GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 01<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Surface Renewal to Doranda- Shankh-<br />

Vendro-Patna Road in km 1, 2, 6, 7, 8(500),<br />

19, 20 and 21 for year 2011-12<br />

Estimated cost : Rs. 44,80,943/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />

Earnest Money : Rs. 89,700/-<br />

Time <strong>of</strong> Completion : Four Months<br />

OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />

ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIV DIVISION<br />

DIV DIV ISION<br />

KODERMA.<br />

KODERMA.<br />

KODERMA.<br />

1


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

1250/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Surface Renual to Doranda- Shankh-Vendro-Patna Road in km 1, 2,<br />

6, 7 ,8(500), 19, 20 and 21 for year 2011-12 in R.C.D., Road Division Koderma For Year 2011-12 and will be<br />

opened in the presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective<br />

<strong>of</strong>ficer in their <strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 44,80,943/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 89,700/- for the work.<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned on from 12-10-2011 to 13-10-2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

2


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to Four months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

3<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Surface Renual to Doranda- Shankh-Vendro-Patna Road in<br />

Sl.<br />

o.<br />

km 1, 2, 6, 7 ,8(500), 19, 20 and 21 for year 2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Providing and laying 50 mm thick Bituminous<br />

macadam with 100-120 TPH hot-mix plant producing<br />

an average out-put <strong>of</strong> 75 tonnes/hrs. using crushed<br />

aggregates <strong>of</strong> specified grading premixed with<br />

bituminous binder, transported to site, laid over a<br />

previously prepared surface with paver finisher to the<br />

required grade level and alignment and rolled as per<br />

clauses 501.6 and 501.70 to achieve the desired<br />

compaction.<br />

4<br />

sqm<br />

2. Providing and laying 25 mm thick semi-dense<br />

bituminous concrete with -100-120 TPH batch type<br />

HMP producing an average out-put <strong>of</strong> 75 tonnes/hrs.<br />

using crushed aggregates <strong>of</strong> specified grading<br />

premixed with bituminous binder @ 4.5 to 5.0 percent<br />

<strong>of</strong> mix and filler transporting the hot-mix plant to work<br />

site, having with a hydraulic paver finisher with sensor<br />

control to required grade level and alignment, rolling<br />

with smooth wheeled vibratory and tandem rollers to<br />

achieve the desired compaction as per MORT&H<br />

specification clause No. 508, complete in all respects. sqm<br />

22.87<br />

577.59<br />

(Rupees Five<br />

Thousand<br />

Three Hundred<br />

Forty Three)<br />

only<br />

Rs. 5,343.00<br />

(Rupees Seven<br />

Thousand Five<br />

Hundred Forty<br />

Six & paise<br />

Forty four)<br />

only<br />

Rs. 7546.44<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the Road Bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractor’s responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no claim<br />

in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

5


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

6


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

7


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />

tk,xhA<br />

¼x½ ¼x½ fufo fufonk fufo fufonk<br />

nk vkea=.k vkea=.k lwpuk lwpuk es es izdkf'kr izdkf'kr lHkh lHkh ca/kusa ca/kusa ekU; ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk vfHk;Urk j[kkuk j[kkuk j[kkuk vko';d vko';d vko';d gS] gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />

A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

8


fufonk fufonk dh dh ’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

9


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

11<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 02<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Special Repair work in Koderma-Jamua<br />

Road in km 1(P), 2(P), 5(P), and 49(P) for<br />

the year 2011-12.<br />

Estimated cost : Rs. 22,41,789/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />

Earnest Money : Rs. 44,900/-<br />

Time <strong>of</strong> Completion : Three Months<br />

OFFICE OFFICE OF OF OF THE THE EXECUTIVE EXECUTIVE ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., ROAD ROAD DIVISION<br />

DIVISION<br />

KODERMA.<br />

KODERMA.<br />

12


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

5000/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14.10.2011 by the Chief Engineer(comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Special Repair work in Koderma-Jamua Road in km 1(P), 2(P), 5(P),<br />

and 49(P).in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the presence <strong>of</strong> the<br />

Contractors or their authorized agents on 14.10.2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their <strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 22,41,789/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 44,900/- for the work .<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned from 12.10.2011 to 13.10.2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

13


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to three month from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

14<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Special Repair work in Koderma-Jamua Road in km 1(P),<br />

Sl.<br />

o.<br />

2(P), 5(P), and 49(P) for the year 2011-12.<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Dry lean cement concrete sub-base (construction<br />

<strong>of</strong> dry lean cement concrete sub-base over<br />

prepared sub-grade with coarse and fine aggregates<br />

confirming to IS – 383 the size <strong>of</strong> course aggregate<br />

not exceeding 25 mm, aggregate ratio not to<br />

exceed 15:1 aggregate gradation after blending to<br />

be as per table 600-1 cement concrete not to be<br />

less than 150 kg/cum, OMC to be determined<br />

during trail length construction, concrete strength<br />

not to be less than 10 MPQ at 7 days mixed in<br />

concrete mixture transported to site laid with<br />

manually compacted with compactor finishing and<br />

curing.<br />

(a) In km 1(P), 2(P), 5(P)<br />

(b) In km 49(P)<br />

2. Construction <strong>of</strong> unreinforced dowel joined plain<br />

cement concrete pavement over prepared sub-base<br />

with 43 grade cement @ 400 kg/cum coarse and<br />

find aggregate confirming to IS -383 maximum<br />

size <strong>of</strong> coarse aggregate not exceeding 25 mm<br />

mixed in concrete mixture as per approved mixed<br />

design, transported to site laid with a fixed form <strong>of</strong><br />

sleep from spread compacted and finished in a<br />

continuous operation including provision <strong>of</strong><br />

continuous expansion construction and<br />

longitudinal joints, joints filter etc. in lines and<br />

grade as per technical specification and direction<br />

<strong>of</strong> E/I. Excluding the cost <strong>of</strong> dowel and tie bars etc.<br />

(a) In km 1(P), 2(P), 5(P)<br />

15<br />

cum<br />

cum<br />

(a)137.50<br />

(b) 27.50<br />

(a) 343.75<br />

(Rupees One<br />

Thousand Eight<br />

Hundred Thirty<br />

Seven & paise<br />

Ninety One ) only<br />

Rs. 1837.91<br />

(Rupees One<br />

Thousand Eight<br />

Hundred Eighty<br />

Eight & paise<br />

Eighty Three) only<br />

Rs. 1888.83<br />

(Rupees Four<br />

Thousand Three<br />

Hundred Seventy<br />

Two & paise Fifty<br />

Three) only<br />

Rs. 4372.53


(b) In km 49(P)<br />

3. Construction <strong>of</strong> sub-grade and earthen shoulder<br />

with approved material obtained from borrow pits<br />

or any other sources free from logs, stamps, roots,<br />

rubbish or any other ingredients likely to<br />

deteriorate or effect the stability <strong>of</strong> the<br />

embankment including breaking with all leads and<br />

lifts including breaking the clods to maximum to<br />

60 mm cube, placing the earth in layer not<br />

exceeding 225 mm in loose thickness, rough<br />

dressed including cost <strong>of</strong> cutting and removing<br />

shrubs and roots falling in borrow areas all<br />

complete job as per approved design, specification<br />

and direction <strong>of</strong> E/I (Table No. 300-2).<br />

(a) In km 1(P), 2(P), 5(P)<br />

(b) In km 49(P)<br />

4. Providing stone metal grade –ii (63 mm to 45 mm<br />

size) M.O.S.T. specification including hand<br />

packing consolidation with approved quality <strong>of</strong><br />

screening materials mooram having P.I. value not<br />

more than 6 @ 23% loose quantity <strong>of</strong> stone metal<br />

in proper grade camber or super elevation (laid<br />

loose thickness to be 1.33 times the prescribed<br />

compacted thickness <strong>of</strong> stone metals) dry and wet<br />

rolling with power road roller making and<br />

maintaining diversion including cost <strong>of</strong> labour and<br />

materials such as stone metals and mooram all<br />

taxes, royalty and etc. also including cost <strong>of</strong> P.O.I<br />

and all other lubricants and also hire charges <strong>of</strong><br />

road roller without depreciation and major repair<br />

and carriage <strong>of</strong> materials and water with all leads<br />

and complete job as per direction <strong>of</strong> E/I.<br />

(a) In km 1(P), 2(P), 5(P)<br />

16<br />

cum<br />

(b) 68.75<br />

(a) 350.00<br />

(a) 70.00<br />

cum 28.28<br />

5. Providing stone metal grade –iii (53.2 mm to 22.4<br />

mm size) confirming M.O.S.T. specification<br />

including hand packing consolidation with 33.01 982.38<br />

(Rupees<br />

Four Thousand<br />

Four Hundred<br />

Fifteen & paise<br />

Twenty) only<br />

Rs. 4415.20<br />

(Rupees One<br />

Hundred Seventy<br />

One) only<br />

Rs. 171.00<br />

(Rupees One<br />

Hundred Seventy<br />

One) only<br />

Rs. 171.00<br />

(Rupees Nine<br />

Hundred Twenty<br />

Nine & paise<br />

Thirty Eight) only<br />

Rs. 929.38<br />

(Rupees Nine<br />

Hundred Eighty<br />

Two & paise


approved quality <strong>of</strong> screening materials mooram<br />

having P.I. value not more than 6 @ 23% loose<br />

quantity <strong>of</strong> stone metal in proper grade, camber or<br />

super elevation (laid loose thickness to be 1.33<br />

times the prescribed compacted thickness <strong>of</strong> stone<br />

metals) dry and wet rolling with power road roller<br />

inclusive <strong>of</strong> water with all leads and lifts providing<br />

light danger signal, chaukidar, making and<br />

maintaining diversion including cost <strong>of</strong> stone<br />

metals and mooram all taxes, royalty and etc. also<br />

including cost <strong>of</strong> P.O.I and all other lubricants and<br />

also hire charges <strong>of</strong> road roller without<br />

depreciation and major repair and carriage <strong>of</strong><br />

materials and water with all leads and complete job<br />

as per specification and direction <strong>of</strong> E/I. (mode <strong>of</strong><br />

measurement to compacted quantity)<br />

(a) In km 1(P), 2(P), 5(P)<br />

17<br />

Thirty Eight) only<br />

Rs. 982.38<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the road bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

18


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

19


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

20


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuek fuekZ.k fuek Z.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />

tk,xhA<br />

¼x½ fufonk vkea=.k lwpuk es izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM &&<br />

& 3 3 laosnd laosnd 10 10 10 yk[k yk[k ds ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk tk;sxk A<br />

A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

21


fufonk fufonk dh dh ’krsZ<br />

’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

22


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

24<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 03<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> 3.00m X 2.00m RCC Slab<br />

Culvert in Koderma Jamua Road in Km 2<br />

(2/3) for the year 2011-12<br />

Estimated cost : Rs. 14,77,742/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 2,500/-<br />

Earnest Money : Rs. 29,600/-<br />

Time <strong>of</strong> Completion : Four Months<br />

OFFICE OFFICE OFFICE OF OF THE THE EXE EXECUTIVE EXE CUTIVE ENGINEER<br />

ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., ROAD ROAD DIVISION<br />

DIVISION<br />

KODERMA.<br />

KODERMA.<br />

KODERMA.<br />

25


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

2,500/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14.10.2011 by the Chief Engineer(comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> 3.00m X 2.00m RCC Slab Culvert In Koderma<br />

Jamua Road in Km 2 (2/3) in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the<br />

presence <strong>of</strong> the Contractors or their authorized agents on 14.10.2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their<br />

<strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 14,77,742/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 29,600/- for the work .<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned from 12.10.2011 to 13.10.2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

26


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to Four Months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

27<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> 3.00m X 2.00m RCC Slab Culvert In<br />

Koderma Jamua Road in Km 2 (2/3) for the year 2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

Sl.<br />

o.<br />

1 2 3 4 5<br />

1 Dismantling <strong>of</strong> existing structures like culverts,<br />

bridges, retaining walls and other structure<br />

comprising <strong>of</strong> masonry, cement concrete, wood<br />

work, steel work, including T&P and scaffolding<br />

wherever necessary, shorting the dismantled<br />

material, disposal <strong>of</strong> unserviceable material and<br />

stacking the serviceable material with all lifts and<br />

lead <strong>of</strong> 1000 metres<br />

(i) R.C.C. by mechanical means<br />

16.60<br />

Cum<br />

2. E/W in excavation <strong>of</strong> foundn. Trenches for bridges<br />

with all materials, labour, tools, and plants,<br />

leveling and ramming the foundation beds,<br />

dressing the sides, removing roots, logs, shrubs<br />

and other loose and deleterious materials likely to<br />

deteriorate, adequate provision against erosion,<br />

water pollution and drainage to keep the site free<br />

<strong>of</strong> water, stacking the excavated soil clear from<br />

the edge <strong>of</strong> excavation, providing light, barrier,<br />

danger signals, choukidar, making and<br />

maintaining diversion, traffic regulation all<br />

complete job as per design/drawing and technical<br />

specification and MORT&H specification clause<br />

304 and other relevant clauses and direction <strong>of</strong><br />

E/I (Excluding cost <strong>of</strong> dewatering and shoring)(i)<br />

Ordinary Soil. Cum 178.305<br />

3. Providing P.C.C./R.C.C. M-150 with nominal mix<br />

(1:2:4) with approved quality <strong>of</strong> stone chips 20<br />

mm to 6 mm size and clean coarse sand <strong>of</strong> 2.5 to<br />

3.5 F.M. in foundation and plinth including mixing<br />

cement concrete in mixer, Screening royalty and<br />

all taxes with hire charges <strong>of</strong> machinery all<br />

complete with cost all labour and materials as per<br />

MOST specification and direction <strong>of</strong> E/I. Cum 119.792<br />

4. Providing P.C.C./R.C.C. M-10 with nominal mix<br />

(1:3:6) in foundation <strong>of</strong> various component <strong>of</strong><br />

culvert and bridge with approved quality <strong>of</strong> stone<br />

metal grade- iv (20mm to 37 mm size) and clean<br />

coarse sand <strong>of</strong> F.M. 2.5 to 3 including screening<br />

mixing cement concrete in mixer, and placing and<br />

in position vibrating screening curing taxes and<br />

royalty including the cost <strong>of</strong> all materials and<br />

labour complete job as per approved<br />

design/drawing and relevant clause M.O.S.T.<br />

specification and direction <strong>of</strong> E/I. including cost <strong>of</strong> Cum 16.945<br />

28<br />

(Rupees Five<br />

Hundred Fifty Seven)<br />

only<br />

557.00<br />

(Rupees Forty One &<br />

paise Fifteen) only<br />

41.15<br />

(Rupees Four<br />

Thousand One<br />

Hundred Twenty<br />

Four & paise Ninety<br />

Nine) only<br />

4124.99<br />

(Rupees Three<br />

Thousand One<br />

Hundred Sixty<br />

Seven& paise<br />

Seventy Three) only<br />

3167.73


machine but excluding the cost <strong>of</strong> shuttering.<br />

5. Providing P.C.C./R.C.C. M-150 with nominal mix<br />

(1:2:4) in superstructure/substructure <strong>of</strong> various<br />

component <strong>of</strong> culverts and bridge with 20 mm to<br />

6 mm stone chips (20 mm to 10 mm, 2 part and<br />

10 mm to 6 mm 1 part) and clean coarse sand<br />

F.M. 2.0 to 3.5 F.M. including mixing cement<br />

concrete in mixture screening royalty and all taxes<br />

with hire charges <strong>of</strong> machinery all complete with<br />

cost <strong>of</strong> all labour and materials as per MOST<br />

specification and direction <strong>of</strong> E/I. Cum 95.95<br />

6. Providing PCC/RCC M-200 with nominal mix<br />

(1:1.5:3) with approved quality <strong>of</strong> stone chips 20<br />

mm to 6 mm and clean coarse sand in bed plate<br />

cap, approach slabs etc. including the cost <strong>of</strong> all<br />

labour and materials, screening shuttering, mixing<br />

the complete in mixing placing in position,<br />

vibrating striking curing taxes and royalty all<br />

complete as per approved design and drawing<br />

and relevant clause <strong>of</strong> M.O.S.T. specification and<br />

direction <strong>of</strong> E/I.<br />

7. Providing PCC/RCC M-300 with nominal mix<br />

(1:1:2) in deck slab including the cost <strong>of</strong> all labour<br />

and materials, screening shuttering, mixing the<br />

complete in mixing placing in position, vibrating<br />

striking curing taxes and royalty all complete as<br />

per approved design and drawing and relevant<br />

clause <strong>of</strong> MOST specification <strong>of</strong> E/I excluding cost<br />

<strong>of</strong> reinforcement and its bending placing in<br />

Cum 7.14<br />

position. Cum 16.63<br />

8. Providing PCC/RCC M-300 with nominal mix<br />

(1:1:2) in wearing coat <strong>of</strong> deck slab with stone<br />

chips 20 mm to 6 mm size (2 part 20 mm to 10<br />

mm and one part 10 mm to 6 mm) and clean<br />

coarse sand <strong>of</strong> F.M. 2.0 to 3.5 including mixing in<br />

concrete mixture and vibrating but excluding cost<br />

<strong>of</strong> reinforcement bending & binding excluding all<br />

cost <strong>of</strong> material and labour all complete as per<br />

specification <strong>of</strong> M.O.S.T.and direction <strong>of</strong> E/I. Cum 3.267<br />

9. Supplying, fitting and placing HYSD bar<br />

reinforcement in sub-structure complete as per<br />

drawing and technical specification<br />

M.T. 3.959<br />

10. Providing filter media with stone metal grade-III<br />

conforming to MORT&H Table 400-7, free from<br />

grass, dirt and debris and other loose and<br />

deleterious materials likely to deteriorate,<br />

providing light, barrier, danger signals, choukidar,<br />

makind and maintaining diversion, traffic<br />

regulation incidental charges, all taxes and royalty<br />

etc. all technical specification and MORT&H<br />

specification clause 305 and other relevant<br />

29<br />

Cum 39.30<br />

(Rupees Four<br />

Thousand Three<br />

Hundred Eleven &<br />

paise Twenty Three)<br />

only<br />

4311.23<br />

(Rupees Four<br />

Thousand Eight<br />

Hundred Ten & paise<br />

Four) only<br />

4810.04<br />

(Rupees Six<br />

Thousand Two<br />

Hundred Fourteen &<br />

paise Seventy Two)<br />

only<br />

6214.72<br />

(Rupees Four<br />

Thousand Nine<br />

Hundred One &<br />

paise Ninety Two)<br />

only<br />

4901.92<br />

(Rupees Fifty Seven<br />

Thousand Nine<br />

Hundred Twelve &<br />

paise Ninety Six)<br />

only<br />

57912.96<br />

(Rupees Seven<br />

Hundred Eighty One<br />

& paise Seventy<br />

Five) only<br />

781.75


clauses and direction <strong>of</strong> E/I.<br />

11. Providing weep holes in Brick<br />

masonry/Plan/Reinforced concrete abutment,<br />

wing wall/return wall with 100 mm dia AC pipe<br />

extending through the full width <strong>of</strong> the structure<br />

with slope <strong>of</strong> 1V:20H towards drawing foce.<br />

Complete as per drawing and Technical<br />

specifications Nos. 40.00<br />

12. Providing fitting and fixing tar paper <strong>of</strong> approved<br />

quality in two layers <strong>of</strong> bed plate/cap <strong>of</strong> abutment<br />

and piers as per standard specification and<br />

direction <strong>of</strong> E/I. Sqm 13.20<br />

13. making with raised 25 mm cement plaster (1:4)<br />

numbering culverts and bridges and for working<br />

load clarification at end <strong>of</strong> parapets including cost<br />

numbering and painting as per M.O.S.T.<br />

specification and direction <strong>of</strong> E/I. including cost <strong>of</strong><br />

all labour materials, royalty and taxes etc. all<br />

complete job. Nos. 4.00<br />

14. Painting posts with two loats <strong>of</strong> en<strong>ame</strong>l paints <strong>of</strong><br />

approved shade and make after cleaning the<br />

surface thoroughly all complete job.<br />

15. Earth <strong>Work</strong> in back filling in foundation trenches<br />

and plinth in layer not exceeding 150 m thick well<br />

watered rammed fully compacted and line<br />

dressed with earth obtained from excavation <strong>of</strong><br />

foundation trenches with a lead <strong>of</strong> 50 m and lift <strong>of</strong><br />

1.5 m complete as per building specification and<br />

30<br />

Sqm 13.78<br />

direction <strong>of</strong> E/I. Cum 29.72<br />

16. Granular Sub-Base with Coarse Graded Material<br />

(Table : 400-2) ( construction <strong>of</strong> granular subbase<br />

by providing coarse graded material,<br />

spreading in uniform layers with motor grader on<br />

prepared surface, mixing by mix in place method<br />

with rotavator at OMC, and compacting with<br />

vibratory roller to achieve the desired density,<br />

complete as per clause 401) Cum 34.20<br />

17. Providing, laying, spreading and compacting<br />

stone metal Go- II with crushable type screening<br />

material such as moored base course on well<br />

prepared surface and compacting with roller to<br />

achieve the desired density as per MOST<br />

specification 406 (4th revision) and direction <strong>of</strong><br />

E/I. Cum 16.20<br />

18. Providing, laying, spreading and compacting<br />

stone metal Go- III with crushable type screening<br />

material such as moorum base course on well<br />

prepared surface and compacting with roller to<br />

achieve the desired density as per MOST<br />

specification 406 (4th revision) and direction <strong>of</strong><br />

E/I.<br />

19. Providing 50 mm thick compacted built-up-spray<br />

Cum 8.10<br />

(Rupees One<br />

Hundred Four) only<br />

104.00<br />

(Rupees One<br />

Hundred Twenty<br />

Two) only<br />

122.00<br />

(Rupees One<br />

Hundred Thirty &<br />

paise Eighty Five)<br />

only<br />

130.85<br />

(Rupees Forty Nine<br />

& paise Thirty Five)<br />

only<br />

49.35<br />

(Rupees Twenty One<br />

& paise Sixty) only<br />

21.60<br />

(Rupees Three<br />

Hundred Sixty Five<br />

& paise Sixty Seven)<br />

only<br />

365.67<br />

(Rupees One<br />

Thousand One<br />

Hundred Eighteen &<br />

paisa Sixteen) only<br />

1118.16<br />

(Rupees One<br />

Thousand One<br />

Hundred Seventy<br />

Eight & paise Ninety<br />

One) only<br />

1178.91


Grout over WBM surface including cleaning the<br />

surface heating bitumen to required temp.<br />

applying tack coat @ 10 kg/10 cum and also<br />

including cost <strong>of</strong> bitumen and stone aggregates<br />

conforming to physical properties & grading given<br />

in the MOST table 500-7(3rd revision) speeding<br />

stone metal @ 0.66 cum per 10 sqm in layer,<br />

hand packing rolling compacting and then<br />

applying spray <strong>of</strong> bitumen@ 15kg/10sqm finishing<br />

with key aggregates 0.13 cum/10sqm in proper<br />

grade camber <strong>of</strong> super elevation and rolling the<br />

s<strong>ame</strong> with powder road roller and finishing the<br />

surface with temple including the cost <strong>of</strong> barriers,<br />

danger signal, choukidar making and maintaining<br />

diversion, cost <strong>of</strong> carriage <strong>of</strong> full bitumen drum<br />

from departmental godown in good condition<br />

including cost <strong>of</strong> all labour, cost <strong>of</strong> P.O.L. and<br />

other lubricants and also hire charges <strong>of</strong> road<br />

roller without depreciation and major repair all<br />

complete job as per specification and direction <strong>of</strong><br />

E/I and material carriage <strong>of</strong> all lead.<br />

31<br />

Sqm<br />

108.00<br />

20. Providing 20 mm thick open graded premixed<br />

carpet over bituminous surface in proper grade,<br />

camber and super elevation with stone chips <strong>of</strong><br />

13.2 mm and 11.2 mm size in ratio 2:1 @ 0.27<br />

cum and bitumen @ 19.6 kg including tack-coat<br />

@ 5 kg all per 10 sqm surface including Cost <strong>of</strong><br />

heating the aggregate and bitumen to required<br />

temperature with cost <strong>of</strong> fuel cleaning the surface,<br />

properly with iron brush and broom rolling,<br />

providing light barrier, danger signals, choukidar,<br />

carriage <strong>of</strong> bitumen drum up to 8 km lead from<br />

godown to work site and returning the s<strong>ame</strong> in<br />

good conditions to the godown and hire charge <strong>of</strong><br />

road roller all complete as per specification and<br />

direction <strong>of</strong> E/I. Sqm 108.00<br />

(Rupees Two<br />

Hundred Four &<br />

paise One) only<br />

204.01<br />

(Rupees One<br />

Hundred Forty Nine<br />

& paise Seventy<br />

One) only<br />

149.71<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GEERAL AD SPECIAL CODITIO FOR THE COTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the road bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

32


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

33


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

34


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds ds vuql vuqlkj vuql vuqlkj<br />

kj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />

tk,xhA<br />

¼x½ fufonk vkea=.k lwpuk es izdkf'kr izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />

A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

35


fufonk fufonk dh dh ’krsZ<br />

’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

36


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

38<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 04<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />

1.50 X 1.00 m in 13 th (13/2) km <strong>of</strong><br />

Koderma-Jamua Road for the year 2011-12<br />

Estimated cost : Rs. 5,98,924/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 1,250/-<br />

Earnest Money : Rs. 12,000/-<br />

Time <strong>of</strong> Completion : Three Months<br />

OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />

ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />

DIVISION<br />

DIVISION<br />

KODERMA.<br />

KODERMA.<br />

KODERMA.<br />

39


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

1250/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in 13 th<br />

(13/2) km <strong>of</strong> Koderma-Jamua Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in<br />

the presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in<br />

their <strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 5,98,924/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 12,000/- for the work.<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned on from 12-10-2011 to 13-10-2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

40


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

41<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in<br />

Sl.<br />

o.<br />

13 th km <strong>of</strong> Koderma-Jamua Road for the year 2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Dismantalling <strong>of</strong> existing structures<br />

like culverts, bridges, retaining<br />

walls and other structure<br />

comprising <strong>of</strong> masonry, cement<br />

concrete, wood work, steel work,<br />

including T&P and scaffolding<br />

wherever necessary, shorting the<br />

dismantled material, disposal <strong>of</strong><br />

unserviceable material and stacking<br />

the serviceable material with all<br />

lifts and lead <strong>of</strong> 1000 metres<br />

(a) Brick <strong>Work</strong><br />

(b) R.C.C. slab<br />

2. E/W in excavation <strong>of</strong> foundn.<br />

Trenches for bridges with all<br />

materials, labour, tools, and plants,<br />

levelling and ramming the<br />

foundation beds, dressing the sides,<br />

removing roots, logs, shrubs and<br />

other loose and deleterious<br />

materials likely to deteriorate,<br />

adequate provision against erosion,<br />

water pollution and drainage to<br />

keep the site free <strong>of</strong> water, stacking<br />

the excavated soil clear from the<br />

edge <strong>of</strong> excavation, providing light,<br />

barrier, danger signals, choukidar,<br />

making and maintaining diversion,<br />

traffic regulation all complete job<br />

as per design/drawing and technical<br />

specification and MORT&H<br />

specification clause 304 and other<br />

relevant clauses and direction <strong>of</strong> E/I<br />

(Excluding cost <strong>of</strong> dewatering and<br />

shoring)<br />

Cum<br />

Cum<br />

(i) Ordinary Soil Cum<br />

42<br />

27.90<br />

6.187<br />

102.752<br />

3. Providing P.C.C./R.C.C. M-150<br />

with nominal mix (1:2:4) with<br />

approved quality <strong>of</strong> stone chips 20 Cum 31.00<br />

(Rupees One Hundred Fifty<br />

Five & paise Twenty Five)<br />

only<br />

Rs. 155.25<br />

(Rupees Five Hundred Fifty<br />

Eight& paise Fifty Five) only<br />

Rs. 558.55<br />

(Rupees Forty One & paise<br />

Fifteen) only<br />

Rs. 41.15<br />

(Rupees Four Thousand One<br />

Hundred Ninety & paise Sixty Two)<br />

only<br />

Rs. 4190.62


mm to 6 mm size and clean coarse<br />

sand <strong>of</strong> 2.5 to 3.5 F.M. in<br />

foundation and plinth including<br />

mixing cement concrete in mixer,<br />

Screening royalty and all taxes with<br />

hire charges <strong>of</strong> machinery all<br />

complete with cost all labour and<br />

materials as per MOST<br />

specification and direction <strong>of</strong> E/I.<br />

4. Providing random rubble stone<br />

masonry in C.M. (1:3) in<br />

foundation and plinth with hammer<br />

dressed stone <strong>of</strong> less than 0.03 cum<br />

in volume and clean coarse sand <strong>of</strong><br />

F.M. 2 to 2.5 including cost <strong>of</strong><br />

screening-raking out joints to 20<br />

mm depth curing taxes and royalty<br />

all complete as per building<br />

specification and direction <strong>of</strong> E/I. Cum 50.928<br />

5. Providing random rubble stone<br />

masonry in C.M. (1:3) in super<br />

Structure with hammer dressed<br />

stone <strong>of</strong> less than 0.03 cum in<br />

volume and clean coarse sand <strong>of</strong><br />

F.M. 2 to 2.5 including cost <strong>of</strong><br />

screening-raking out joints to 20<br />

mm depth curing taxes and royalty<br />

all complete as per building<br />

specification and direction <strong>of</strong> E/I. Cum 58.49<br />

6. Providing PCC/RCC M-200 with<br />

nominal mix (1:1.5:3) with<br />

approved quality <strong>of</strong> stone chips 20<br />

mm to 6 mm and clean coarse sand<br />

in bed plate cap, approach slabs etc.<br />

--do--do-- Cum 6.60<br />

7. Providing PCC/RCC M-300 with<br />

nominal mix (1:1:2) in deck slab<br />

do- as- do as per MOST<br />

specification <strong>of</strong> E/I excluding cost<br />

<strong>of</strong> reinforcement and its bending<br />

placing in position. Cum 6.93<br />

8. Providing PCC/RCC M-300 with<br />

nominal mix (1:1:2) in wearing coat<br />

<strong>of</strong> deck slab with stone chips 20<br />

mm to 6 mm size (2 part 20 mm to Cum 1.89<br />

43<br />

(Rupees Two Thousand Two<br />

Hundred Sixty & paise Sixty<br />

Seven) only<br />

Rs. 2260.67<br />

(Rupees Two Thousand Three<br />

Hundred Twenty Eight & paise<br />

Fifty Seven) only<br />

Rs. 2328.57<br />

(Rupees Four Thousand Eight<br />

Hundred Sixty Nine & paise<br />

Eighty Seven) only<br />

Rs. 4869.87<br />

(Rupees Six Thousand Two<br />

Hundred Eighty One & paise<br />

Five) only<br />

Rs. 6281.05<br />

(Rupees Four Thousand Nine<br />

Hundred Sixty Eight & paise<br />

Twenty Five) only<br />

Rs. 4968.25


10 mm and one part 10 mm to 6<br />

mm) and clean coarse sand <strong>of</strong> F.M.<br />

2.0 to 3.5 including mixing in<br />

concrete mixture and vibrating but<br />

excluding cost <strong>of</strong> reinforcement<br />

bending & binding excluding all<br />

cost <strong>of</strong> material and labour all<br />

complete as per specification <strong>of</strong><br />

M.O.S.T.and direction <strong>of</strong> E/I.<br />

9. Supplying, fitting and placing<br />

HYSD bar reinforcement in substructure<br />

complete as per drawing<br />

and technical specification M.T. 1.375<br />

10. Providing filter media with stone<br />

metal grade-III conforming to<br />

MORT&H Table 400-7, free from<br />

grass, dirt and debris and other<br />

loose and deleterious materials<br />

likely to deteriorate, providing<br />

light, barrier, danger signals,<br />

choukidar, making and maintaining<br />

diversion, traffic regulation<br />

incidental charges, all taxes and<br />

royalty etc. all technical<br />

specification and MORT&H<br />

specification clause 305 and other<br />

relevant clauses and direction <strong>of</strong><br />

E/I. Cum 11.16<br />

11. Providing weep holes in Brick<br />

masonry/Plan/Reinforced concrete<br />

abutment, wing wall/return wall<br />

with 100 mm dia AC pipe<br />

extending through the full width <strong>of</strong><br />

the structure with slope <strong>of</strong> 1V:20H<br />

towards drawing foce. Complete as<br />

per drawing and Technical<br />

specifications. Nos. 30.00<br />

12. Providing fitting and fixing tar<br />

paper <strong>of</strong> approved quality in two<br />

layers <strong>of</strong> bed plate/cap <strong>of</strong> abutment<br />

and piers as per standard<br />

specification and direction <strong>of</strong> E/I. Sqm 13.20<br />

13. making with raised 25 mm cement<br />

plaster (1:4) numbering culverts<br />

and bridges and for working load Nos. 4.00<br />

44<br />

(Rupees Fifty Seven Thousand<br />

Nine Hundred Twenty One &<br />

paise Ninety Four) only<br />

Rs. 57921.94<br />

(Rupees Eight Hundred<br />

Seventy Three & paise Seven)<br />

only<br />

Rs. 873.07<br />

(Rupees One Hundred Four)<br />

only<br />

Rs. 104.00<br />

(Rupees One Hundred Twenty<br />

Two) only<br />

Rs. 122.00<br />

(Rupees One Hundred Thirty &<br />

paise Eighty five) only<br />

Rs. 130.85


clarification at end <strong>of</strong> parapets<br />

including cost numbering and<br />

painting as per M.O.S.T.<br />

specification and direction <strong>of</strong> E/I.<br />

including cost <strong>of</strong> all labour<br />

materials, royalty and taxes etc. all<br />

complete job.<br />

14. Painting posts with two loats <strong>of</strong><br />

en<strong>ame</strong>l paints <strong>of</strong> approved shade<br />

and make after cleaning the surface<br />

thoroughly all complete job. Sqm 8.46<br />

15. Earth <strong>Work</strong> in back filling in<br />

foundation trenches and plinth in<br />

layer not exceeding 150 m thick<br />

well watered rammed fully<br />

compacted and line dressed with<br />

earth obtained from excavation <strong>of</strong><br />

foundation trenches with a lead <strong>of</strong><br />

50 m and lift <strong>of</strong> 1.5 m complete as<br />

per building specification and<br />

direction <strong>of</strong> E/I. Cum 17.12<br />

16. Providing P.C.C./R.C.C. M-10 with<br />

nominal mix (1:3:6) in foundation<br />

<strong>of</strong> various component <strong>of</strong> culvert<br />

and bridge with approved quality <strong>of</strong><br />

stone metal grade- iv (20mm to 37<br />

mm size) and clean coarse sand <strong>of</strong><br />

F.M. 2.5 to 3 including screening<br />

mixing cement concrete in mixer,<br />

and placing and in position<br />

vibrating screening curing taxes<br />

and royalty including the cost <strong>of</strong> all<br />

materials and labour complete job<br />

as per approved design/drawing and<br />

relevant clause M.O.S.T.<br />

specification and direction <strong>of</strong> E/I.<br />

including cost <strong>of</strong> machine but<br />

excluding the cost <strong>of</strong> shuttering. Cum 7.77<br />

45<br />

(Rupees Forty Nine & paise<br />

Thirty Five) only<br />

Rs. 49.35<br />

(Rupees Twenty One & paise<br />

Sixty) only<br />

Rs. 21.60<br />

(Rupees Three Thousand Two<br />

hundred Forty One & paise<br />

Seventeen) only<br />

Rs. 3241.17<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the Road Bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

46


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

47


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

48


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />

tk,xhA<br />

¼x½ ¼x½ fufonk fufonk vke vkea=.k vke a=.k lwpuk lwpuk es es izdkf'kr izdkf'kr izdkf'kr lHkh lHkh ca/kusa ca/kusa ca/kusa ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk vfHk;Urk j[kkuk j[kkuk j[kkuk vko'; vko';d vko'; d d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />

A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

49


fufonk fufonk dh dh ’krsZ<br />

’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

50


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

52<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 05<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />

3.00 X 2.50 in 25 th (25/1) km <strong>of</strong> Koderma-<br />

Jamua Road for the year 2011-12<br />

Estimated cost : Rs. 16,19,527/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />

Earnest Money : Rs. 32,400/-<br />

Time <strong>of</strong> Completion : Three Months<br />

OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />

ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />

DIVISION<br />

DIVISION<br />

KODERMA.<br />

KODERMA.<br />

KODERMA.<br />

53


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

5,000/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in 25 th (25/1)<br />

km <strong>of</strong> Koderma-Jamua Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the<br />

presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their<br />

<strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 16,19,527/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 32,400/- for the work.<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned on from 12-10-2011 to 13-10-2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

54


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

55<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in<br />

Sl.<br />

o.<br />

25 th km <strong>of</strong> Koderma-Jamua Road for the year 2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Dismantling <strong>of</strong> existing structures like<br />

culverts, bridges, retaining walls and<br />

other structure comprising <strong>of</strong> masonry,<br />

cement concrete, wood work, steel work,<br />

including T&P and scaffolding wherever<br />

necessary, shorting the dismantled<br />

material, disposal <strong>of</strong> unserviceable<br />

material and stacking the serviceable<br />

material with all lifts and lead <strong>of</strong> 1000<br />

metres<br />

(a) R.C.C. slab<br />

2. E/W in excavation <strong>of</strong> foundn. Trenches<br />

for bridges with all materials, labour,<br />

tools, and plants, levelling and ramming<br />

the foundation beds, dressing the sides,<br />

removing roots, logs, shrubs and other<br />

loose and deleterious materials likely to<br />

deteriorate, adequate provision against<br />

erosion, water pollution and drainage to<br />

keep the site free <strong>of</strong> water, stacking the<br />

excavated soil clear from the edge <strong>of</strong><br />

excavation, providing light, barrier,<br />

danger signals, choukidar, making and<br />

maintaining diversion, traffic regulation<br />

all complete job as per design/drawing<br />

and technical specification and MORT&H<br />

specification clause 304 and other<br />

relevant clauses and direction <strong>of</strong> E/I<br />

(Excluding cost <strong>of</strong> dewatering and<br />

shoring)<br />

56<br />

Cum<br />

(i) Ordinary Soil Cum<br />

16.60<br />

178.305<br />

3. Providing P.C.C./R.C.C. M-150 with<br />

nominal mix (1:2:4) with approved<br />

quality <strong>of</strong> stone chips 20 mm to 6 mm<br />

size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />

F.M. in foundation and plinth including<br />

mixing cement concrete in mixer,<br />

Screening royalty and all taxes with hire Cum 98.80<br />

(Rupees Five Hundred<br />

Fifty Seven) only<br />

Rs. 557.00<br />

(Rupees Forty One &<br />

paise Fifteen) only<br />

Rs. 41.15<br />

(Rupees Four Thousand<br />

One Hundred Eighty &<br />

paise Fifty Five) only<br />

Rs. 4180.55


charges <strong>of</strong> machinery all complete with<br />

cost all labour and materials as per MOST<br />

specification and direction <strong>of</strong> E/I.<br />

4. Providing P.C.C./R.C.C. M-10 with<br />

nominal mix (1:3:6) in foundation <strong>of</strong><br />

various component <strong>of</strong> culvert and bridge<br />

with approved quality <strong>of</strong> stone metal<br />

grade- iv (20mm to 37 mm size) and clean<br />

coarse sand <strong>of</strong> F.M. 2.5 to 3 including<br />

screening mixing cement concrete in<br />

mixer, and placing and in position<br />

vibrating screening curing taxes and<br />

royalty including the cost <strong>of</strong> all materials<br />

and labour complete job as per approved<br />

design/drawing and relevant clause<br />

M.O.S.T. specification and direction <strong>of</strong><br />

E/I. including cost <strong>of</strong> machine but<br />

excluding the cost <strong>of</strong> shuttering. Cum 24.795<br />

5. Providing P.C.C./R.C.C. M-150 with<br />

nominal mix (1:2:4) with approved<br />

quality <strong>of</strong> stone chips 20 mm to 6 mm<br />

size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />

F.M. in foundation and plinth including<br />

mixing cement concrete in mixer,<br />

Screening royalty and all taxes with hire<br />

charges <strong>of</strong> machinery all complete with<br />

cost all labour and materials as per MOST<br />

specification and direction <strong>of</strong> E/I.<br />

(a) Abt + Wwall + Rwall + Parapet<br />

(b) Cut <strong>of</strong>f wall and Flooring<br />

Cum 20.992<br />

6. Providing PCC/RCC M-200 with nominal<br />

mix (1:1.5:3) with approved quality <strong>of</strong><br />

stone chips 20 mm to 6 mm and clean<br />

coarse sand in bed plate cap, approach<br />

slabs etc.<br />

(a) Bed Plate+Dirt Wall + Approach Slab Cum 30.68<br />

7. Providing PCC/RCC M-300 with nominal<br />

mix (1:1:2) in deck slab do- as- do as per<br />

MOST specification <strong>of</strong> E/I excluding cost<br />

<strong>of</strong> reinforcement and its bending placing<br />

in position. Cum 16.63<br />

8. Providing PCC/RCC M-300 with nominal<br />

mix (1:1:2) in wearing coat <strong>of</strong> deck slab<br />

Cum 3.267<br />

57<br />

Cum<br />

95.95<br />

(Rupees Three Thousand<br />

One Hundred Eighty One<br />

& paise Thirty One) only<br />

Rs. 3181.31<br />

(Rupees Four Thousand<br />

Three Hundred Sixty six<br />

& paise Sixty) only<br />

Rs. 4366.60<br />

(Rupees Four Thousand<br />

One Hundred Eighty &<br />

paise Fifty Five) only<br />

Rs. 4180.55<br />

(Rupees Four Thousand<br />

Eight Hundred Thirty<br />

Four & paise Ninety) only<br />

Rs. 4834.90<br />

(Rupees Six Thousand<br />

Two Hundred Thirty Nine<br />

& paise Seventeen) only<br />

Rs. 6239.17<br />

(Rupees Four Thousand<br />

Nine Hundred Twenty


with stone chips 20 mm to 6 mm size (2<br />

part 20 mm to 10 mm and one part 10 mm<br />

to 6 mm) and clean coarse sand <strong>of</strong> F.M.<br />

2.0 to 3.5 including mixing in concrete<br />

mixture and vibrating but excluding cost<br />

<strong>of</strong> reinforcement bending & binding<br />

excluding all cost <strong>of</strong> material and labour<br />

all complete as per specification <strong>of</strong><br />

M.O.S.T.and direction <strong>of</strong> E/I.<br />

9. Supplying, fitting and placing HYSD bar<br />

reinforcement in sub-structure complete<br />

as per drawing and technical specification<br />

10. Providing filter media with stone metal<br />

grade-III conforming to MORT&H Table<br />

400-7, free from grass, dirt and debris and<br />

other loose and deleterious materials<br />

likely to deteriorate, providing light,<br />

barrier, danger signals, choukidar, making<br />

M.T. 5.136<br />

and maintaining diversion, traffic<br />

regulation incidental charges, all taxes<br />

and royalty etc. all technical specification<br />

and MORT&H specification clause 305<br />

and other relevant clauses and direction <strong>of</strong><br />

E/I. Cum 39.30<br />

11. Providing weep holes in Brick<br />

masonry/Plan/Reinforced concrete<br />

abutment, wing wall/return wall with 100<br />

mm dia AC pipe extending through the<br />

full width <strong>of</strong> the structure with slope <strong>of</strong><br />

1V:20H towards drawing foce. Complete<br />

as per drawing and Technical<br />

specifications. Nos. 40.00<br />

12. Providing fitting and fixing tar paper <strong>of</strong><br />

approved quality in two layers <strong>of</strong> bed<br />

plate/cap <strong>of</strong> abutment and piers as per<br />

standard specification and direction <strong>of</strong><br />

E/I. Sqm 13.20<br />

13. making with raised 25 mm cement plaster<br />

(1:4) numbering culverts and bridges and<br />

for working load clarification at end <strong>of</strong><br />

parapets including cost numbering and<br />

painting as per M.O.S.T. specification and<br />

direction <strong>of</strong> E/I. including cost <strong>of</strong> all<br />

labour materials, royalty and taxes etc. all<br />

complete job. Nos. 4.00<br />

58<br />

Six & paise Thirty Seven)<br />

only<br />

Rs. 4926.37<br />

(Rupees Fifty Seven Thousand<br />

Nine Hundred Seventy Six &<br />

paise Thirty Five) only<br />

Rs. 57976.35<br />

(Rupees Seven Hundred<br />

Eighty one & paise<br />

Seventy Five) only<br />

Rs. 781.75<br />

(Rupees One Hundred<br />

Four) only<br />

Rs. 104.00<br />

(Rupees One Hundred<br />

Twenty Two) only<br />

Rs. 122.00<br />

(Rupees One Hundred<br />

Thirty & paise Eighty<br />

five) only<br />

Rs. 130.85


14. Painting posts with two loats <strong>of</strong> en<strong>ame</strong>l<br />

paints <strong>of</strong> approved shade and make after<br />

cleaning the surface thoroughly all<br />

complete job. Sqm 13.78<br />

15. Earth <strong>Work</strong> in back filling in foundation<br />

trenches and plinth in layer not exceeding<br />

150 m thick well watered rammed fully<br />

compacted and line dressed with earth<br />

obtained from excavation <strong>of</strong> foundation<br />

trenches with a lead <strong>of</strong> 50 m and lift <strong>of</strong><br />

1.5 m complete as per building<br />

specification and direction <strong>of</strong> E/I. Cum 29.72<br />

59<br />

(Rupees Forty Nine &<br />

paise Thirty Five) only<br />

Rs. 49.35<br />

(Rupees Twenty One &<br />

paise Sixty) only<br />

Rs. 21.60<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the Road Bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

60


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

61


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

62


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuekZ. fuekZ.k fuekZ. k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj njks njks es es es dVkSrh dVkSrh dj dj yh yh yh tk,xhA<br />

tk,xhA<br />

¼x½ fufonk vkea=.k lwpuk es izdkf'kr izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />

A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

63


fufonk fufonk dh dh ’krsZ<br />

’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

64


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

66<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 06<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />

3.00 X 2.50 in 24 th (24/1) km <strong>of</strong> Koderma-<br />

Jamua Road for the year 2011-12<br />

Estimated cost : Rs. 16,19,781/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />

Earnest Money : Rs. 32,400/-<br />

Time <strong>of</strong> Completion : Three Months<br />

OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />

ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />

DIVISION<br />

DIVISION<br />

KODERMA.<br />

KODERMA.<br />

KODERMA.<br />

67


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

5,000/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in 24 th (24/1)<br />

km <strong>of</strong> Koderma-Jamua Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the<br />

presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their<br />

<strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 16,19,781/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 32,400/- for the work.<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned on from 12-10-2011 to 13-10-2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

68


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

69<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in<br />

Sl.<br />

o.<br />

24 th (24/1) km <strong>of</strong> Koderma-Jamua Road for the year 11-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Dismantling <strong>of</strong> existing structures like<br />

culverts, bridges, retaining walls and<br />

other structure comprising <strong>of</strong> masonry,<br />

cement concrete, wood work, steel work,<br />

including T&P and scaffolding wherever<br />

necessary, shorting the dismantled<br />

material, disposal <strong>of</strong> unserviceable<br />

material and stacking the serviceable<br />

material with all lifts and lead <strong>of</strong> 1000<br />

metres<br />

(a) R.C.C. slab<br />

2. E/W in excavation <strong>of</strong> foundn. Trenches<br />

for bridges with all materials, labour,<br />

tools, and plants, levelling and ramming<br />

the foundation beds, dressing the sides,<br />

removing roots, logs, shrubs and other<br />

loose and deleterious materials likely to<br />

deteriorate, adequate provision against<br />

erosion, water pollution and drainage to<br />

keep the site free <strong>of</strong> water, stacking the<br />

excavated soil clear from the edge <strong>of</strong><br />

excavation, providing light, barrier,<br />

danger signals, choukidar, making and<br />

maintaining diversion, traffic regulation<br />

all complete job as per design/drawing<br />

and technical specification and MORT&H<br />

specification clause 304 and other<br />

relevant clauses and direction <strong>of</strong> E/I<br />

(Excluding cost <strong>of</strong> dewatering and<br />

shoring)<br />

70<br />

Cum<br />

(i) Ordinary Soil Cum<br />

16.60<br />

178.305<br />

3. Providing P.C.C./R.C.C. M-150 with<br />

nominal mix (1:2:4) with approved<br />

quality <strong>of</strong> stone chips 20 mm to 6 mm<br />

size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />

F.M. in foundation and plinth including<br />

mixing cement concrete in mixer,<br />

Screening royalty and all taxes with hire<br />

charges <strong>of</strong> machinery all complete with Cum 119.792<br />

(Rupees Five Hundred<br />

Fifty Seven) only<br />

Rs. 557.00<br />

(Rupees Forty One &<br />

paise Fifteen) only<br />

Rs. 41.15<br />

(Rupees Four Thousand<br />

One Hundred Eighty &<br />

paise Fifty Five) only<br />

Rs. 4180.55


cost all labour and materials as per MOST<br />

specification and direction <strong>of</strong> E/I.<br />

4. Providing P.C.C./R.C.C. M-10 with<br />

nominal mix (1:3:6) in foundation <strong>of</strong><br />

various component <strong>of</strong> culvert and bridge<br />

with approved quality <strong>of</strong> stone metal<br />

grade- iv (20mm to 37 mm size) and clean<br />

coarse sand <strong>of</strong> F.M. 2.5 to 3 including<br />

screening mixing cement concrete in<br />

mixer, and placing and in position<br />

vibrating screening curing taxes and<br />

royalty including the cost <strong>of</strong> all materials<br />

and labour complete job as per approved<br />

design/drawing and relevant clause<br />

M.O.S.T. specification and direction <strong>of</strong><br />

E/I. including cost <strong>of</strong> machine but<br />

excluding the cost <strong>of</strong> shuttering. Cum 24.795<br />

5. Providing P.C.C./R.C.C. M-150 with<br />

nominal mix (1:2:4) with approved<br />

quality <strong>of</strong> stone chips 20 mm to 6 mm<br />

size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />

F.M. in Sub Structure including mixing<br />

cement concrete in mixer, Screening<br />

royalty and all taxes with hire charges <strong>of</strong><br />

machinery all complete with cost all<br />

labour and materials as per MOST<br />

specification and direction <strong>of</strong> E/I.<br />

6. Providing PCC/RCC M-200 with nominal<br />

mix (1:1.5:3) with approved quality <strong>of</strong><br />

stone chips 20 mm to 6 mm and clean<br />

coarse sand in bed plate cap, approach<br />

slabs etc.<br />

(a) Bed Plate+Dirt Wall + Approach<br />

71<br />

Cum<br />

95.95<br />

Slab Cum 30.68<br />

7. Providing PCC/RCC M-300 with nominal<br />

mix (1:1:2) in deck slab do- as- do as per<br />

MOST specification <strong>of</strong> E/I excluding cost<br />

<strong>of</strong> reinforcement and its bending placing<br />

in position. Cum 16.63<br />

8. Providing PCC/RCC M-300 with nominal<br />

mix (1:1:2) in wearing coat <strong>of</strong> deck slab<br />

with stone chips 20 mm to 6 mm size (2<br />

part 20 mm to 10 mm and one part 10 mm<br />

to 6 mm) and clean coarse sand <strong>of</strong> F.M.<br />

2.0 to 3.5 including mixing in concrete Cum 3.267<br />

(Rupees Three Thousand<br />

One Hundred Eighty One<br />

& paise Thirty One) only<br />

Rs. 3181.31<br />

(Rupees Four Thousand<br />

Three Hundred Sixty Six<br />

& paise<br />

Sixty Nine) only<br />

Rs. 4366.69<br />

(Rupees Four Thousand<br />

Eight Hundred Thirty<br />

Four & paise Ninety) only<br />

Rs. 4834.90<br />

(Rupees Six Thousand<br />

Two Hundred Thirty Nine<br />

& paise Seventeen) only<br />

Rs. 6239.17<br />

(Rupees Four Thousand<br />

Nine Hundred<br />

Twenty Six & paise<br />

Thirty Seven) only<br />

Rs. 4926.37


9.<br />

mixture and vibrating but excluding cost<br />

<strong>of</strong> reinforcement bending & binding<br />

excluding all cost <strong>of</strong> material and labour<br />

all complete as per specification <strong>of</strong><br />

M.O.S.T.and direction <strong>of</strong> E/I.<br />

Supplying, fitting and placing HYSD bar<br />

reinforcement in sub-structure complete<br />

as per drawing and technical specification<br />

10. Providing filter media with stone metal<br />

grade-III conforming to MORT&H Table<br />

400-7, free from grass, dirt and debris and<br />

other loose and deleterious materials<br />

likely to deteriorate, providing light,<br />

barrier, danger signals, choukidar, making<br />

M.T. 5.136<br />

and maintaining diversion, traffic<br />

regulation incidental charges, all taxes<br />

and royalty etc. all technical specification<br />

and MORT&H specification clause 305<br />

and other relevant clauses and direction <strong>of</strong><br />

E/I. Cum 39.30<br />

11. Providing weep holes in Brick masonry/<br />

Plan/ Reinforced concrete abutment, wing<br />

wall/return wall with 100 mm dia AC<br />

pipe extending through the full width <strong>of</strong><br />

the structure with slope <strong>of</strong> 1V:20H<br />

towards drawing foce. Complete as per<br />

drawing and Technical specifications. Nos. 40.00<br />

12. Providing fitting and fixing tar paper <strong>of</strong><br />

approved quality in two layers <strong>of</strong> bed<br />

plate/cap <strong>of</strong> abutment and piers as per<br />

standard specification and direction <strong>of</strong><br />

E/I. Sqm 13.20<br />

13. making with raised 25 mm cement plaster<br />

(1:4) numbering culverts and bridges and<br />

for working load clarification at end <strong>of</strong><br />

parapets including cost numbering and<br />

painting as per M.O.S.T. specification and<br />

direction <strong>of</strong> E/I. including cost <strong>of</strong> all<br />

labour materials, royalty and taxes etc. all<br />

complete job. Nos. 4.00<br />

14. Painting posts with two loats <strong>of</strong> en<strong>ame</strong>l<br />

paints <strong>of</strong> approved shade and make after<br />

cleaning the surface thoroughly all<br />

complete job. Sqm 13.78<br />

72<br />

(Rupees Fifty Seven Thousand<br />

Nine Hundred Seventy Six &<br />

paise Thirty Five) only<br />

Rs. 57976.35<br />

(Rupees Seven Hundred<br />

Eighty One & paise<br />

Seventy Five) only<br />

Rs. 781.75<br />

(Rupees One Hundred<br />

Four) only<br />

Rs. 104.00<br />

(Rupees One Hundred<br />

Twenty Two) only<br />

Rs. 122.00<br />

(Rupees One Hundred<br />

Thirty & paise Eighty<br />

five) only<br />

Rs. 130.85<br />

(Rupees Forty Nine &<br />

paise Thirty Five) only<br />

Rs. 49.35


15. Earth <strong>Work</strong> in back filling in foundation<br />

trenches and plinth in layer not exceeding<br />

150 m thick well watered rammed fully<br />

compacted and line dressed with earth<br />

obtained from excavation <strong>of</strong> foundation<br />

trenches with a lead <strong>of</strong> 50 m and lift <strong>of</strong><br />

1.5 m complete as per building<br />

specification and direction <strong>of</strong> E/I. Cum 29.72<br />

73<br />

(Rupees Twenty One &<br />

paise Sixty) only<br />

Rs. 21.60<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GEERAL AD SPECIAL CODITIO FOR THE COTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the Road Bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

74


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

75


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

76


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />

tk,xhA<br />

¼x½ fufonk vkea=.k lwpuk es izdkf'kr izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk; vfHk;Urk vfHk; Urk Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk AA<br />

A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

77


fufonk fufonk dh dh ’krsZ<br />

’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

78


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

80<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GOVERNMENT OF JHARKHAND<br />

ROAD CONSTRUCTION DEPARTMENT<br />

Bill <strong>of</strong> Quantity<br />

Group - 07<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />

1.50 X 1.00 m in 3 rd km <strong>of</strong> Rajauli-<br />

Chandwara-Barhi Road for the year 11-12<br />

Estimated cost : Rs. 5,98,924/-<br />

Cost <strong>of</strong> B.O.Q. : Rs. 1,250/-<br />

Earnest Money : Rs. 12,000/-<br />

Time <strong>of</strong> Completion : Three Months<br />

OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />

ENGINEER<br />

ENGINEER<br />

R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />

DIVISION<br />

DIVISION<br />

KODERMA.<br />

KODERMA.<br />

KODERMA.<br />

81


OFFICE OF THE EXECUTIVE EGIEER<br />

ROAD COSTRUCTIO DEPARTMET<br />

ROAD DIVISIO, KODERMA<br />

OTICE IVITIG TEDERS<br />

1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />

Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />

1250/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />

No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />

Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in 3 rd km<br />

<strong>of</strong> Rajauli-Chandwara-Barhi Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in<br />

the presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in<br />

their <strong>of</strong>fice.<br />

2. Estimated amount <strong>of</strong> the work is Rs . 5,98,924/-<br />

3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />

commence the work.<br />

4. Tenders are required to deposit earnest money amounting to Rs 12,000/- for the work.<br />

Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />

to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />

<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />

tender invalid and such the tender will be rejected.<br />

5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />

<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />

document relating to tender paper on payment <strong>of</strong><br />

(i) Rs 50/- for the work up to Rs 10,000/-<br />

(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />

(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />

(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />

(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />

(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />

(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />

(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />

Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />

<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />

/ Undersigned on from 12-10-2011 to 13-10-2011<br />

6. Any other information in connection with can be obtained on application be the undersigned.<br />

7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />

reason there<strong>of</strong>.<br />

8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />

or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />

tender.<br />

9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />

forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />

contract or deposit the security money within the aforesaid time.<br />

82


10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />

figure and words.<br />

11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />

quoting the rates on OVER BILL.<br />

12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />

for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />

during execution for the work in approved tenders.<br />

13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />

<strong>of</strong> tenders.<br />

14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />

tenders without assigning any reason there<strong>of</strong>.<br />

15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />

Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />

from approved B.O.Q.<br />

(b) Empty cement bag @ Rs. 3/ bag.<br />

16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />

17. Vague and amigos tenders are liable for rejection.<br />

18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />

from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />

electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />

for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />

19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />

20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />

mentioned in the tender documents and agreements.<br />

21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />

A – B x 15 = 15% limit to 15%<br />

A<br />

Where, A = Estimate cost Rs.<br />

B = Cost <strong>of</strong> Govt. Materials Rs.<br />

22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />

isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />

dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />

jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />

yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />

rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />

fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />

83<br />

Executive Engineer<br />

R.C.D., Road Division, Kodarma.


BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in<br />

3 rd km <strong>of</strong> Rajauli-Chandwara-Barhi Road for the year<br />

Sl.<br />

o.<br />

2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Dismantling <strong>of</strong> existing structures like<br />

culverts, bridges, retaining walls and<br />

other structure comprising <strong>of</strong><br />

masonry, cement concrete, wood<br />

work, steel work, including T&P and<br />

scaffolding wherever necessary,<br />

shorting the dismantled material,<br />

disposal <strong>of</strong> unserviceable material and<br />

stacking the serviceable material with<br />

all lifts and lead <strong>of</strong> 1000 metres<br />

(a) Brick <strong>Work</strong><br />

(b) R.C.C. slab<br />

84<br />

Cum<br />

Cum<br />

2. E/W in excavation <strong>of</strong> foundn.<br />

Trenches for bridges with all<br />

materials, labour, tools, and plants,<br />

leveling and ramming the foundation<br />

beds, dressing the sides, removing<br />

roots, logs, shrubs and other loose and<br />

deleterious materials likely to<br />

deteriorate, adequate provision against<br />

erosion, water pollution and drainage<br />

to keep the site free <strong>of</strong> water, stacking<br />

the excavated soil clear from the edge<br />

<strong>of</strong> excavation, providing light, barrier,<br />

danger signals, choukidar, making and<br />

maintaining diversion, traffic<br />

regulation all complete job as per<br />

design/drawing and technical<br />

specification and MORT&H<br />

specification clause 304 and other<br />

relevant clauses and direction <strong>of</strong> E/I<br />

(Excluding cost <strong>of</strong> dewatering and<br />

shoring)<br />

(i) Ordinary Soil Cum<br />

27.90<br />

6.187<br />

102.752<br />

(Rupees One Hundred<br />

Fifty Five & paise Twenty<br />

Five) only<br />

Rs. 155.25<br />

(Rupees Five Hundred<br />

Fifty Eight& paise Fifty<br />

Five) only<br />

Rs. 558.55<br />

(Rupees Forty One &<br />

paise Fifteen) only<br />

Rs. 41.15


3. Providing P.C.C./R.C.C. M-150 with<br />

nominal mix (1:2:4) with approved<br />

quality <strong>of</strong> stone chips 20 mm to 6 mm<br />

size and clean coarse sand <strong>of</strong> 2.5 to<br />

3.5 F.M. in foundation and plinth<br />

including mixing cement concrete in<br />

mixer, Screening royalty and all taxes<br />

with hire charges <strong>of</strong> machinery all<br />

complete with cost all labour and<br />

materials as per MOST specification<br />

and direction <strong>of</strong> E/I. Cum 31.00<br />

4. Providing random rubble stone<br />

masonry in C.M. (1:3) in foundation<br />

and plinth with hammer dressed stone<br />

<strong>of</strong> less than 0.03 cum in volume and<br />

clean coarse sand <strong>of</strong> F.M. 2 to 2.5<br />

including cost <strong>of</strong> screening-raking out<br />

joints to 20 mm depth curing taxes<br />

and royalty all complete as per<br />

building specification and direction <strong>of</strong><br />

E/I. Cum 50.928<br />

5. Providing random rubble stone<br />

masonry in C.M. (1:3) in super<br />

Structure with hammer dressed stone<br />

<strong>of</strong> less than 0.03 cum in volume and<br />

clean coarse sand <strong>of</strong> F.M. 2 to 2.5<br />

including cost <strong>of</strong> screening-raking out<br />

joints to 20 mm depth curing taxes<br />

and royalty all complete as per<br />

building specification and direction <strong>of</strong><br />

E/I. Cum 58.49<br />

6. Providing PCC/RCC M-200 with<br />

nominal mix (1:1.5:3) with approved<br />

quality <strong>of</strong> stone chips 20 mm to 6 mm<br />

and clean coarse sand in bed plate cap,<br />

approach slabs etc. Cum 6.60<br />

7. Providing PCC/RCC M-300 with<br />

nominal mix (1:1:2) in deck slab do-<br />

as- do as per MOST specification <strong>of</strong><br />

E/I excluding cost <strong>of</strong> reinforcement<br />

and its bending placing in position. Cum 6.93<br />

8. Providing PCC/RCC M-300 with<br />

nominal mix (1:1:2) in wearing coat<br />

<strong>of</strong> deck slab with stone chips 20 mm<br />

to 6 mm size (2 part 20 mm to 10 mm<br />

85<br />

(Rupees Four Thousand<br />

One Hundred Ninety &<br />

paise Sixty Two) only<br />

Rs. 4190.62<br />

(Rupees Two Thousand<br />

Two Hundred Sixty &<br />

paise Sixty Seven) only<br />

Rs. 2260.67<br />

(Rupees Two Thousand<br />

Three Hundred Twenty<br />

Eight & paise Fifty<br />

Seven) only<br />

Rs. 2328.57<br />

(Rupees Four Thousand<br />

Eight Hundred Sixty Nine<br />

& paise Eighty Seven)<br />

only<br />

Rs. 4869.87<br />

(Rupees Six Thousand<br />

Two Hundred Eighty One<br />

& paise Five) only<br />

Rs. 6281.05


and one part 10 mm to 6 mm) and<br />

clean coarse sand <strong>of</strong> F.M. 2.0 to 3.5<br />

including mixing in concrete mixture<br />

and vibrating but excluding cost <strong>of</strong><br />

reinforcement bending & binding<br />

excluding all cost <strong>of</strong> material and<br />

labour all complete as per<br />

specification <strong>of</strong> M.O.S.T.and direction<br />

<strong>of</strong> E/I.<br />

9. Supplying, fitting and placing HYSD<br />

bar reinforcement in sub-structure<br />

complete as per drawing and technical<br />

specification<br />

10. Providing filter media with stone<br />

metal grade-III conforming to<br />

MORT&H Table 400-7, free from<br />

grass, dirt and debris and other loose<br />

and deleterious materials likely to<br />

deteriorate, providing light, barrier,<br />

danger signals, choukidar, making and<br />

maintaining diversion, traffic<br />

regulation incidental charges, all taxes<br />

and royalty etc. all technical<br />

specification and MORT&H<br />

specification clause 305 and other<br />

86<br />

Cum<br />

1.89<br />

M.T. 1.375<br />

relevant clauses and direction <strong>of</strong> E/I. Cum 11.16<br />

11. Providing weep holes in Brick<br />

masonry/Plan/Reinforced concrete<br />

abutment, wing wall/return wall with<br />

100 mm dia AC pipe extending<br />

through the full width <strong>of</strong> the structure<br />

with slope <strong>of</strong> 1V:20H towards<br />

drawing foce. Complete as per<br />

drawing and Technical specifications. Nos. 30.00<br />

12. Providing fitting and fixing tar paper<br />

<strong>of</strong> approved quality in two layers <strong>of</strong><br />

bed plate/cap <strong>of</strong> abutment and piers as<br />

per standard specification and<br />

direction <strong>of</strong> E/I. Sqm 13.20<br />

13. making with raised 25 mm cement<br />

plaster (1:4) numbering culverts and<br />

bridges and for working load<br />

clarification at end <strong>of</strong> parapets Nos. 4.00<br />

(Rupees Four Thousand<br />

Nine Hundred Sixty Eight<br />

& paise Twenty Five)<br />

only<br />

Rs. 4968.25<br />

(Rupees Fifty Seven<br />

Thousand Nine Hundred<br />

Twenty One & paise<br />

Ninety Four) only<br />

Rs. 57921.94<br />

(Rupees Eight Hundred<br />

Seventy Three & paise<br />

Seven) only<br />

Rs. 873.07<br />

(Rupees One Hundred<br />

Four) only<br />

Rs. 104.00<br />

(Rupees One Hundred<br />

Twenty Two) only<br />

Rs. 122.00<br />

(Rupees One Hundred<br />

Thirty & paise Eighty<br />

five) only<br />

Rs. 130.85


including cost numbering and painting<br />

as per M.O.S.T. specification and<br />

direction <strong>of</strong> E/I. including cost <strong>of</strong> all<br />

labour materials, royalty and taxes etc.<br />

all complete job.<br />

14. Painting posts with two loats <strong>of</strong><br />

en<strong>ame</strong>l paints <strong>of</strong> approved shade and<br />

make after cleaning the surface<br />

thoroughly all complete job. Sqm 8.46<br />

15. Earth <strong>Work</strong> in back filling in<br />

foundation trenches and plinth in layer<br />

not exceeding 150 m thick well<br />

watered rammed fully compacted and<br />

line dressed with earth obtained from<br />

excavation <strong>of</strong> foundation trenches<br />

with a lead <strong>of</strong> 50 m and lift <strong>of</strong> 1.5 m<br />

complete as per building specification<br />

and direction <strong>of</strong> E/I. Cum 17.12<br />

16. Providing P.C.C./R.C.C. M-10 with<br />

nominal mix (1:3:6) in foundation <strong>of</strong><br />

various component <strong>of</strong> culvert and<br />

bridge with approved quality <strong>of</strong> stone<br />

metal grade- iv (20mm to 37 mm size)<br />

and clean coarse sand <strong>of</strong> F.M. 2.5 to 3<br />

including screening mixing cement<br />

concrete in mixer, and placing and in<br />

position vibrating screening curing<br />

taxes and royalty including the cost <strong>of</strong><br />

all materials and labour complete job<br />

as per approved design/drawing and<br />

relevant clause M.O.S.T. specification<br />

and direction <strong>of</strong> E/I. including cost <strong>of</strong><br />

machine but excluding the cost <strong>of</strong><br />

shuttering. Cum 7.77<br />

87<br />

(Rupees Forty Nine &<br />

paise Thirty Five) only<br />

Rs. 49.35<br />

(Rupees Twenty One &<br />

paise Sixty) only<br />

Rs. 21.60<br />

(Rupees Three Thousand<br />

Two hundred Forty One<br />

& paise Seventeen) only<br />

Rs. 3241.17<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma


GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the Road Bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

88


21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />

finished item <strong>of</strong> work.<br />

22. The contractor should give his full address and n<strong>ame</strong>.<br />

23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />

account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />

He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />

<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />

the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />

24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />

25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />

prior to use in work immediately after rejection otherwise department may remove for the site.<br />

26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />

varnished or painting as the case may be.<br />

27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />

28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />

clean.<br />

29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />

site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />

departmental custody.<br />

30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />

liable to pay any damage for such accident.<br />

31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />

days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />

responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />

32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />

by the contractor.<br />

33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />

classification or as given in this note sheet.<br />

34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />

% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />

applicable on the cost <strong>of</strong> bitumen also.<br />

35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />

8182(S) dated 12/11/2008 (for non plan works)<br />

Tenderer’s Signature Executive Engineer<br />

R.C.D, Road Division<br />

KODERMA<br />

89


COMPESATIO AD CODITIO OF COTRACT<br />

CLAUSE – I<br />

All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />

his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />

arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />

whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />

Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />

there<strong>of</strong>.<br />

CLAUSE –II<br />

The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />

contractor and shall be recall from the date on which the written order to commence the work is given to the<br />

contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />

being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />

compensational whole works shown by the tender for every day that the works remained uncommented or<br />

unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />

contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />

the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />

further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />

contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />

percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />

always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />

on the estimated cost <strong>of</strong> the work as shown in the tender.<br />

ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />

CLAUSE – III<br />

In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />

compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />

amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />

Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />

(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />

Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />

forfeited and absolutely at the disposal <strong>of</strong> Government.<br />

Tenderer Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

90


OTIFICATIO OF CLAUSE -18<br />

(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />

such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />

in which the work is done.<br />

(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />

labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />

works if the labourers had been immediately employed by him.<br />

(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />

conduct the money due to contractor any requirement or estimated to be required for making the loss<br />

suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />

benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />

justified the terms <strong>of</strong> contract.<br />

(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />

the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />

neighborhood.<br />

(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />

contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />

¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rd rduhdh rd uhdh inkf/kdkfj;ksa inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks dks j[kkuk j[kkuk iMsxkA<br />

iMsxkA<br />

¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />

tk,xhA<br />

¼x½ fufonk vkea=.k lwpuk es es izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />

Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O<br />

;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />

tk,axs<br />

rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />

vfHk;Urk@lgk;d<br />

vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />

duh;<br />

vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />

Contractor Signature Executive Engineer<br />

R.C.D, Road Division<br />

Koderma<br />

91


fufonk fufonk dh dh ’krsZ<br />

’krsZ<br />

¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />

fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />

¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />

¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />

LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />

djuk vfuok;Z gksxkA<br />

¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />

gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />

bafM;k] dksMjek esa Hkqxrs; gksxkA<br />

¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />

o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />

dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />

fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />

¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />

laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />

¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />

ekU; ugha gksxkA<br />

¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />

¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />

¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />

¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />

rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />

ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />

vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />

izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />

ds vkyksd esa dh tk;xh A<br />

(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />

ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />

vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />

gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />

tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />

¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />

lkexzh ;k midj.k miyC/k ugha djk,xkA<br />

¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />

¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />

92


¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />

ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />

¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />

¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />

¼17½ çkDdyu dh jkf’k ?kV&c


RATES TO BE QUOTED BY TEDERER<br />

[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />

(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />

B.O.Q. quote i.e On Schedule Rates.<br />

(b) My over all rates for all item for the whole work will ………...% (in figures)<br />

……………………………………. percent (in words) ABOVE than the rates quoted in the<br />

B.O.Q.<br />

or<br />

(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />

…………………………………… percent (in words) BELOW than the rates mentioned in<br />

the enclosed B.O.Q.<br />

Details :- Signature <strong>of</strong> Contractor<br />

1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />

2. Registration No. :-<br />

3. Time <strong>of</strong> Completion :-<br />

4. I.T Clearance Certificate :-<br />

5. Sales Tax Clearance Certificate :-<br />

6. Earnest Money Deposited with the Tender :-<br />

7. Lab our License No. Year Valid up to<br />

8. Character Certificate granted by the authority Valid up to<br />

(To be filled by the department)<br />

94<br />

Signature <strong>of</strong> Contractor<br />

B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />

Address ……………………………………………………………………………………………...<br />

……………………………………………………………………………………………...<br />

Registration No.<br />

Cost deposited vide money receipt no. For Rupees<br />

Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />

Executive Engineer<br />

R.C.D, Road Division, Koderma

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!