M.C<br />

uniformly including mixing of<br />

requried quantity of water including<br />

cost of supply and carriage of water<br />

with all leads and lifts, finishing the<br />

surface to proper grade, camber or<br />

superelevation icluding cost of hire<br />

charges of road roller providing light<br />

barriers danger signals, chowkidars<br />

all complete as per specification and<br />

direction of E/I<br />

Earth work in excavation of<br />

foundation trenches in ordinary soil<br />

(vide classification of soil item-A)<br />

and disposal of excavated earth so<br />

obtained (50M awary from the edge<br />

of the trench) with initial lead of<br />

150M and initial lift of 1.50M as per<br />

specification and direction of E/I.<br />

54th K.M 501.80<br />

46th K.M 258.62<br />

377.57 m3 11.03<br />

760.42 m3 69.49<br />

Extra for earth work in hard soil<br />

(vide classification of soil item-N)<br />

all complete as per specification and<br />

derection of E/I.<br />

54th K.M 501.80<br />

46th K.M 258.62<br />

760.42 m3 6.02


9.<br />

S/R<br />

9.3.3<br />

10<br />

S/R<br />

9.4.7<br />

11<br />

S/R<br />

9.4.10<br />

Providing and laying P.C.C or R.C.C<br />

(M150) with nominal mix of (1:2:4)<br />

in various components of barrage<br />

foundation with approved quality of<br />

coarse aggregate of required grades<br />

as per design and approved quality<br />

same of requisite F.M. washed and<br />

screned excluding cost of shuttering<br />

on form work as well as of<br />

reinforcement its cutting, bending,<br />

binding and placing but including<br />

necessary tools and plants, vibrating,<br />

cutting royalty and all taxes etc all<br />

complete job as per specification and<br />

direction of E/I.<br />

54th K.M 106.86 m3 4493.57<br />

46th K.M 55.074 m3 4465.82<br />

Providing rough dressed random<br />

rubble stone masonry in CM. (1:3) in<br />

foundation with approved quality of<br />

coarse sand of requisite F.M. washed<br />

and screened with raking out joints,<br />

curing, scaffolding and its removal<br />

wherever required including royalty<br />

and all taxes etc. complete job as per<br />

specification and direction of E/I.<br />

54th K.M 250.64 m3 2750.94<br />

46th K.M 129.176 m3 2713.79<br />

Providing rough dressed random<br />

rubble stone masonry in CM. (1:3) in<br />

super structure with approved quality<br />

of coarse sand of requisite F.M.<br />

washed and screened with raking out<br />

joints, curing, scaffolding and its<br />

removal wherever required including<br />

royalty and all taxes etc. compete job<br />

as per specification and direction of<br />

E/I.<br />

54th K.M 86.45 m3 2821.74<br />

46th K.M 44.555 m3 2784.59


12.<br />

S/R<br />

9.5.4<br />

13.<br />

S/R<br />

8.3.17<br />

14.<br />

S/R<br />

8.3.18<br />

15.<br />

S/R<br />

9.7.6<br />

16.<br />

S/R<br />

9.1.17<br />

Providing 25mm. Thick cement<br />

plaster (1:3)with approved quality<br />

sand of requsite f.M washed and<br />

screned including curing, scaffolding<br />

where ever required and its removal<br />

royalty and all taxes etc. complete<br />

jaob as per direction of E/I.<br />

54th K.M 208.00 m2 183.61<br />

46th K.M 107.20 m2 186.82<br />

Providing shuttering including<br />

strutting propping etc. and its<br />

removal after use in foundation work<br />

as per specification and direction of<br />

E/I<br />

54th K.M 104.00<br />

46th K.M 53.60<br />

157.60 m2 218.74<br />

Providing shuttering including<br />

strutting propping etc. and its<br />

removal after use in super structure<br />

portion of various components of<br />

dam work as per specification and<br />

direction of E/I<br />

54th K.M 26.00 m2<br />

46th K.M 13.40 m2<br />

39.40 m2 230.90<br />

Providing weep holes with dry<br />

grades stone filter of 20mm to<br />

40mm. Size in abutment and wing<br />

wall as per specification and<br />

direction of E/I.<br />

54th K.M 65 Nos<br />

46th K.M 33 Nos<br />

Earth work in filling foundation or<br />

back filling of masonry structures<br />

with semi previous or suitable earth<br />

in layers not exceeding 150mm<br />

thick, well watered, rammed and<br />

fully compacted and finely dresed<br />

with earth obtaining after cutting<br />

from borrow pits with intial lead of<br />

30M and initial lift of 1.5M as per<br />

specification and direction of E/I.<br />

54th K.M 150.80 m3<br />

98 Nos 59.24


17.<br />

S/R<br />

9.1.22<br />

46th K.M 77.72 m3<br />

228.52 m3 49.49<br />

Earth work in filling foundation<br />

trenches or back filling of masonry<br />

structures with previous soil in layers<br />

not exceeding 150mm thick, well<br />

watered, rammed and fully<br />

compacted and finely dresed with<br />

earth obtaining from borrow pits<br />

beyond 150M lead but up to 1/2 Km<br />

with all lifts and carriage by truck<br />

including loading, uloading,<br />

spreading construction and<br />

mainntaenance of haul road etc. a per<br />

specification and direction of E/I<br />

54th K.M 380.25 m3<br />

46th K.M 99.495 m3<br />

479.745 m3 183.88<br />

Executive Engineer,<br />

Road<br />

Division,Jamtara


<strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong> <strong>dk</strong> <strong>dk</strong>;<strong>kZy</strong>;<br />

iFk fuekZ.k foHkkx] iFk ize.My]tkerkM+k<br />

vYi<strong>dk</strong>fyu iqu% fufonk vkea=.k lwpuk<br />

1- foKkiu nkrk <strong>dk</strong> uke%& <strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx]<br />

iFk izeaMy] tkerkM+k<br />

2- ifjek.k foi= dh fcdzh<br />

dh frfFk ,oa le;% & 11-11-11 3%00 cts vijkgu rd<br />

3- fufonk izkfIr dh vafre<br />

frfFk ,oa le;%& 12-11-11 3%00 cts vijkgu rd<br />

4 fufonk [kksyus dh frfFk<br />

,oa le;%& 12-11-11 3%30 cts vijkgu<br />

5 ifjek.k foi= fodzh 1- eq[; <strong>vfHk</strong>;<strong>ark</strong>¼;k0½ iFk fuekZ.k foHkkx <strong>dk</strong> <strong>dk</strong>;<strong>kZy</strong>;]<br />

lh0,e0Mh0vkbZ ifjlj <strong>dk</strong>ads jksM] jkWph<br />

2- v/kh{k.k <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx] iFk vapy]nqe<strong>dk</strong> <strong>dk</strong><br />

<strong>dk</strong>;<strong>kZy</strong>; 3- uxj Fkkuk ifjlj] tkerkM+kA<br />

6 fufonk izkfIr ,oa [kksyus<br />

<strong>dk</strong> LFkku %& dzekad 5 esa n'kkZ;s x;s mfYyf[kr LFkku ijA<br />

7- <strong>dk</strong>;Z <strong>dk</strong> fooj.kh<br />

dz0 <strong>dk</strong>;Z <strong>dk</strong> uke izkDdfyr jkf'k<br />

¼:0 esa½<br />

1- nqe<strong>dk</strong>&elfy;k&dq.Mfgr&ukyk iFk ds<br />

fd0eh0 43(110m), 58(100m),<br />

61(50m), 63(50m),<br />

66(800m),67(510m) es a lrg<br />

uohdj.k ,oa fd0eh0 54osa ,oa 46osa es a<br />

lqj{kk nhokj fuekZ.k <strong>dk</strong>;Z<br />

vxz/ku dh<br />

jkf'k ¼:0½<br />

ifjek.k<br />

foi=<br />

<strong>dk</strong> ewY;¼:½<br />

<strong>dk</strong>;Z lekfIr<br />

dh vof/k<br />

46,63,728.00 94,000.00 5,000.00 3 eghuk<br />

fufonk dh 'krsZ www.jh<strong>ark</strong>hand.gov.in ,oa <strong>dk</strong>;<strong>kZy</strong>; ds lwpuk iVV ij ns[kk tk ldrk gSA<br />

<strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>]<br />

iFk fuekZ.k foHkkx]<br />

iFk ize.My]tkerkM+kA


fufonk dh 'krsaZ<br />

1 ifjek.k foi= ds dz; gsrq vkosnu i= ds lkFk iFk fuekZ.k foHkkx ds leqfpr Js.kh es a fuca/ku<br />

Js.kh es a fuca/ku izek.k&i=] v|ru vk;dj lQk;k izek.k i=] okf.kT; dj fuca/ku izek.k i=]<br />

v|ru Je okf.kT; dj lQk;k izek.k i=] v|ru Je vuqKfIr] v|ru pfj= izek.k i= dh<br />

Nk;k izfr ¼<strong>vfHk</strong>izekf.kr½ ,oa ifjek.k foi= <strong>dk</strong> ewY; ¼tks ykSVk;k ugha tk;sxk½ ds lerqY; cSad<br />

MªkIV tks <strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx] iFk ize.My] tkerkM+k ds inuke ls Hkkjrh;<br />

LVsV cSad] tkerkM+k esa gh Hkqxrs; gks] <strong>dk</strong>s layXu djuk vfuok;Z gksxkA<br />

2 fufonk dh vU; fo'ks"k 'krsZ fufonk i= ds lkFk layXu jgsxk tks fufonnkrkvksa <strong>dk</strong>s ekU; gksxhA<br />

3 fufonknkrk }kjk ifjek.k foi= es a ;Fkk vafdr jkf'k ds vuqlkj fufonk <strong>vfHk</strong>ys[k ds lkFk N%<br />

o"khZ; cpr izek.k i= ¼8okW fuxZe½ ;k ikWp o’khZ; Mkd?kj lokf/k tek] tks >kj[kaM jkT; ds<br />

fdlh Hkh Mkd?kj ls fuxZr gks] ds :i es a <strong>dk</strong>;<strong>Zikyd</strong> <strong>vfHk</strong>;<strong>ark</strong>] iFk fuekZ.k foHkkx] iFk ize.My]<br />

tkerkM+k ds inuke ls fof/kor izfrKIr djk dj tek djuk vfuok;Z gksxkA<br />

4 fufonk fu"iknu ds lkr fnu ds vUnj laosnd <strong>dk</strong>s ,djkjukek djds <strong>dk</strong>;Z izkjaHk dj nsuk<br />

vfuok;Z gksxkA vU;Fkk nwljs U;wure nj nkrk <strong>dk</strong>s <strong>dk</strong>;Z vkoafVr dj fn;k tk;sxkA<br />

5 'krZ;qDr fufonk ekU; ugha gksxhA<br />

6 fufonk<strong>dk</strong>j ftu <strong>dk</strong>;Z ds fy, fufonk ns jgs gS os Lo;a LFkyh; fLFkfr ns[kdj larq"V gksus ds<br />

ckn gh fufonk nj vafdr djsa aA ckn ea s <strong>dk</strong>sbZ Hkh nkok ekU; ugha gksxkA<br />

7 izkDdfyr jkf'k ?kV c


12 fufonk dh 'krsZ www.jh<strong>ark</strong>hand.gov.in ls Bid Document download dj Hkh fufonk<br />

tek dj ldrs gS ,oa bl<strong>dk</strong> ewY; vyx funsf'kr Lo:Ik es a ls fufonk Mkyrs le; tek djsaxsA<br />

13 fufonk dh 'krksZ <strong>dk</strong>s www.jh<strong>ark</strong>hand.gov.in ,oa v/kksgLrk{kjh <strong>dk</strong>;<strong>kZy</strong>; ds lwpuk iVV<br />

ij ns[kk tk ldrk gSA<br />

14 fdlh <strong>dk</strong>j.ko'k fcdzh ,oa izkfIr dh frfFk <strong>dk</strong>s vo<strong>dk</strong>'k ?kksf"kr gksus ij dze'k% vxys <strong>dk</strong>;Z fnol<br />

<strong>dk</strong>s fcdzh ,oa izkfIRk dh frfFk c


OFFICE OF THE EXECUTIVE ENGINEER<br />

ROAD DIVISION,JAMTARA(JHARKHAND)<br />

SPECIAL CONDITION<br />

1. Tenderers must examine the site and the various aspect likely to affect the construction and cost and<br />

then quote with full knowledge of site conditions.<br />

2. The work must be carried out strictly as per P.W.D.& M.O.S.T., specification.<br />

3. All rates quoted on the tender should be for completed job including all carriage royalty, Sales tax,<br />

income tax and other taxes, the payment of which will be whole responsibility of the contractor.<br />

4 Rules laid down in Motors vehicle Act will have also to be followed if any vehicles are used by the<br />

contractor in Department works.<br />

5. Labour Rules fixed from time to time have also to be followed and quoted rates should include for<br />

all such items.<br />

6. Stone Chips, Stone metal, lime, bricks and jhama should be got approved by the Engineer-incharge<br />

before use. The contractor will have to remove all dust foreign materials and unapproved<br />

materials at his own cost.<br />

7. Tenderers have to made his complete arrangements for all accessories plants and machineries<br />

required for the execution of work.<br />

8. The Contractor shall not be entitled to claim any compensation for the loss suffered by him onaccount<br />

of (i) failure or delay by or on behalf of Govt. In the supply of materials of stores which the<br />

Govt. may have under taken (ii) natural calamities, (iii) transport and procurements difficulties,(iv)<br />

Circumstances beyond the control of Govt.<br />

9. Department materials should be used in works strictly in accordance with the actual requirement<br />

and for any differences the cost will be recovered at panel rates which will be double the issue rate.<br />

The contractor should also maintain proper accounts for such materials and should be in a position<br />

to submit the same when ever required.<br />

10. The Contractor will be full responsibility for watch and award of the materials supplied by or to the<br />

Department and the materials will be open to inspection by the Departmental Officer No claim will<br />

be entertained in the case of theft, damages of materials at site till completion of the work.<br />

11. Contractors has to maintain necessary technical organtsation for proper execution of works and<br />

should employ only such persons who are skilled and experienced in the similar nature of works &<br />

the Executive Engineer shall be at liberty of object and enquire the contractor who in his opinion<br />

mis-conducts him self or is incompetent or neg egent in performacne of his duties and such persons<br />

shall not be employed by the contractor whout permission of the Executive Engineer.<br />

12. No Conditional tender will be accepted.<br />

13 Stone chips & Stone metal as per requirement will have to collected in full quantity in advance and<br />

stacked as per direction of E/I and be verified before consumption in the work.<br />

14. Leveling dressing and clearing of the site will be done after completion of works as per direction of<br />

Engineer-in-Charge.<br />

15. Empty drums and empty cement bags shall be returned by the contractor to the Department in good<br />

condition at P.W.D. Godown at their own cost. In case of loss of empty drums and ampty cement<br />

bags the cost will be recovered from the contractor double rate of schedule rate .<br />

16. The letters sent to the contractor at the address given in the agreement and returned undelivered will<br />

be treated as to have been served.<br />

17. The Contractor invariably in all kinds of works will have to maintain a site order book at his own<br />

cost duly certified by the S.D.O. or Executive Engineer. The site order book should always be kept<br />

at site and should be produced properly when demanded by inspecting officer for loss of the book<br />

the contractor will be wholly responsible.<br />

18. Entries in the site order Book will not be made by any officer les then the rank of S.D.O.,R.C.D.<br />

But the site order book will be the properly of the department.<br />

19. Any addition ordteration in the work must be done under the order of competent authority for which<br />

contractor should get order written on order book duly certified by Gazetted officer of the<br />

Department. the site order book should always be kept at the work sites.<br />

20. Royalty and cess will be recovered from each on account bill in case contractor will fail to produce<br />

royalty clearance certificate at this time of passing of bills.


-2-<br />

21. The value of work to be done should not exceed the agreement amount without the proper<br />

permission of the competent authority.<br />

22. Payment will be made subject to the availability of fund.<br />

23. If the contractor supply boulder, stone metal moorum grave, bricks etc from less distance than<br />

those mentioned in the Bill of quantity then their rates will be reduced propopertionately on basis of<br />

the approved rate of the contractor if the contractors are required to supply the materials from<br />

longer distance then prior approval of the officer who has approved the tender shall have to be<br />

obtained.<br />

24. In case of sectional measurement of earth work, the initial long and cross section of existing ground<br />

will be taken by the Departmental officer in presence of the contractor of their authorized agent and<br />

graphs papers will be prepared showing existing ground level and proposed formation level which<br />

with also from part of the agreement the section plotted on graphs will entered in measurement<br />

book and the contractor will have to sign both the graphs sheets and measurement book for taken of<br />

his acceptance before commencement of the work.<br />

25. Earth work in filling be dons in the layers not exceeding 225mm layers. The surface of the unrolled<br />

earth will be made as per designed grads and cross section after breaking the coldness to the<br />

maximum size of 63mm rolling will be done after censuring that the earth to be rolled have<br />

moisture content within the permissible limit of the obtimum moisture content. The subsequent<br />

layer of earth on the roller surface will be put only after ensuring that the earth roller has achieved<br />

the designed density at the designed moisture content. In order to ensure the proper compaction the<br />

test result of the compaction will have to be get seen by the Engineer-in-Charge of the work or his<br />

authorized representative.<br />

26. The Item of roller and compection includes the work of breaking the clouds to a maximum to 63<br />

mm, cube and placing the earth in layers not exceeding 225 mm thick and shaping and dressing the<br />

earth in required grades and profile.<br />

27. The decution of sale tax will be made from the contractor bill as per order of Jh<strong>ark</strong>hand Govt. from<br />

time to time (Conlained in Bihar F.D.(Coml. taxes) No.2138 dt.19-1-84 will be binding on the<br />

contractor.)<br />

28. The rate quoted less than 15% of estimated cost including Government materials will not be<br />

entertained & the rate to be quoted after decimal point should but no more than two degists.<br />

29. In case of tender filled by registered firm of company character certificate should be enclosed of all<br />

members.<br />

30. Quantities given in Bill of quantity are subject to variation and no claim of this score will be<br />

entertained.<br />

31. All other terms & conditions contained in vigilance department letter no.1/Est.27/83-2347 T.E.C.,<br />

Patna dt. 31.12.83 will be binding on the contractors.<br />

32. Vide Engr.-in – Chief Memo No. 2553 (E) dt. 4-5-90 the supply of Materials of different sizes and<br />

grated should be stacked at work site with proper size and for which no claim will be entertained.<br />

Mode of Measurement:<br />

Stone Chips & Moorum - 1.5 M x 1.5 M x 0.45 M<br />

To be taken to 1 M 3<br />

Stone Metal Grade-I 1.5 M x 1.5 M x 0.55 M<br />

To be taken to 1 M 3<br />

Stone Metal Gr.-II & III 1.5 M x 1.5 M x 0.52 M<br />

Should be taken to 1 M 3<br />

33. For maintating temperature Every agency must have their own rate thermometer during the<br />

execution of bitumen work.<br />

34. The contractor will be responsible for making good to the Road/Bridge/Culvert repaired by him<br />

of any damage of failure occurs in the road on his own cost up to period<br />

of…………………………….<br />

From the date of completion.<br />

35. Contractor must have to be establish a quality control laboratory at the work site at his own cost.<br />

As per direction of MOST & Quality Control. The Agency will have to submit time to time the<br />

quality control test reports of the materials and the work done with the bill.<br />

36. Payment will be done only after finding Satisfactory test reports of the work done.<br />

37. Agreement for work will be done after acquisition of land for purpose approach road.<br />

Executive Engineer,<br />

R.C.D.,Road Division,Jamtara