GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 01<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Surface Renewal to Doranda- Shankh-<br />
Vendro-Patna Road in km 1, 2, 6, 7, 8(500),<br />
19, 20 and 21 for year 2011-12<br />
Estimated cost : Rs. 44,80,943/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />
Earnest Money : Rs. 89,700/-<br />
Time <strong>of</strong> Completion : Four Months<br />
OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />
ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIV DIVISION<br />
DIV DIV ISION<br />
KODERMA.<br />
KODERMA.<br />
KODERMA.<br />
1
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
1250/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Surface Renual to Doranda- Shankh-Vendro-Patna Road in km 1, 2,<br />
6, 7 ,8(500), 19, 20 and 21 for year 2011-12 in R.C.D., Road Division Koderma For Year 2011-12 and will be<br />
opened in the presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective<br />
<strong>of</strong>ficer in their <strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 44,80,943/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 89,700/- for the work.<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned on from 12-10-2011 to 13-10-2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
2
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to Four months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
3<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Surface Renual to Doranda- Shankh-Vendro-Patna Road in<br />
Sl.<br />
o.<br />
km 1, 2, 6, 7 ,8(500), 19, 20 and 21 for year 2011-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Providing and laying 50 mm thick Bituminous<br />
macadam with 100-120 TPH hot-mix plant producing<br />
an average out-put <strong>of</strong> 75 tonnes/hrs. using crushed<br />
aggregates <strong>of</strong> specified grading premixed with<br />
bituminous binder, transported to site, laid over a<br />
previously prepared surface with paver finisher to the<br />
required grade level and alignment and rolled as per<br />
clauses 501.6 and 501.70 to achieve the desired<br />
compaction.<br />
4<br />
sqm<br />
2. Providing and laying 25 mm thick semi-dense<br />
bituminous concrete with -100-120 TPH batch type<br />
HMP producing an average out-put <strong>of</strong> 75 tonnes/hrs.<br />
using crushed aggregates <strong>of</strong> specified grading<br />
premixed with bituminous binder @ 4.5 to 5.0 percent<br />
<strong>of</strong> mix and filler transporting the hot-mix plant to work<br />
site, having with a hydraulic paver finisher with sensor<br />
control to required grade level and alignment, rolling<br />
with smooth wheeled vibratory and tandem rollers to<br />
achieve the desired compaction as per MORT&H<br />
specification clause No. 508, complete in all respects. sqm<br />
22.87<br />
577.59<br />
(Rupees Five<br />
Thousand<br />
Three Hundred<br />
Forty Three)<br />
only<br />
Rs. 5,343.00<br />
(Rupees Seven<br />
Thousand Five<br />
Hundred Forty<br />
Six & paise<br />
Forty four)<br />
only<br />
Rs. 7546.44<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the Road Bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractor’s responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no claim<br />
in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
5
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
6
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
7
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />
tk,xhA<br />
¼x½ ¼x½ fufo fufonk fufo fufonk<br />
nk vkea=.k vkea=.k lwpuk lwpuk es es izdkf'kr izdkf'kr lHkh lHkh ca/kusa ca/kusa ekU; ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk vfHk;Urk j[kkuk j[kkuk j[kkuk vko';d vko';d vko';d gS] gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />
A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
8
fufonk fufonk dh dh ’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
9
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
11<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 02<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Special Repair work in Koderma-Jamua<br />
Road in km 1(P), 2(P), 5(P), and 49(P) for<br />
the year 2011-12.<br />
Estimated cost : Rs. 22,41,789/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />
Earnest Money : Rs. 44,900/-<br />
Time <strong>of</strong> Completion : Three Months<br />
OFFICE OFFICE OF OF OF THE THE EXECUTIVE EXECUTIVE ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., ROAD ROAD DIVISION<br />
DIVISION<br />
KODERMA.<br />
KODERMA.<br />
12
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
5000/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14.10.2011 by the Chief Engineer(comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Special Repair work in Koderma-Jamua Road in km 1(P), 2(P), 5(P),<br />
and 49(P).in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the presence <strong>of</strong> the<br />
Contractors or their authorized agents on 14.10.2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their <strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 22,41,789/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 44,900/- for the work .<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned from 12.10.2011 to 13.10.2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
13
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to three month from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
14<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Special Repair work in Koderma-Jamua Road in km 1(P),<br />
Sl.<br />
o.<br />
2(P), 5(P), and 49(P) for the year 2011-12.<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Dry lean cement concrete sub-base (construction<br />
<strong>of</strong> dry lean cement concrete sub-base over<br />
prepared sub-grade with coarse and fine aggregates<br />
confirming to IS – 383 the size <strong>of</strong> course aggregate<br />
not exceeding 25 mm, aggregate ratio not to<br />
exceed 15:1 aggregate gradation after blending to<br />
be as per table 600-1 cement concrete not to be<br />
less than 150 kg/cum, OMC to be determined<br />
during trail length construction, concrete strength<br />
not to be less than 10 MPQ at 7 days mixed in<br />
concrete mixture transported to site laid with<br />
manually compacted with compactor finishing and<br />
curing.<br />
(a) In km 1(P), 2(P), 5(P)<br />
(b) In km 49(P)<br />
2. Construction <strong>of</strong> unreinforced dowel joined plain<br />
cement concrete pavement over prepared sub-base<br />
with 43 grade cement @ 400 kg/cum coarse and<br />
find aggregate confirming to IS -383 maximum<br />
size <strong>of</strong> coarse aggregate not exceeding 25 mm<br />
mixed in concrete mixture as per approved mixed<br />
design, transported to site laid with a fixed form <strong>of</strong><br />
sleep from spread compacted and finished in a<br />
continuous operation including provision <strong>of</strong><br />
continuous expansion construction and<br />
longitudinal joints, joints filter etc. in lines and<br />
grade as per technical specification and direction<br />
<strong>of</strong> E/I. Excluding the cost <strong>of</strong> dowel and tie bars etc.<br />
(a) In km 1(P), 2(P), 5(P)<br />
15<br />
cum<br />
cum<br />
(a)137.50<br />
(b) 27.50<br />
(a) 343.75<br />
(Rupees One<br />
Thousand Eight<br />
Hundred Thirty<br />
Seven & paise<br />
Ninety One ) only<br />
Rs. 1837.91<br />
(Rupees One<br />
Thousand Eight<br />
Hundred Eighty<br />
Eight & paise<br />
Eighty Three) only<br />
Rs. 1888.83<br />
(Rupees Four<br />
Thousand Three<br />
Hundred Seventy<br />
Two & paise Fifty<br />
Three) only<br />
Rs. 4372.53
(b) In km 49(P)<br />
3. Construction <strong>of</strong> sub-grade and earthen shoulder<br />
with approved material obtained from borrow pits<br />
or any other sources free from logs, stamps, roots,<br />
rubbish or any other ingredients likely to<br />
deteriorate or effect the stability <strong>of</strong> the<br />
embankment including breaking with all leads and<br />
lifts including breaking the clods to maximum to<br />
60 mm cube, placing the earth in layer not<br />
exceeding 225 mm in loose thickness, rough<br />
dressed including cost <strong>of</strong> cutting and removing<br />
shrubs and roots falling in borrow areas all<br />
complete job as per approved design, specification<br />
and direction <strong>of</strong> E/I (Table No. 300-2).<br />
(a) In km 1(P), 2(P), 5(P)<br />
(b) In km 49(P)<br />
4. Providing stone metal grade –ii (63 mm to 45 mm<br />
size) M.O.S.T. specification including hand<br />
packing consolidation with approved quality <strong>of</strong><br />
screening materials mooram having P.I. value not<br />
more than 6 @ 23% loose quantity <strong>of</strong> stone metal<br />
in proper grade camber or super elevation (laid<br />
loose thickness to be 1.33 times the prescribed<br />
compacted thickness <strong>of</strong> stone metals) dry and wet<br />
rolling with power road roller making and<br />
maintaining diversion including cost <strong>of</strong> labour and<br />
materials such as stone metals and mooram all<br />
taxes, royalty and etc. also including cost <strong>of</strong> P.O.I<br />
and all other lubricants and also hire charges <strong>of</strong><br />
road roller without depreciation and major repair<br />
and carriage <strong>of</strong> materials and water with all leads<br />
and complete job as per direction <strong>of</strong> E/I.<br />
(a) In km 1(P), 2(P), 5(P)<br />
16<br />
cum<br />
(b) 68.75<br />
(a) 350.00<br />
(a) 70.00<br />
cum 28.28<br />
5. Providing stone metal grade –iii (53.2 mm to 22.4<br />
mm size) confirming M.O.S.T. specification<br />
including hand packing consolidation with 33.01 982.38<br />
(Rupees<br />
Four Thousand<br />
Four Hundred<br />
Fifteen & paise<br />
Twenty) only<br />
Rs. 4415.20<br />
(Rupees One<br />
Hundred Seventy<br />
One) only<br />
Rs. 171.00<br />
(Rupees One<br />
Hundred Seventy<br />
One) only<br />
Rs. 171.00<br />
(Rupees Nine<br />
Hundred Twenty<br />
Nine & paise<br />
Thirty Eight) only<br />
Rs. 929.38<br />
(Rupees Nine<br />
Hundred Eighty<br />
Two & paise
approved quality <strong>of</strong> screening materials mooram<br />
having P.I. value not more than 6 @ 23% loose<br />
quantity <strong>of</strong> stone metal in proper grade, camber or<br />
super elevation (laid loose thickness to be 1.33<br />
times the prescribed compacted thickness <strong>of</strong> stone<br />
metals) dry and wet rolling with power road roller<br />
inclusive <strong>of</strong> water with all leads and lifts providing<br />
light danger signal, chaukidar, making and<br />
maintaining diversion including cost <strong>of</strong> stone<br />
metals and mooram all taxes, royalty and etc. also<br />
including cost <strong>of</strong> P.O.I and all other lubricants and<br />
also hire charges <strong>of</strong> road roller without<br />
depreciation and major repair and carriage <strong>of</strong><br />
materials and water with all leads and complete job<br />
as per specification and direction <strong>of</strong> E/I. (mode <strong>of</strong><br />
measurement to compacted quantity)<br />
(a) In km 1(P), 2(P), 5(P)<br />
17<br />
Thirty Eight) only<br />
Rs. 982.38<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the road bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />
claim in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
18
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
19
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
20
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuek fuekZ.k fuek Z.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />
tk,xhA<br />
¼x½ fufonk vkea=.k lwpuk es izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM &&<br />
& 3 3 laosnd laosnd 10 10 10 yk[k yk[k ds ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk tk;sxk A<br />
A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
21
fufonk fufonk dh dh ’krsZ<br />
’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
22
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
24<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 03<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> 3.00m X 2.00m RCC Slab<br />
Culvert in Koderma Jamua Road in Km 2<br />
(2/3) for the year 2011-12<br />
Estimated cost : Rs. 14,77,742/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 2,500/-<br />
Earnest Money : Rs. 29,600/-<br />
Time <strong>of</strong> Completion : Four Months<br />
OFFICE OFFICE OFFICE OF OF THE THE EXE EXECUTIVE EXE CUTIVE ENGINEER<br />
ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., ROAD ROAD DIVISION<br />
DIVISION<br />
KODERMA.<br />
KODERMA.<br />
KODERMA.<br />
25
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
2,500/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14.10.2011 by the Chief Engineer(comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> 3.00m X 2.00m RCC Slab Culvert In Koderma<br />
Jamua Road in Km 2 (2/3) in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the<br />
presence <strong>of</strong> the Contractors or their authorized agents on 14.10.2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their<br />
<strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 14,77,742/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 29,600/- for the work .<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned from 12.10.2011 to 13.10.2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
26
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to Four Months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
27<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> 3.00m X 2.00m RCC Slab Culvert In<br />
Koderma Jamua Road in Km 2 (2/3) for the year 2011-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
Sl.<br />
o.<br />
1 2 3 4 5<br />
1 Dismantling <strong>of</strong> existing structures like culverts,<br />
bridges, retaining walls and other structure<br />
comprising <strong>of</strong> masonry, cement concrete, wood<br />
work, steel work, including T&P and scaffolding<br />
wherever necessary, shorting the dismantled<br />
material, disposal <strong>of</strong> unserviceable material and<br />
stacking the serviceable material with all lifts and<br />
lead <strong>of</strong> 1000 metres<br />
(i) R.C.C. by mechanical means<br />
16.60<br />
Cum<br />
2. E/W in excavation <strong>of</strong> foundn. Trenches for bridges<br />
with all materials, labour, tools, and plants,<br />
leveling and ramming the foundation beds,<br />
dressing the sides, removing roots, logs, shrubs<br />
and other loose and deleterious materials likely to<br />
deteriorate, adequate provision against erosion,<br />
water pollution and drainage to keep the site free<br />
<strong>of</strong> water, stacking the excavated soil clear from<br />
the edge <strong>of</strong> excavation, providing light, barrier,<br />
danger signals, choukidar, making and<br />
maintaining diversion, traffic regulation all<br />
complete job as per design/drawing and technical<br />
specification and MORT&H specification clause<br />
304 and other relevant clauses and direction <strong>of</strong><br />
E/I (Excluding cost <strong>of</strong> dewatering and shoring)(i)<br />
Ordinary Soil. Cum 178.305<br />
3. Providing P.C.C./R.C.C. M-150 with nominal mix<br />
(1:2:4) with approved quality <strong>of</strong> stone chips 20<br />
mm to 6 mm size and clean coarse sand <strong>of</strong> 2.5 to<br />
3.5 F.M. in foundation and plinth including mixing<br />
cement concrete in mixer, Screening royalty and<br />
all taxes with hire charges <strong>of</strong> machinery all<br />
complete with cost all labour and materials as per<br />
MOST specification and direction <strong>of</strong> E/I. Cum 119.792<br />
4. Providing P.C.C./R.C.C. M-10 with nominal mix<br />
(1:3:6) in foundation <strong>of</strong> various component <strong>of</strong><br />
culvert and bridge with approved quality <strong>of</strong> stone<br />
metal grade- iv (20mm to 37 mm size) and clean<br />
coarse sand <strong>of</strong> F.M. 2.5 to 3 including screening<br />
mixing cement concrete in mixer, and placing and<br />
in position vibrating screening curing taxes and<br />
royalty including the cost <strong>of</strong> all materials and<br />
labour complete job as per approved<br />
design/drawing and relevant clause M.O.S.T.<br />
specification and direction <strong>of</strong> E/I. including cost <strong>of</strong> Cum 16.945<br />
28<br />
(Rupees Five<br />
Hundred Fifty Seven)<br />
only<br />
557.00<br />
(Rupees Forty One &<br />
paise Fifteen) only<br />
41.15<br />
(Rupees Four<br />
Thousand One<br />
Hundred Twenty<br />
Four & paise Ninety<br />
Nine) only<br />
4124.99<br />
(Rupees Three<br />
Thousand One<br />
Hundred Sixty<br />
Seven& paise<br />
Seventy Three) only<br />
3167.73
machine but excluding the cost <strong>of</strong> shuttering.<br />
5. Providing P.C.C./R.C.C. M-150 with nominal mix<br />
(1:2:4) in superstructure/substructure <strong>of</strong> various<br />
component <strong>of</strong> culverts and bridge with 20 mm to<br />
6 mm stone chips (20 mm to 10 mm, 2 part and<br />
10 mm to 6 mm 1 part) and clean coarse sand<br />
F.M. 2.0 to 3.5 F.M. including mixing cement<br />
concrete in mixture screening royalty and all taxes<br />
with hire charges <strong>of</strong> machinery all complete with<br />
cost <strong>of</strong> all labour and materials as per MOST<br />
specification and direction <strong>of</strong> E/I. Cum 95.95<br />
6. Providing PCC/RCC M-200 with nominal mix<br />
(1:1.5:3) with approved quality <strong>of</strong> stone chips 20<br />
mm to 6 mm and clean coarse sand in bed plate<br />
cap, approach slabs etc. including the cost <strong>of</strong> all<br />
labour and materials, screening shuttering, mixing<br />
the complete in mixing placing in position,<br />
vibrating striking curing taxes and royalty all<br />
complete as per approved design and drawing<br />
and relevant clause <strong>of</strong> M.O.S.T. specification and<br />
direction <strong>of</strong> E/I.<br />
7. Providing PCC/RCC M-300 with nominal mix<br />
(1:1:2) in deck slab including the cost <strong>of</strong> all labour<br />
and materials, screening shuttering, mixing the<br />
complete in mixing placing in position, vibrating<br />
striking curing taxes and royalty all complete as<br />
per approved design and drawing and relevant<br />
clause <strong>of</strong> MOST specification <strong>of</strong> E/I excluding cost<br />
<strong>of</strong> reinforcement and its bending placing in<br />
Cum 7.14<br />
position. Cum 16.63<br />
8. Providing PCC/RCC M-300 with nominal mix<br />
(1:1:2) in wearing coat <strong>of</strong> deck slab with stone<br />
chips 20 mm to 6 mm size (2 part 20 mm to 10<br />
mm and one part 10 mm to 6 mm) and clean<br />
coarse sand <strong>of</strong> F.M. 2.0 to 3.5 including mixing in<br />
concrete mixture and vibrating but excluding cost<br />
<strong>of</strong> reinforcement bending & binding excluding all<br />
cost <strong>of</strong> material and labour all complete as per<br />
specification <strong>of</strong> M.O.S.T.and direction <strong>of</strong> E/I. Cum 3.267<br />
9. Supplying, fitting and placing HYSD bar<br />
reinforcement in sub-structure complete as per<br />
drawing and technical specification<br />
M.T. 3.959<br />
10. Providing filter media with stone metal grade-III<br />
conforming to MORT&H Table 400-7, free from<br />
grass, dirt and debris and other loose and<br />
deleterious materials likely to deteriorate,<br />
providing light, barrier, danger signals, choukidar,<br />
makind and maintaining diversion, traffic<br />
regulation incidental charges, all taxes and royalty<br />
etc. all technical specification and MORT&H<br />
specification clause 305 and other relevant<br />
29<br />
Cum 39.30<br />
(Rupees Four<br />
Thousand Three<br />
Hundred Eleven &<br />
paise Twenty Three)<br />
only<br />
4311.23<br />
(Rupees Four<br />
Thousand Eight<br />
Hundred Ten & paise<br />
Four) only<br />
4810.04<br />
(Rupees Six<br />
Thousand Two<br />
Hundred Fourteen &<br />
paise Seventy Two)<br />
only<br />
6214.72<br />
(Rupees Four<br />
Thousand Nine<br />
Hundred One &<br />
paise Ninety Two)<br />
only<br />
4901.92<br />
(Rupees Fifty Seven<br />
Thousand Nine<br />
Hundred Twelve &<br />
paise Ninety Six)<br />
only<br />
57912.96<br />
(Rupees Seven<br />
Hundred Eighty One<br />
& paise Seventy<br />
Five) only<br />
781.75
clauses and direction <strong>of</strong> E/I.<br />
11. Providing weep holes in Brick<br />
masonry/Plan/Reinforced concrete abutment,<br />
wing wall/return wall with 100 mm dia AC pipe<br />
extending through the full width <strong>of</strong> the structure<br />
with slope <strong>of</strong> 1V:20H towards drawing foce.<br />
Complete as per drawing and Technical<br />
specifications Nos. 40.00<br />
12. Providing fitting and fixing tar paper <strong>of</strong> approved<br />
quality in two layers <strong>of</strong> bed plate/cap <strong>of</strong> abutment<br />
and piers as per standard specification and<br />
direction <strong>of</strong> E/I. Sqm 13.20<br />
13. making with raised 25 mm cement plaster (1:4)<br />
numbering culverts and bridges and for working<br />
load clarification at end <strong>of</strong> parapets including cost<br />
numbering and painting as per M.O.S.T.<br />
specification and direction <strong>of</strong> E/I. including cost <strong>of</strong><br />
all labour materials, royalty and taxes etc. all<br />
complete job. Nos. 4.00<br />
14. Painting posts with two loats <strong>of</strong> en<strong>ame</strong>l paints <strong>of</strong><br />
approved shade and make after cleaning the<br />
surface thoroughly all complete job.<br />
15. Earth <strong>Work</strong> in back filling in foundation trenches<br />
and plinth in layer not exceeding 150 m thick well<br />
watered rammed fully compacted and line<br />
dressed with earth obtained from excavation <strong>of</strong><br />
foundation trenches with a lead <strong>of</strong> 50 m and lift <strong>of</strong><br />
1.5 m complete as per building specification and<br />
30<br />
Sqm 13.78<br />
direction <strong>of</strong> E/I. Cum 29.72<br />
16. Granular Sub-Base with Coarse Graded Material<br />
(Table : 400-2) ( construction <strong>of</strong> granular subbase<br />
by providing coarse graded material,<br />
spreading in uniform layers with motor grader on<br />
prepared surface, mixing by mix in place method<br />
with rotavator at OMC, and compacting with<br />
vibratory roller to achieve the desired density,<br />
complete as per clause 401) Cum 34.20<br />
17. Providing, laying, spreading and compacting<br />
stone metal Go- II with crushable type screening<br />
material such as moored base course on well<br />
prepared surface and compacting with roller to<br />
achieve the desired density as per MOST<br />
specification 406 (4th revision) and direction <strong>of</strong><br />
E/I. Cum 16.20<br />
18. Providing, laying, spreading and compacting<br />
stone metal Go- III with crushable type screening<br />
material such as moorum base course on well<br />
prepared surface and compacting with roller to<br />
achieve the desired density as per MOST<br />
specification 406 (4th revision) and direction <strong>of</strong><br />
E/I.<br />
19. Providing 50 mm thick compacted built-up-spray<br />
Cum 8.10<br />
(Rupees One<br />
Hundred Four) only<br />
104.00<br />
(Rupees One<br />
Hundred Twenty<br />
Two) only<br />
122.00<br />
(Rupees One<br />
Hundred Thirty &<br />
paise Eighty Five)<br />
only<br />
130.85<br />
(Rupees Forty Nine<br />
& paise Thirty Five)<br />
only<br />
49.35<br />
(Rupees Twenty One<br />
& paise Sixty) only<br />
21.60<br />
(Rupees Three<br />
Hundred Sixty Five<br />
& paise Sixty Seven)<br />
only<br />
365.67<br />
(Rupees One<br />
Thousand One<br />
Hundred Eighteen &<br />
paisa Sixteen) only<br />
1118.16<br />
(Rupees One<br />
Thousand One<br />
Hundred Seventy<br />
Eight & paise Ninety<br />
One) only<br />
1178.91
Grout over WBM surface including cleaning the<br />
surface heating bitumen to required temp.<br />
applying tack coat @ 10 kg/10 cum and also<br />
including cost <strong>of</strong> bitumen and stone aggregates<br />
conforming to physical properties & grading given<br />
in the MOST table 500-7(3rd revision) speeding<br />
stone metal @ 0.66 cum per 10 sqm in layer,<br />
hand packing rolling compacting and then<br />
applying spray <strong>of</strong> bitumen@ 15kg/10sqm finishing<br />
with key aggregates 0.13 cum/10sqm in proper<br />
grade camber <strong>of</strong> super elevation and rolling the<br />
s<strong>ame</strong> with powder road roller and finishing the<br />
surface with temple including the cost <strong>of</strong> barriers,<br />
danger signal, choukidar making and maintaining<br />
diversion, cost <strong>of</strong> carriage <strong>of</strong> full bitumen drum<br />
from departmental godown in good condition<br />
including cost <strong>of</strong> all labour, cost <strong>of</strong> P.O.L. and<br />
other lubricants and also hire charges <strong>of</strong> road<br />
roller without depreciation and major repair all<br />
complete job as per specification and direction <strong>of</strong><br />
E/I and material carriage <strong>of</strong> all lead.<br />
31<br />
Sqm<br />
108.00<br />
20. Providing 20 mm thick open graded premixed<br />
carpet over bituminous surface in proper grade,<br />
camber and super elevation with stone chips <strong>of</strong><br />
13.2 mm and 11.2 mm size in ratio 2:1 @ 0.27<br />
cum and bitumen @ 19.6 kg including tack-coat<br />
@ 5 kg all per 10 sqm surface including Cost <strong>of</strong><br />
heating the aggregate and bitumen to required<br />
temperature with cost <strong>of</strong> fuel cleaning the surface,<br />
properly with iron brush and broom rolling,<br />
providing light barrier, danger signals, choukidar,<br />
carriage <strong>of</strong> bitumen drum up to 8 km lead from<br />
godown to work site and returning the s<strong>ame</strong> in<br />
good conditions to the godown and hire charge <strong>of</strong><br />
road roller all complete as per specification and<br />
direction <strong>of</strong> E/I. Sqm 108.00<br />
(Rupees Two<br />
Hundred Four &<br />
paise One) only<br />
204.01<br />
(Rupees One<br />
Hundred Forty Nine<br />
& paise Seventy<br />
One) only<br />
149.71<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GEERAL AD SPECIAL CODITIO FOR THE COTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the road bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />
claim in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
32
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
33
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
34
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds ds vuql vuqlkj vuql vuqlkj<br />
kj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />
tk,xhA<br />
¼x½ fufonk vkea=.k lwpuk es izdkf'kr izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />
A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
35
fufonk fufonk dh dh ’krsZ<br />
’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
36
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
38<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 04<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />
1.50 X 1.00 m in 13 th (13/2) km <strong>of</strong><br />
Koderma-Jamua Road for the year 2011-12<br />
Estimated cost : Rs. 5,98,924/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 1,250/-<br />
Earnest Money : Rs. 12,000/-<br />
Time <strong>of</strong> Completion : Three Months<br />
OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />
ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />
DIVISION<br />
DIVISION<br />
KODERMA.<br />
KODERMA.<br />
KODERMA.<br />
39
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
1250/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in 13 th<br />
(13/2) km <strong>of</strong> Koderma-Jamua Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in<br />
the presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in<br />
their <strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 5,98,924/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 12,000/- for the work.<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned on from 12-10-2011 to 13-10-2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
40
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
41<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in<br />
Sl.<br />
o.<br />
13 th km <strong>of</strong> Koderma-Jamua Road for the year 2011-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Dismantalling <strong>of</strong> existing structures<br />
like culverts, bridges, retaining<br />
walls and other structure<br />
comprising <strong>of</strong> masonry, cement<br />
concrete, wood work, steel work,<br />
including T&P and scaffolding<br />
wherever necessary, shorting the<br />
dismantled material, disposal <strong>of</strong><br />
unserviceable material and stacking<br />
the serviceable material with all<br />
lifts and lead <strong>of</strong> 1000 metres<br />
(a) Brick <strong>Work</strong><br />
(b) R.C.C. slab<br />
2. E/W in excavation <strong>of</strong> foundn.<br />
Trenches for bridges with all<br />
materials, labour, tools, and plants,<br />
levelling and ramming the<br />
foundation beds, dressing the sides,<br />
removing roots, logs, shrubs and<br />
other loose and deleterious<br />
materials likely to deteriorate,<br />
adequate provision against erosion,<br />
water pollution and drainage to<br />
keep the site free <strong>of</strong> water, stacking<br />
the excavated soil clear from the<br />
edge <strong>of</strong> excavation, providing light,<br />
barrier, danger signals, choukidar,<br />
making and maintaining diversion,<br />
traffic regulation all complete job<br />
as per design/drawing and technical<br />
specification and MORT&H<br />
specification clause 304 and other<br />
relevant clauses and direction <strong>of</strong> E/I<br />
(Excluding cost <strong>of</strong> dewatering and<br />
shoring)<br />
Cum<br />
Cum<br />
(i) Ordinary Soil Cum<br />
42<br />
27.90<br />
6.187<br />
102.752<br />
3. Providing P.C.C./R.C.C. M-150<br />
with nominal mix (1:2:4) with<br />
approved quality <strong>of</strong> stone chips 20 Cum 31.00<br />
(Rupees One Hundred Fifty<br />
Five & paise Twenty Five)<br />
only<br />
Rs. 155.25<br />
(Rupees Five Hundred Fifty<br />
Eight& paise Fifty Five) only<br />
Rs. 558.55<br />
(Rupees Forty One & paise<br />
Fifteen) only<br />
Rs. 41.15<br />
(Rupees Four Thousand One<br />
Hundred Ninety & paise Sixty Two)<br />
only<br />
Rs. 4190.62
mm to 6 mm size and clean coarse<br />
sand <strong>of</strong> 2.5 to 3.5 F.M. in<br />
foundation and plinth including<br />
mixing cement concrete in mixer,<br />
Screening royalty and all taxes with<br />
hire charges <strong>of</strong> machinery all<br />
complete with cost all labour and<br />
materials as per MOST<br />
specification and direction <strong>of</strong> E/I.<br />
4. Providing random rubble stone<br />
masonry in C.M. (1:3) in<br />
foundation and plinth with hammer<br />
dressed stone <strong>of</strong> less than 0.03 cum<br />
in volume and clean coarse sand <strong>of</strong><br />
F.M. 2 to 2.5 including cost <strong>of</strong><br />
screening-raking out joints to 20<br />
mm depth curing taxes and royalty<br />
all complete as per building<br />
specification and direction <strong>of</strong> E/I. Cum 50.928<br />
5. Providing random rubble stone<br />
masonry in C.M. (1:3) in super<br />
Structure with hammer dressed<br />
stone <strong>of</strong> less than 0.03 cum in<br />
volume and clean coarse sand <strong>of</strong><br />
F.M. 2 to 2.5 including cost <strong>of</strong><br />
screening-raking out joints to 20<br />
mm depth curing taxes and royalty<br />
all complete as per building<br />
specification and direction <strong>of</strong> E/I. Cum 58.49<br />
6. Providing PCC/RCC M-200 with<br />
nominal mix (1:1.5:3) with<br />
approved quality <strong>of</strong> stone chips 20<br />
mm to 6 mm and clean coarse sand<br />
in bed plate cap, approach slabs etc.<br />
--do--do-- Cum 6.60<br />
7. Providing PCC/RCC M-300 with<br />
nominal mix (1:1:2) in deck slab<br />
do- as- do as per MOST<br />
specification <strong>of</strong> E/I excluding cost<br />
<strong>of</strong> reinforcement and its bending<br />
placing in position. Cum 6.93<br />
8. Providing PCC/RCC M-300 with<br />
nominal mix (1:1:2) in wearing coat<br />
<strong>of</strong> deck slab with stone chips 20<br />
mm to 6 mm size (2 part 20 mm to Cum 1.89<br />
43<br />
(Rupees Two Thousand Two<br />
Hundred Sixty & paise Sixty<br />
Seven) only<br />
Rs. 2260.67<br />
(Rupees Two Thousand Three<br />
Hundred Twenty Eight & paise<br />
Fifty Seven) only<br />
Rs. 2328.57<br />
(Rupees Four Thousand Eight<br />
Hundred Sixty Nine & paise<br />
Eighty Seven) only<br />
Rs. 4869.87<br />
(Rupees Six Thousand Two<br />
Hundred Eighty One & paise<br />
Five) only<br />
Rs. 6281.05<br />
(Rupees Four Thousand Nine<br />
Hundred Sixty Eight & paise<br />
Twenty Five) only<br />
Rs. 4968.25
10 mm and one part 10 mm to 6<br />
mm) and clean coarse sand <strong>of</strong> F.M.<br />
2.0 to 3.5 including mixing in<br />
concrete mixture and vibrating but<br />
excluding cost <strong>of</strong> reinforcement<br />
bending & binding excluding all<br />
cost <strong>of</strong> material and labour all<br />
complete as per specification <strong>of</strong><br />
M.O.S.T.and direction <strong>of</strong> E/I.<br />
9. Supplying, fitting and placing<br />
HYSD bar reinforcement in substructure<br />
complete as per drawing<br />
and technical specification M.T. 1.375<br />
10. Providing filter media with stone<br />
metal grade-III conforming to<br />
MORT&H Table 400-7, free from<br />
grass, dirt and debris and other<br />
loose and deleterious materials<br />
likely to deteriorate, providing<br />
light, barrier, danger signals,<br />
choukidar, making and maintaining<br />
diversion, traffic regulation<br />
incidental charges, all taxes and<br />
royalty etc. all technical<br />
specification and MORT&H<br />
specification clause 305 and other<br />
relevant clauses and direction <strong>of</strong><br />
E/I. Cum 11.16<br />
11. Providing weep holes in Brick<br />
masonry/Plan/Reinforced concrete<br />
abutment, wing wall/return wall<br />
with 100 mm dia AC pipe<br />
extending through the full width <strong>of</strong><br />
the structure with slope <strong>of</strong> 1V:20H<br />
towards drawing foce. Complete as<br />
per drawing and Technical<br />
specifications. Nos. 30.00<br />
12. Providing fitting and fixing tar<br />
paper <strong>of</strong> approved quality in two<br />
layers <strong>of</strong> bed plate/cap <strong>of</strong> abutment<br />
and piers as per standard<br />
specification and direction <strong>of</strong> E/I. Sqm 13.20<br />
13. making with raised 25 mm cement<br />
plaster (1:4) numbering culverts<br />
and bridges and for working load Nos. 4.00<br />
44<br />
(Rupees Fifty Seven Thousand<br />
Nine Hundred Twenty One &<br />
paise Ninety Four) only<br />
Rs. 57921.94<br />
(Rupees Eight Hundred<br />
Seventy Three & paise Seven)<br />
only<br />
Rs. 873.07<br />
(Rupees One Hundred Four)<br />
only<br />
Rs. 104.00<br />
(Rupees One Hundred Twenty<br />
Two) only<br />
Rs. 122.00<br />
(Rupees One Hundred Thirty &<br />
paise Eighty five) only<br />
Rs. 130.85
clarification at end <strong>of</strong> parapets<br />
including cost numbering and<br />
painting as per M.O.S.T.<br />
specification and direction <strong>of</strong> E/I.<br />
including cost <strong>of</strong> all labour<br />
materials, royalty and taxes etc. all<br />
complete job.<br />
14. Painting posts with two loats <strong>of</strong><br />
en<strong>ame</strong>l paints <strong>of</strong> approved shade<br />
and make after cleaning the surface<br />
thoroughly all complete job. Sqm 8.46<br />
15. Earth <strong>Work</strong> in back filling in<br />
foundation trenches and plinth in<br />
layer not exceeding 150 m thick<br />
well watered rammed fully<br />
compacted and line dressed with<br />
earth obtained from excavation <strong>of</strong><br />
foundation trenches with a lead <strong>of</strong><br />
50 m and lift <strong>of</strong> 1.5 m complete as<br />
per building specification and<br />
direction <strong>of</strong> E/I. Cum 17.12<br />
16. Providing P.C.C./R.C.C. M-10 with<br />
nominal mix (1:3:6) in foundation<br />
<strong>of</strong> various component <strong>of</strong> culvert<br />
and bridge with approved quality <strong>of</strong><br />
stone metal grade- iv (20mm to 37<br />
mm size) and clean coarse sand <strong>of</strong><br />
F.M. 2.5 to 3 including screening<br />
mixing cement concrete in mixer,<br />
and placing and in position<br />
vibrating screening curing taxes<br />
and royalty including the cost <strong>of</strong> all<br />
materials and labour complete job<br />
as per approved design/drawing and<br />
relevant clause M.O.S.T.<br />
specification and direction <strong>of</strong> E/I.<br />
including cost <strong>of</strong> machine but<br />
excluding the cost <strong>of</strong> shuttering. Cum 7.77<br />
45<br />
(Rupees Forty Nine & paise<br />
Thirty Five) only<br />
Rs. 49.35<br />
(Rupees Twenty One & paise<br />
Sixty) only<br />
Rs. 21.60<br />
(Rupees Three Thousand Two<br />
hundred Forty One & paise<br />
Seventeen) only<br />
Rs. 3241.17<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the Road Bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />
claim in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
46
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
47
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
48
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />
tk,xhA<br />
¼x½ ¼x½ fufonk fufonk vke vkea=.k vke a=.k lwpuk lwpuk es es izdkf'kr izdkf'kr izdkf'kr lHkh lHkh ca/kusa ca/kusa ca/kusa ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk vfHk;Urk j[kkuk j[kkuk j[kkuk vko'; vko';d vko'; d d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />
A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
49
fufonk fufonk dh dh ’krsZ<br />
’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
50
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
52<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 05<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />
3.00 X 2.50 in 25 th (25/1) km <strong>of</strong> Koderma-<br />
Jamua Road for the year 2011-12<br />
Estimated cost : Rs. 16,19,527/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />
Earnest Money : Rs. 32,400/-<br />
Time <strong>of</strong> Completion : Three Months<br />
OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />
ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />
DIVISION<br />
DIVISION<br />
KODERMA.<br />
KODERMA.<br />
KODERMA.<br />
53
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
5,000/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in 25 th (25/1)<br />
km <strong>of</strong> Koderma-Jamua Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the<br />
presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their<br />
<strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 16,19,527/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 32,400/- for the work.<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned on from 12-10-2011 to 13-10-2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
54
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
55<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in<br />
Sl.<br />
o.<br />
25 th km <strong>of</strong> Koderma-Jamua Road for the year 2011-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Dismantling <strong>of</strong> existing structures like<br />
culverts, bridges, retaining walls and<br />
other structure comprising <strong>of</strong> masonry,<br />
cement concrete, wood work, steel work,<br />
including T&P and scaffolding wherever<br />
necessary, shorting the dismantled<br />
material, disposal <strong>of</strong> unserviceable<br />
material and stacking the serviceable<br />
material with all lifts and lead <strong>of</strong> 1000<br />
metres<br />
(a) R.C.C. slab<br />
2. E/W in excavation <strong>of</strong> foundn. Trenches<br />
for bridges with all materials, labour,<br />
tools, and plants, levelling and ramming<br />
the foundation beds, dressing the sides,<br />
removing roots, logs, shrubs and other<br />
loose and deleterious materials likely to<br />
deteriorate, adequate provision against<br />
erosion, water pollution and drainage to<br />
keep the site free <strong>of</strong> water, stacking the<br />
excavated soil clear from the edge <strong>of</strong><br />
excavation, providing light, barrier,<br />
danger signals, choukidar, making and<br />
maintaining diversion, traffic regulation<br />
all complete job as per design/drawing<br />
and technical specification and MORT&H<br />
specification clause 304 and other<br />
relevant clauses and direction <strong>of</strong> E/I<br />
(Excluding cost <strong>of</strong> dewatering and<br />
shoring)<br />
56<br />
Cum<br />
(i) Ordinary Soil Cum<br />
16.60<br />
178.305<br />
3. Providing P.C.C./R.C.C. M-150 with<br />
nominal mix (1:2:4) with approved<br />
quality <strong>of</strong> stone chips 20 mm to 6 mm<br />
size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />
F.M. in foundation and plinth including<br />
mixing cement concrete in mixer,<br />
Screening royalty and all taxes with hire Cum 98.80<br />
(Rupees Five Hundred<br />
Fifty Seven) only<br />
Rs. 557.00<br />
(Rupees Forty One &<br />
paise Fifteen) only<br />
Rs. 41.15<br />
(Rupees Four Thousand<br />
One Hundred Eighty &<br />
paise Fifty Five) only<br />
Rs. 4180.55
charges <strong>of</strong> machinery all complete with<br />
cost all labour and materials as per MOST<br />
specification and direction <strong>of</strong> E/I.<br />
4. Providing P.C.C./R.C.C. M-10 with<br />
nominal mix (1:3:6) in foundation <strong>of</strong><br />
various component <strong>of</strong> culvert and bridge<br />
with approved quality <strong>of</strong> stone metal<br />
grade- iv (20mm to 37 mm size) and clean<br />
coarse sand <strong>of</strong> F.M. 2.5 to 3 including<br />
screening mixing cement concrete in<br />
mixer, and placing and in position<br />
vibrating screening curing taxes and<br />
royalty including the cost <strong>of</strong> all materials<br />
and labour complete job as per approved<br />
design/drawing and relevant clause<br />
M.O.S.T. specification and direction <strong>of</strong><br />
E/I. including cost <strong>of</strong> machine but<br />
excluding the cost <strong>of</strong> shuttering. Cum 24.795<br />
5. Providing P.C.C./R.C.C. M-150 with<br />
nominal mix (1:2:4) with approved<br />
quality <strong>of</strong> stone chips 20 mm to 6 mm<br />
size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />
F.M. in foundation and plinth including<br />
mixing cement concrete in mixer,<br />
Screening royalty and all taxes with hire<br />
charges <strong>of</strong> machinery all complete with<br />
cost all labour and materials as per MOST<br />
specification and direction <strong>of</strong> E/I.<br />
(a) Abt + Wwall + Rwall + Parapet<br />
(b) Cut <strong>of</strong>f wall and Flooring<br />
Cum 20.992<br />
6. Providing PCC/RCC M-200 with nominal<br />
mix (1:1.5:3) with approved quality <strong>of</strong><br />
stone chips 20 mm to 6 mm and clean<br />
coarse sand in bed plate cap, approach<br />
slabs etc.<br />
(a) Bed Plate+Dirt Wall + Approach Slab Cum 30.68<br />
7. Providing PCC/RCC M-300 with nominal<br />
mix (1:1:2) in deck slab do- as- do as per<br />
MOST specification <strong>of</strong> E/I excluding cost<br />
<strong>of</strong> reinforcement and its bending placing<br />
in position. Cum 16.63<br />
8. Providing PCC/RCC M-300 with nominal<br />
mix (1:1:2) in wearing coat <strong>of</strong> deck slab<br />
Cum 3.267<br />
57<br />
Cum<br />
95.95<br />
(Rupees Three Thousand<br />
One Hundred Eighty One<br />
& paise Thirty One) only<br />
Rs. 3181.31<br />
(Rupees Four Thousand<br />
Three Hundred Sixty six<br />
& paise Sixty) only<br />
Rs. 4366.60<br />
(Rupees Four Thousand<br />
One Hundred Eighty &<br />
paise Fifty Five) only<br />
Rs. 4180.55<br />
(Rupees Four Thousand<br />
Eight Hundred Thirty<br />
Four & paise Ninety) only<br />
Rs. 4834.90<br />
(Rupees Six Thousand<br />
Two Hundred Thirty Nine<br />
& paise Seventeen) only<br />
Rs. 6239.17<br />
(Rupees Four Thousand<br />
Nine Hundred Twenty
with stone chips 20 mm to 6 mm size (2<br />
part 20 mm to 10 mm and one part 10 mm<br />
to 6 mm) and clean coarse sand <strong>of</strong> F.M.<br />
2.0 to 3.5 including mixing in concrete<br />
mixture and vibrating but excluding cost<br />
<strong>of</strong> reinforcement bending & binding<br />
excluding all cost <strong>of</strong> material and labour<br />
all complete as per specification <strong>of</strong><br />
M.O.S.T.and direction <strong>of</strong> E/I.<br />
9. Supplying, fitting and placing HYSD bar<br />
reinforcement in sub-structure complete<br />
as per drawing and technical specification<br />
10. Providing filter media with stone metal<br />
grade-III conforming to MORT&H Table<br />
400-7, free from grass, dirt and debris and<br />
other loose and deleterious materials<br />
likely to deteriorate, providing light,<br />
barrier, danger signals, choukidar, making<br />
M.T. 5.136<br />
and maintaining diversion, traffic<br />
regulation incidental charges, all taxes<br />
and royalty etc. all technical specification<br />
and MORT&H specification clause 305<br />
and other relevant clauses and direction <strong>of</strong><br />
E/I. Cum 39.30<br />
11. Providing weep holes in Brick<br />
masonry/Plan/Reinforced concrete<br />
abutment, wing wall/return wall with 100<br />
mm dia AC pipe extending through the<br />
full width <strong>of</strong> the structure with slope <strong>of</strong><br />
1V:20H towards drawing foce. Complete<br />
as per drawing and Technical<br />
specifications. Nos. 40.00<br />
12. Providing fitting and fixing tar paper <strong>of</strong><br />
approved quality in two layers <strong>of</strong> bed<br />
plate/cap <strong>of</strong> abutment and piers as per<br />
standard specification and direction <strong>of</strong><br />
E/I. Sqm 13.20<br />
13. making with raised 25 mm cement plaster<br />
(1:4) numbering culverts and bridges and<br />
for working load clarification at end <strong>of</strong><br />
parapets including cost numbering and<br />
painting as per M.O.S.T. specification and<br />
direction <strong>of</strong> E/I. including cost <strong>of</strong> all<br />
labour materials, royalty and taxes etc. all<br />
complete job. Nos. 4.00<br />
58<br />
Six & paise Thirty Seven)<br />
only<br />
Rs. 4926.37<br />
(Rupees Fifty Seven Thousand<br />
Nine Hundred Seventy Six &<br />
paise Thirty Five) only<br />
Rs. 57976.35<br />
(Rupees Seven Hundred<br />
Eighty one & paise<br />
Seventy Five) only<br />
Rs. 781.75<br />
(Rupees One Hundred<br />
Four) only<br />
Rs. 104.00<br />
(Rupees One Hundred<br />
Twenty Two) only<br />
Rs. 122.00<br />
(Rupees One Hundred<br />
Thirty & paise Eighty<br />
five) only<br />
Rs. 130.85
14. Painting posts with two loats <strong>of</strong> en<strong>ame</strong>l<br />
paints <strong>of</strong> approved shade and make after<br />
cleaning the surface thoroughly all<br />
complete job. Sqm 13.78<br />
15. Earth <strong>Work</strong> in back filling in foundation<br />
trenches and plinth in layer not exceeding<br />
150 m thick well watered rammed fully<br />
compacted and line dressed with earth<br />
obtained from excavation <strong>of</strong> foundation<br />
trenches with a lead <strong>of</strong> 50 m and lift <strong>of</strong><br />
1.5 m complete as per building<br />
specification and direction <strong>of</strong> E/I. Cum 29.72<br />
59<br />
(Rupees Forty Nine &<br />
paise Thirty Five) only<br />
Rs. 49.35<br />
(Rupees Twenty One &<br />
paise Sixty) only<br />
Rs. 21.60<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the Road Bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />
claim in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
60
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
61
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
62
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuekZ. fuekZ.k fuekZ. k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj njks njks es es es dVkSrh dVkSrh dj dj yh yh yh tk,xhA<br />
tk,xhA<br />
¼x½ fufonk vkea=.k lwpuk es izdkf'kr izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />
A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
63
fufonk fufonk dh dh ’krsZ<br />
’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
64
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
66<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 06<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />
3.00 X 2.50 in 24 th (24/1) km <strong>of</strong> Koderma-<br />
Jamua Road for the year 2011-12<br />
Estimated cost : Rs. 16,19,781/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 5,000/-<br />
Earnest Money : Rs. 32,400/-<br />
Time <strong>of</strong> Completion : Three Months<br />
OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />
ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />
DIVISION<br />
DIVISION<br />
KODERMA.<br />
KODERMA.<br />
KODERMA.<br />
67
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
5,000/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in 24 th (24/1)<br />
km <strong>of</strong> Koderma-Jamua Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in the<br />
presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in their<br />
<strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 16,19,781/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 32,400/- for the work.<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned on from 12-10-2011 to 13-10-2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
68
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
69<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 3.00 X 2.50 in<br />
Sl.<br />
o.<br />
24 th (24/1) km <strong>of</strong> Koderma-Jamua Road for the year 11-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Dismantling <strong>of</strong> existing structures like<br />
culverts, bridges, retaining walls and<br />
other structure comprising <strong>of</strong> masonry,<br />
cement concrete, wood work, steel work,<br />
including T&P and scaffolding wherever<br />
necessary, shorting the dismantled<br />
material, disposal <strong>of</strong> unserviceable<br />
material and stacking the serviceable<br />
material with all lifts and lead <strong>of</strong> 1000<br />
metres<br />
(a) R.C.C. slab<br />
2. E/W in excavation <strong>of</strong> foundn. Trenches<br />
for bridges with all materials, labour,<br />
tools, and plants, levelling and ramming<br />
the foundation beds, dressing the sides,<br />
removing roots, logs, shrubs and other<br />
loose and deleterious materials likely to<br />
deteriorate, adequate provision against<br />
erosion, water pollution and drainage to<br />
keep the site free <strong>of</strong> water, stacking the<br />
excavated soil clear from the edge <strong>of</strong><br />
excavation, providing light, barrier,<br />
danger signals, choukidar, making and<br />
maintaining diversion, traffic regulation<br />
all complete job as per design/drawing<br />
and technical specification and MORT&H<br />
specification clause 304 and other<br />
relevant clauses and direction <strong>of</strong> E/I<br />
(Excluding cost <strong>of</strong> dewatering and<br />
shoring)<br />
70<br />
Cum<br />
(i) Ordinary Soil Cum<br />
16.60<br />
178.305<br />
3. Providing P.C.C./R.C.C. M-150 with<br />
nominal mix (1:2:4) with approved<br />
quality <strong>of</strong> stone chips 20 mm to 6 mm<br />
size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />
F.M. in foundation and plinth including<br />
mixing cement concrete in mixer,<br />
Screening royalty and all taxes with hire<br />
charges <strong>of</strong> machinery all complete with Cum 119.792<br />
(Rupees Five Hundred<br />
Fifty Seven) only<br />
Rs. 557.00<br />
(Rupees Forty One &<br />
paise Fifteen) only<br />
Rs. 41.15<br />
(Rupees Four Thousand<br />
One Hundred Eighty &<br />
paise Fifty Five) only<br />
Rs. 4180.55
cost all labour and materials as per MOST<br />
specification and direction <strong>of</strong> E/I.<br />
4. Providing P.C.C./R.C.C. M-10 with<br />
nominal mix (1:3:6) in foundation <strong>of</strong><br />
various component <strong>of</strong> culvert and bridge<br />
with approved quality <strong>of</strong> stone metal<br />
grade- iv (20mm to 37 mm size) and clean<br />
coarse sand <strong>of</strong> F.M. 2.5 to 3 including<br />
screening mixing cement concrete in<br />
mixer, and placing and in position<br />
vibrating screening curing taxes and<br />
royalty including the cost <strong>of</strong> all materials<br />
and labour complete job as per approved<br />
design/drawing and relevant clause<br />
M.O.S.T. specification and direction <strong>of</strong><br />
E/I. including cost <strong>of</strong> machine but<br />
excluding the cost <strong>of</strong> shuttering. Cum 24.795<br />
5. Providing P.C.C./R.C.C. M-150 with<br />
nominal mix (1:2:4) with approved<br />
quality <strong>of</strong> stone chips 20 mm to 6 mm<br />
size and clean coarse sand <strong>of</strong> 2.5 to 3.5<br />
F.M. in Sub Structure including mixing<br />
cement concrete in mixer, Screening<br />
royalty and all taxes with hire charges <strong>of</strong><br />
machinery all complete with cost all<br />
labour and materials as per MOST<br />
specification and direction <strong>of</strong> E/I.<br />
6. Providing PCC/RCC M-200 with nominal<br />
mix (1:1.5:3) with approved quality <strong>of</strong><br />
stone chips 20 mm to 6 mm and clean<br />
coarse sand in bed plate cap, approach<br />
slabs etc.<br />
(a) Bed Plate+Dirt Wall + Approach<br />
71<br />
Cum<br />
95.95<br />
Slab Cum 30.68<br />
7. Providing PCC/RCC M-300 with nominal<br />
mix (1:1:2) in deck slab do- as- do as per<br />
MOST specification <strong>of</strong> E/I excluding cost<br />
<strong>of</strong> reinforcement and its bending placing<br />
in position. Cum 16.63<br />
8. Providing PCC/RCC M-300 with nominal<br />
mix (1:1:2) in wearing coat <strong>of</strong> deck slab<br />
with stone chips 20 mm to 6 mm size (2<br />
part 20 mm to 10 mm and one part 10 mm<br />
to 6 mm) and clean coarse sand <strong>of</strong> F.M.<br />
2.0 to 3.5 including mixing in concrete Cum 3.267<br />
(Rupees Three Thousand<br />
One Hundred Eighty One<br />
& paise Thirty One) only<br />
Rs. 3181.31<br />
(Rupees Four Thousand<br />
Three Hundred Sixty Six<br />
& paise<br />
Sixty Nine) only<br />
Rs. 4366.69<br />
(Rupees Four Thousand<br />
Eight Hundred Thirty<br />
Four & paise Ninety) only<br />
Rs. 4834.90<br />
(Rupees Six Thousand<br />
Two Hundred Thirty Nine<br />
& paise Seventeen) only<br />
Rs. 6239.17<br />
(Rupees Four Thousand<br />
Nine Hundred<br />
Twenty Six & paise<br />
Thirty Seven) only<br />
Rs. 4926.37
9.<br />
mixture and vibrating but excluding cost<br />
<strong>of</strong> reinforcement bending & binding<br />
excluding all cost <strong>of</strong> material and labour<br />
all complete as per specification <strong>of</strong><br />
M.O.S.T.and direction <strong>of</strong> E/I.<br />
Supplying, fitting and placing HYSD bar<br />
reinforcement in sub-structure complete<br />
as per drawing and technical specification<br />
10. Providing filter media with stone metal<br />
grade-III conforming to MORT&H Table<br />
400-7, free from grass, dirt and debris and<br />
other loose and deleterious materials<br />
likely to deteriorate, providing light,<br />
barrier, danger signals, choukidar, making<br />
M.T. 5.136<br />
and maintaining diversion, traffic<br />
regulation incidental charges, all taxes<br />
and royalty etc. all technical specification<br />
and MORT&H specification clause 305<br />
and other relevant clauses and direction <strong>of</strong><br />
E/I. Cum 39.30<br />
11. Providing weep holes in Brick masonry/<br />
Plan/ Reinforced concrete abutment, wing<br />
wall/return wall with 100 mm dia AC<br />
pipe extending through the full width <strong>of</strong><br />
the structure with slope <strong>of</strong> 1V:20H<br />
towards drawing foce. Complete as per<br />
drawing and Technical specifications. Nos. 40.00<br />
12. Providing fitting and fixing tar paper <strong>of</strong><br />
approved quality in two layers <strong>of</strong> bed<br />
plate/cap <strong>of</strong> abutment and piers as per<br />
standard specification and direction <strong>of</strong><br />
E/I. Sqm 13.20<br />
13. making with raised 25 mm cement plaster<br />
(1:4) numbering culverts and bridges and<br />
for working load clarification at end <strong>of</strong><br />
parapets including cost numbering and<br />
painting as per M.O.S.T. specification and<br />
direction <strong>of</strong> E/I. including cost <strong>of</strong> all<br />
labour materials, royalty and taxes etc. all<br />
complete job. Nos. 4.00<br />
14. Painting posts with two loats <strong>of</strong> en<strong>ame</strong>l<br />
paints <strong>of</strong> approved shade and make after<br />
cleaning the surface thoroughly all<br />
complete job. Sqm 13.78<br />
72<br />
(Rupees Fifty Seven Thousand<br />
Nine Hundred Seventy Six &<br />
paise Thirty Five) only<br />
Rs. 57976.35<br />
(Rupees Seven Hundred<br />
Eighty One & paise<br />
Seventy Five) only<br />
Rs. 781.75<br />
(Rupees One Hundred<br />
Four) only<br />
Rs. 104.00<br />
(Rupees One Hundred<br />
Twenty Two) only<br />
Rs. 122.00<br />
(Rupees One Hundred<br />
Thirty & paise Eighty<br />
five) only<br />
Rs. 130.85<br />
(Rupees Forty Nine &<br />
paise Thirty Five) only<br />
Rs. 49.35
15. Earth <strong>Work</strong> in back filling in foundation<br />
trenches and plinth in layer not exceeding<br />
150 m thick well watered rammed fully<br />
compacted and line dressed with earth<br />
obtained from excavation <strong>of</strong> foundation<br />
trenches with a lead <strong>of</strong> 50 m and lift <strong>of</strong><br />
1.5 m complete as per building<br />
specification and direction <strong>of</strong> E/I. Cum 29.72<br />
73<br />
(Rupees Twenty One &<br />
paise Sixty) only<br />
Rs. 21.60<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GEERAL AD SPECIAL CODITIO FOR THE COTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the Road Bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />
claim in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
74
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
75
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
76
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rduhdh rduhdh inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />
tk,xhA<br />
¼x½ fufonk vkea=.k lwpuk es izdkf'kr izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk; vfHk;Urk vfHk; Urk Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk AA<br />
A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
77
fufonk fufonk dh dh ’krsZ<br />
’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
78
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
80<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GOVERNMENT OF JHARKHAND<br />
ROAD CONSTRUCTION DEPARTMENT<br />
Bill <strong>of</strong> Quantity<br />
Group - 07<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size<br />
1.50 X 1.00 m in 3 rd km <strong>of</strong> Rajauli-<br />
Chandwara-Barhi Road for the year 11-12<br />
Estimated cost : Rs. 5,98,924/-<br />
Cost <strong>of</strong> B.O.Q. : Rs. 1,250/-<br />
Earnest Money : Rs. 12,000/-<br />
Time <strong>of</strong> Completion : Three Months<br />
OFFICE OFFICE OFFICE OF OF OF THE THE THE EXECUTIVE EXECUTIVE EXECUTIVE ENGINEER<br />
ENGINEER<br />
ENGINEER<br />
R.C.D., R.C.D., R.C.D., ROAD ROAD ROAD DIVISION<br />
DIVISION<br />
DIVISION<br />
KODERMA.<br />
KODERMA.<br />
KODERMA.<br />
81
OFFICE OF THE EXECUTIVE EGIEER<br />
ROAD COSTRUCTIO DEPARTMET<br />
ROAD DIVISIO, KODERMA<br />
OTICE IVITIG TEDERS<br />
1. Sealed tenders on approved from a bill <strong>of</strong> quantity available from the <strong>of</strong>fice <strong>of</strong> the Chief Engineer(comm.)<br />
Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh / Undersigned on the payment <strong>of</strong> Rs<br />
1250/- by Bank Draft are invited from the registered P.W.D contractors to be eventually drawn in P.W.D Form<br />
No. – F2 will be received up to 3 P.M on 14-10-2011 by the Chief Engineer (comm.) Ranchi / S.E Road circle<br />
Hazaribagh/undersigned For the work <strong>of</strong> Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in 3 rd km<br />
<strong>of</strong> Rajauli-Chandwara-Barhi Road in R.C.D., Road Division Koderma For Year 2011-12 and will be opened in<br />
the presence <strong>of</strong> the Contractors or their authorized agents on 14-10-2011 at 3.30 P.M by the respective <strong>of</strong>ficer in<br />
their <strong>of</strong>fice.<br />
2. Estimated amount <strong>of</strong> the work is Rs . 5,98,924/-<br />
3. Tenderers would state the period within which can complete the work from the date receipt <strong>of</strong> written orders to<br />
commence the work.<br />
4. Tenders are required to deposit earnest money amounting to Rs 12,000/- for the work.<br />
Earnest money is to be deposited in Post-Office N.S.C (eight issue) issued by Jharkhand Post-Office duly pledged<br />
to the undersigned original copy <strong>of</strong> which is to be submitted with the tender deposit <strong>of</strong> earnest money in the form<br />
<strong>of</strong> insurance guarantee bond or by cheque or draft is not acceptable. Inadequate earnest money will tender the<br />
tender invalid and such the tender will be rejected.<br />
5. Specification, design drawing and other documents required in connection with the work can be seen in the<br />
<strong>of</strong>fice <strong>of</strong> the undersigned during the working hours and the day and the contractors may obtained a set <strong>of</strong><br />
document relating to tender paper on payment <strong>of</strong><br />
(i) Rs 50/- for the work up to Rs 10,000/-<br />
(ii) Rs 250/- for the work above Rs 10,000/- and up to Rs 50,000.<br />
(iii) Rs 500/- for the work above Rs 50,000/- and up to Rs 2,50,000.<br />
(iv) Rs 750/- for the work above Rs 2.50 lacks and up to Rs 5.00 lacs.<br />
(v) Rs 1250/- for the work above Rs 5.00 lacks and up to Rs 10.00 lacs.<br />
(vi) Rs 2500/- for the work above Rs 10.00 lacks and up to Rs 15.00 lacs.<br />
(vii) Rs 5,000/- for the work Rs 15.00 lacks and up to Rs 50.00 lacs.<br />
(viii) Rs 10,000/- for the work Rs above Rs 50.00 lacs.<br />
Tender will be accepted on the prescribed tender paper which will be available for sale during working hours at<br />
<strong>of</strong>fice <strong>of</strong> the Chief Engineer (comm.) Chotanagpur wing-Ranchi/ Superintending Engineer Road circle Hazaribagh<br />
/ Undersigned on from 12-10-2011 to 13-10-2011<br />
6. Any other information in connection with can be obtained on application be the undersigned.<br />
7. Authority reserves the right to accept or reject any tenders or all <strong>of</strong> the tenders received without assigning any<br />
reason there<strong>of</strong>.<br />
8. Earnest money <strong>of</strong> the successful tender will be forfeited in cause to be declines or avoid to sign the agreement<br />
or contract or evident deposit the security within 10 days <strong>of</strong> being called up to do so after the acceptance <strong>of</strong> his<br />
tender.<br />
9. In the case <strong>of</strong> tenders exempted from depositing earnest money amount equivalent to the earnest money shall be<br />
forfeited from sum due to them or the deposit lying with the department if the declines to sign the agreement or<br />
contract or deposit the security money within the aforesaid time.<br />
82
10. In case <strong>of</strong> tender for lump-sum contract the lump-sum for the tenders <strong>of</strong>fered should be clearly written both in<br />
figure and words.<br />
11. The tenders will have to quote their workable rates in the prescribed blank and dotted space prevailed for<br />
quoting the rates on OVER BILL.<br />
12. The distance <strong>of</strong> quarry or crusher site indicated in the B.O.Q or specific lead mentioned shall the basis <strong>of</strong> rates<br />
for payment in respect <strong>of</strong> lead. Suitable deduction in rates shall be made in if lesser lead involved at any stages<br />
during execution for the work in approved tenders.<br />
13. It will be obligatory for the tenders to keep their after open for acceptance for a period <strong>of</strong> 180 days <strong>of</strong> receipt<br />
<strong>of</strong> tenders.<br />
14. The authority reserve the right to allot the work to any <strong>of</strong> the tenders and also to distribute the s<strong>ame</strong> among<br />
tenders without assigning any reason there<strong>of</strong>.<br />
15. (a) Empty bitumen drums in good condition shall be returned by contractor in go-down failing which rates @<br />
Rs 160 per drum will be recovered from the contractors bill <strong>of</strong> amount due to him in this department check<br />
from approved B.O.Q.<br />
(b) Empty cement bag @ Rs. 3/ bag.<br />
16. The work will have to completed up to Three months from the date <strong>of</strong> issue <strong>of</strong> work order.<br />
17. Vague and amigos tenders are liable for rejection.<br />
18. In case supplying / fitting / fixing <strong>of</strong> Electrometric Bearing for bridge work the Prescribed Test Certificate<br />
from manufacturing firms confirming the M.O.S.T. Standard and specification will be must and supply <strong>of</strong> the<br />
electrometric bearing <strong>of</strong> any other types <strong>of</strong> bearing will have been taken for reputed firms which have all facilities<br />
for testing <strong>of</strong> raw materials for manufacturing <strong>of</strong> bearing and testing the finished bearings.<br />
19. Sales tax will be deducted from contractor’s bill as per Jharkhand Sale Tax Rules.<br />
20. Higher tendered rates will not be applicable in case <strong>of</strong> materials issued by <strong>Department</strong> over issue rates and<br />
mentioned in the tender documents and agreements.<br />
21. The lowest percentage <strong>of</strong> rates beyond, which tender shall not be considered.<br />
A – B x 15 = 15% limit to 15%<br />
A<br />
Where, A = Estimate cost Rs.<br />
B = Cost <strong>of</strong> Govt. Materials Rs.<br />
22. fufonk 'krksZ ds eqrkfcd iSDM fcVqesu ( VG-30 xzsM dh [kjhnnkjh bf.;u vkW;y daiuh fgUnwLrku ;k Hkkjr<br />
isVªksfy;e dkjiksjs'ku ls Loa; djuk gksxk rFkk fcVqesu dh xq.kork dk izek.k i= nsuk gksxk Hkqxrku ls iwoZ bl<br />
dk;Z gsrw fdruk fcVqesu muds }kjk dk;Z fo’ks"k ds fy, izkIr fd;k x;k gS A mlls lEcf/kr izekf.kr fd;k x;k<br />
jlhn laosnd dks lEcf/kr lgk;d vfHk;Urk ds ek/;e ls izLrqr djuk gskxk rFkk fcVqesu dh ek=k dk;ZLFky ij<br />
yk;k x;k gSA mldh ek=k dk lR;kiu izR;sd pkyw foi= ds lkFk lEcf/kr lgk;d vfHk;Urk ls lqfuf’pr djsaxs<br />
rHkh Hkqxrku dh fn’kk esa dk;ZokbZ dh tk,xh A<br />
fufonk vkea=.k lwpuk ds 'kŸkksZa dk ikyu djuk gksxk A<br />
83<br />
Executive Engineer<br />
R.C.D., Road Division, Kodarma.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in<br />
3 rd km <strong>of</strong> Rajauli-Chandwara-Barhi Road for the year<br />
Sl.<br />
o.<br />
2011-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Dismantling <strong>of</strong> existing structures like<br />
culverts, bridges, retaining walls and<br />
other structure comprising <strong>of</strong><br />
masonry, cement concrete, wood<br />
work, steel work, including T&P and<br />
scaffolding wherever necessary,<br />
shorting the dismantled material,<br />
disposal <strong>of</strong> unserviceable material and<br />
stacking the serviceable material with<br />
all lifts and lead <strong>of</strong> 1000 metres<br />
(a) Brick <strong>Work</strong><br />
(b) R.C.C. slab<br />
84<br />
Cum<br />
Cum<br />
2. E/W in excavation <strong>of</strong> foundn.<br />
Trenches for bridges with all<br />
materials, labour, tools, and plants,<br />
leveling and ramming the foundation<br />
beds, dressing the sides, removing<br />
roots, logs, shrubs and other loose and<br />
deleterious materials likely to<br />
deteriorate, adequate provision against<br />
erosion, water pollution and drainage<br />
to keep the site free <strong>of</strong> water, stacking<br />
the excavated soil clear from the edge<br />
<strong>of</strong> excavation, providing light, barrier,<br />
danger signals, choukidar, making and<br />
maintaining diversion, traffic<br />
regulation all complete job as per<br />
design/drawing and technical<br />
specification and MORT&H<br />
specification clause 304 and other<br />
relevant clauses and direction <strong>of</strong> E/I<br />
(Excluding cost <strong>of</strong> dewatering and<br />
shoring)<br />
(i) Ordinary Soil Cum<br />
27.90<br />
6.187<br />
102.752<br />
(Rupees One Hundred<br />
Fifty Five & paise Twenty<br />
Five) only<br />
Rs. 155.25<br />
(Rupees Five Hundred<br />
Fifty Eight& paise Fifty<br />
Five) only<br />
Rs. 558.55<br />
(Rupees Forty One &<br />
paise Fifteen) only<br />
Rs. 41.15
3. Providing P.C.C./R.C.C. M-150 with<br />
nominal mix (1:2:4) with approved<br />
quality <strong>of</strong> stone chips 20 mm to 6 mm<br />
size and clean coarse sand <strong>of</strong> 2.5 to<br />
3.5 F.M. in foundation and plinth<br />
including mixing cement concrete in<br />
mixer, Screening royalty and all taxes<br />
with hire charges <strong>of</strong> machinery all<br />
complete with cost all labour and<br />
materials as per MOST specification<br />
and direction <strong>of</strong> E/I. Cum 31.00<br />
4. Providing random rubble stone<br />
masonry in C.M. (1:3) in foundation<br />
and plinth with hammer dressed stone<br />
<strong>of</strong> less than 0.03 cum in volume and<br />
clean coarse sand <strong>of</strong> F.M. 2 to 2.5<br />
including cost <strong>of</strong> screening-raking out<br />
joints to 20 mm depth curing taxes<br />
and royalty all complete as per<br />
building specification and direction <strong>of</strong><br />
E/I. Cum 50.928<br />
5. Providing random rubble stone<br />
masonry in C.M. (1:3) in super<br />
Structure with hammer dressed stone<br />
<strong>of</strong> less than 0.03 cum in volume and<br />
clean coarse sand <strong>of</strong> F.M. 2 to 2.5<br />
including cost <strong>of</strong> screening-raking out<br />
joints to 20 mm depth curing taxes<br />
and royalty all complete as per<br />
building specification and direction <strong>of</strong><br />
E/I. Cum 58.49<br />
6. Providing PCC/RCC M-200 with<br />
nominal mix (1:1.5:3) with approved<br />
quality <strong>of</strong> stone chips 20 mm to 6 mm<br />
and clean coarse sand in bed plate cap,<br />
approach slabs etc. Cum 6.60<br />
7. Providing PCC/RCC M-300 with<br />
nominal mix (1:1:2) in deck slab do-<br />
as- do as per MOST specification <strong>of</strong><br />
E/I excluding cost <strong>of</strong> reinforcement<br />
and its bending placing in position. Cum 6.93<br />
8. Providing PCC/RCC M-300 with<br />
nominal mix (1:1:2) in wearing coat<br />
<strong>of</strong> deck slab with stone chips 20 mm<br />
to 6 mm size (2 part 20 mm to 10 mm<br />
85<br />
(Rupees Four Thousand<br />
One Hundred Ninety &<br />
paise Sixty Two) only<br />
Rs. 4190.62<br />
(Rupees Two Thousand<br />
Two Hundred Sixty &<br />
paise Sixty Seven) only<br />
Rs. 2260.67<br />
(Rupees Two Thousand<br />
Three Hundred Twenty<br />
Eight & paise Fifty<br />
Seven) only<br />
Rs. 2328.57<br />
(Rupees Four Thousand<br />
Eight Hundred Sixty Nine<br />
& paise Eighty Seven)<br />
only<br />
Rs. 4869.87<br />
(Rupees Six Thousand<br />
Two Hundred Eighty One<br />
& paise Five) only<br />
Rs. 6281.05
and one part 10 mm to 6 mm) and<br />
clean coarse sand <strong>of</strong> F.M. 2.0 to 3.5<br />
including mixing in concrete mixture<br />
and vibrating but excluding cost <strong>of</strong><br />
reinforcement bending & binding<br />
excluding all cost <strong>of</strong> material and<br />
labour all complete as per<br />
specification <strong>of</strong> M.O.S.T.and direction<br />
<strong>of</strong> E/I.<br />
9. Supplying, fitting and placing HYSD<br />
bar reinforcement in sub-structure<br />
complete as per drawing and technical<br />
specification<br />
10. Providing filter media with stone<br />
metal grade-III conforming to<br />
MORT&H Table 400-7, free from<br />
grass, dirt and debris and other loose<br />
and deleterious materials likely to<br />
deteriorate, providing light, barrier,<br />
danger signals, choukidar, making and<br />
maintaining diversion, traffic<br />
regulation incidental charges, all taxes<br />
and royalty etc. all technical<br />
specification and MORT&H<br />
specification clause 305 and other<br />
86<br />
Cum<br />
1.89<br />
M.T. 1.375<br />
relevant clauses and direction <strong>of</strong> E/I. Cum 11.16<br />
11. Providing weep holes in Brick<br />
masonry/Plan/Reinforced concrete<br />
abutment, wing wall/return wall with<br />
100 mm dia AC pipe extending<br />
through the full width <strong>of</strong> the structure<br />
with slope <strong>of</strong> 1V:20H towards<br />
drawing foce. Complete as per<br />
drawing and Technical specifications. Nos. 30.00<br />
12. Providing fitting and fixing tar paper<br />
<strong>of</strong> approved quality in two layers <strong>of</strong><br />
bed plate/cap <strong>of</strong> abutment and piers as<br />
per standard specification and<br />
direction <strong>of</strong> E/I. Sqm 13.20<br />
13. making with raised 25 mm cement<br />
plaster (1:4) numbering culverts and<br />
bridges and for working load<br />
clarification at end <strong>of</strong> parapets Nos. 4.00<br />
(Rupees Four Thousand<br />
Nine Hundred Sixty Eight<br />
& paise Twenty Five)<br />
only<br />
Rs. 4968.25<br />
(Rupees Fifty Seven<br />
Thousand Nine Hundred<br />
Twenty One & paise<br />
Ninety Four) only<br />
Rs. 57921.94<br />
(Rupees Eight Hundred<br />
Seventy Three & paise<br />
Seven) only<br />
Rs. 873.07<br />
(Rupees One Hundred<br />
Four) only<br />
Rs. 104.00<br />
(Rupees One Hundred<br />
Twenty Two) only<br />
Rs. 122.00<br />
(Rupees One Hundred<br />
Thirty & paise Eighty<br />
five) only<br />
Rs. 130.85
including cost numbering and painting<br />
as per M.O.S.T. specification and<br />
direction <strong>of</strong> E/I. including cost <strong>of</strong> all<br />
labour materials, royalty and taxes etc.<br />
all complete job.<br />
14. Painting posts with two loats <strong>of</strong><br />
en<strong>ame</strong>l paints <strong>of</strong> approved shade and<br />
make after cleaning the surface<br />
thoroughly all complete job. Sqm 8.46<br />
15. Earth <strong>Work</strong> in back filling in<br />
foundation trenches and plinth in layer<br />
not exceeding 150 m thick well<br />
watered rammed fully compacted and<br />
line dressed with earth obtained from<br />
excavation <strong>of</strong> foundation trenches<br />
with a lead <strong>of</strong> 50 m and lift <strong>of</strong> 1.5 m<br />
complete as per building specification<br />
and direction <strong>of</strong> E/I. Cum 17.12<br />
16. Providing P.C.C./R.C.C. M-10 with<br />
nominal mix (1:3:6) in foundation <strong>of</strong><br />
various component <strong>of</strong> culvert and<br />
bridge with approved quality <strong>of</strong> stone<br />
metal grade- iv (20mm to 37 mm size)<br />
and clean coarse sand <strong>of</strong> F.M. 2.5 to 3<br />
including screening mixing cement<br />
concrete in mixer, and placing and in<br />
position vibrating screening curing<br />
taxes and royalty including the cost <strong>of</strong><br />
all materials and labour complete job<br />
as per approved design/drawing and<br />
relevant clause M.O.S.T. specification<br />
and direction <strong>of</strong> E/I. including cost <strong>of</strong><br />
machine but excluding the cost <strong>of</strong><br />
shuttering. Cum 7.77<br />
87<br />
(Rupees Forty Nine &<br />
paise Thirty Five) only<br />
Rs. 49.35<br />
(Rupees Twenty One &<br />
paise Sixty) only<br />
Rs. 21.60<br />
(Rupees Three Thousand<br />
Two hundred Forty One<br />
& paise Seventeen) only<br />
Rs. 3241.17<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma
GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />
1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />
and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />
2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />
3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />
practice or M.T specification for the Road Bridge and building work shall be adopted.<br />
4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />
value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />
decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />
s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />
5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />
stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />
the rates double the rates mentioned above.<br />
6. o claimed shall be entertained for :-<br />
(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />
(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />
(c) Any loss due to natural calamity.<br />
(d) Due to any act <strong>of</strong> enemies.<br />
(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />
department/Govt.<br />
7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />
contractor and no claim shall entertained in this amount.<br />
8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />
under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />
department.<br />
9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />
approved by the Engineer-in-Charge before collection and use.<br />
10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />
called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />
department for use as contains if available which shall have to be returned to department in good condition<br />
after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />
11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />
strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />
12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />
(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />
(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />
and specification conducted by the department or any other will be borne by the contractor.<br />
13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />
claim on this account be entertained.<br />
14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />
contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />
from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />
will have to manage necessary equipment and mixer etc. at his own cost.<br />
15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />
16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />
bear the cost <strong>of</strong> compensation etc.<br />
17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />
claim in this account will be entertain.<br />
18. No claim making said godown by the contractor’s will be entertained.<br />
19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />
20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />
be treated time bar.<br />
88
21. The tender should acquaint himself with the nature <strong>of</strong> works lead <strong>of</strong> contract materials involved in<br />
finished item <strong>of</strong> work.<br />
22. The contractor should give his full address and n<strong>ame</strong>.<br />
23. The case <strong>of</strong> supply <strong>of</strong> departmental materials such as cement, steel, bitumen etc.contractor will keep a proper<br />
account <strong>of</strong> stores received by him from department. This will always remain the property <strong>of</strong> Government.<br />
He should also tender any time account <strong>of</strong> site materials received and actually used in the work. The P.W.D<br />
<strong>of</strong>ficer have to verify and reject the materials received for the department on the basis <strong>of</strong> actual requirement<br />
the cost <strong>of</strong> recovered at penal rate which will be carefully unable to improper misuse <strong>of</strong> scarce material.<br />
24. The contractor will make own agreement for night guard etc. and the tender rate should be inclusive <strong>of</strong> rate.<br />
25. All materials to be supplied by the contractors for the work should be got appropriate in writing by the E/I.<br />
prior to use in work immediately after rejection otherwise department may remove for the site.<br />
26. All wood work should be get approved and passed by the E/I in writing up in position and polished,<br />
varnished or painting as the case may be.<br />
27. All facilities for stocking <strong>of</strong> works and bills will be approved by the contractors.<br />
28. After completion <strong>of</strong> works contractor will remove all debris at his cost and fill up the vats and leave the site<br />
clean.<br />
29. Contractor should maintain the SITE ORDER BOOK at the site or work notice instruction concerning the<br />
site order book will be property <strong>of</strong> the department after completion <strong>of</strong> work and will remaining the<br />
departmental custody.<br />
30. The contractor will be held responsible for any site accident due to mismanagement <strong>of</strong> the contractor and<br />
liable to pay any damage for such accident.<br />
31. In case <strong>of</strong> any failure <strong>of</strong> this contract supply <strong>of</strong> materials or stores on application <strong>of</strong> the contract within 60<br />
days, the date <strong>of</strong> such failure or delay such extension <strong>of</strong> time shall appear to the Executive Engineer to be<br />
responsible in accountancy with the circumstances <strong>of</strong> the case can be however allowed.<br />
32. In decision <strong>of</strong> the extension <strong>of</strong> time shall be given by the competent authority and be accepted at finally<br />
by the contractor.<br />
33. The physical property <strong>of</strong> road materials should satisfy the test as per requirement given in M.O.S.T <strong>of</strong> the<br />
classification or as given in this note sheet.<br />
34. (i) In case <strong>of</strong> the rate <strong>of</strong> tender is accepted above the B.O.Q. rate by the competent authority, the enhanced<br />
% <strong>of</strong> rate shall not be applicable over the cost <strong>of</strong> bitumen.<br />
(ii) In case <strong>of</strong> rate quoted by the Agency is less than the B.O.Q. rate then the less% <strong>of</strong> rate shall be<br />
applicable on the cost <strong>of</strong> bitumen also.<br />
35. The Price escalation / deduction on account <strong>of</strong> change in price <strong>of</strong> bitumen will be admissible as per RCD’s<br />
8182(S) dated 12/11/2008 (for non plan works)<br />
Tenderer’s Signature Executive Engineer<br />
R.C.D, Road Division<br />
KODERMA<br />
89
COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
90
OTIFICATIO OF CLAUSE -18<br />
(a) Wages means whether for time or price work notified at the time <strong>of</strong> inviting tenders for the work and here<br />
such wage have not notified the wages prescribed by the Central <strong>Public</strong> <strong>Work</strong> <strong>Department</strong> for the district<br />
in which the work is done.<br />
(b) The contractor shall not with standing the provision <strong>of</strong> any contradictory clause to be paid fair wages to<br />
labourers indirectly engaged on the work including any labour engaged by his sub connection with the said<br />
works if the labourers had been immediately employed by him.<br />
(c) The Executive Engineer or Assistant Engineer I/C Sub Divisional Officer concerned shall have right to<br />
conduct the money due to contractor any requirement or estimated to be required for making the loss<br />
suffered by a worker or workers by reason <strong>of</strong> non fulfillment <strong>of</strong> the conditions <strong>of</strong> the contract for the<br />
benefit <strong>of</strong> the workers or payment wages <strong>of</strong> deducting made from his or their wages which are not<br />
justified the terms <strong>of</strong> contract.<br />
(d) The regulations aforesaid shall deemed to be required into decide any complaint that the wages paid by<br />
the contractor to and labour for the work done by such in labour in less than the paid for similar work in<br />
neighborhood.<br />
(e) The Officer in charge <strong>of</strong> the work shall have the right to decide whether any labourers employed by<br />
contractor is below the age <strong>of</strong> fourteen years and to refuse to be employed by the contractor.<br />
¼d½ ¼d½ ,djkjukek ,djkjukek dk dk 27okW 27okW Dykmt Dykmt ds ds vuqlkj vuqlkj dk;ZLFky dk;ZLFky ij ij rd rduhdh rd uhdh inkf/kdkfj;ksa inkf/kdkfj;ksa inkf/kdkfj;ksa dks dks dks j[kkuk j[kkuk iMsxkA<br />
iMsxkA<br />
¼[k½ ¼[k½ ;fn ;fn fuekZ.k fuekZ.k lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ de de nwjh nwjh ls ls gksrh gksrh gS gS rnuqlkj rnuqlkj njks njks es es dVkSrh dVkSrh dj dj yh yh tk,xhA<br />
tk,xhA<br />
¼x½ fufonk vkea=.k lwpuk es es izdkf'kr lHkh ca/kusa ca/kusa ekU; jgsaxsA<br />
Dykmt&27&laosnd Dykmt&27&laosnd =qfViq.kZ =qfViq.kZ lkefxz;ks lkefxz;ks dh dh vkiwfrZ vkiwfrZ ,oa ,oa O;ogkj O<br />
;ogkj ds ds fy, fy, iq.kZr;k iq.kZr;k nks"kh nks"kh ekus ekus tk,axs<br />
tk,axs<br />
rFkk rFkk xzsM xzsM & & 3 3 laosnd laosnd 10 10 yk[k yk[k ds ds mij mij ds ds dk;Z dk;Z ds ds laosndks laosndks ftUgs ftUgs viuk viuk duh; duh; vfHk;Urk@lgk;d<br />
vfHk;Urk@lgk;d<br />
vfHk;Urk vfHk;Urk j[kkuk j[kkuk vko';d vko';d gS] gS] muds muds lnk lnk j[k j[k j[kko j[kko dk;Z dk;Z fd;s fd;s tkus tkus ij ij muds muds lacfU/kr lacfU/kr duh;<br />
duh;<br />
vfHk;Urk vfHk;Urk ,oa ,oa lgk;d lgk;d vfHk;Urk vfHk;Urk dks dks dks nks"kh nks"kh ekuk ekuk tk;sxk tk;sxk A<br />
Contractor Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
91
fufonk fufonk dh dh ’krsZ<br />
’krsZ<br />
¼1½ os gh laosnd bl fufonk esa Hkkx ys ldrs gSa] tks iFk fuekZ.k foHkkx] >kj[k.M ljdkj ds leqfpr Js.kh esa<br />
fucaf/kr gSaA ,oa v~|ru uohd`r gksuk vfuok;Z gS<br />
¼2½ ifjek.k foi= ds Ø; gsrq fuEufyf[kr 'kŸkksZ dks iwjk djuk gksxk &<br />
¼d½ vkosnu i= ds lkFk v|ru vk;dj lQk;k çek.k i=] okf.kT; dj lQk;k çek.k i=] Je fuca/ku ,oa<br />
LoPN pfj= çek.k i= ,oa iFk fuekZ.k foHkkx] >kj[k.M ds leqfpr Js.kh esa fuca/ku dh vfHkçekf.kr çfr layXu<br />
djuk vfuok;Z gksxkA<br />
¼[k½ ifjek.k foi= ds vkosnu ds lkFk ifjek.k foi= dk ewY; ¼tks ykSVk;k ugha tk;sxk½ cSad MªkV ds :i esa ekU;<br />
gksxh] tks fd dk;Zikyd vfHk;ark] iFk fuekZ.k foHkkx] iFk çe.My dksMjek ds inuke ls Hkkjrh; LVsV cSad vkWQ<br />
bafM;k] dksMjek esa Hkqxrs; gksxkA<br />
¼3½ fufonknkrk }kjk vxz/ku dh jkf’k fufonk vfHkys[k ds lkFk 8@6 o"khZ; jk"Vªh; cpr i= ¼vkBok¡ fuxZe½ 3@5<br />
o"khZ; Mkd?kj lk<strong>of</strong>/k tek tks >kj[k.M ds fdlh Hkh Mkd?kj ls fuxZr gks ;k vuqlwfpr cSadks ds fMiksftV ,V<br />
dkWy fjlhV ¼cSad xkjaVh ½ tks fufonk çkfIr dh frfFk ls 240 fnuksa rd oS) gksxk :i esa dk;Zikyd vfHk;ark] iFk<br />
fuekZ.k foHkkx] iFk ize.My] dksMjek ds inuke ls çfrfKr ¼IysTM½ djkdj layXu djuk vfuok;Z gksxkA<br />
¼4½ bl fufonk ds laca/k esa foLr`r tkudkjh ds fy, fdlh Hkh dk;Z fnol esa v/kksgLrk{kjh ds dk;kZy; esa<br />
laidZ fd;k tk ldrk gS rFkk lwpukiV ij ns[kk tk ldrk gSA<br />
¼5½ vkoaVu miyC/k jgus ij gh foi= dk Hkqxrku fd;k tk;sxkA blds fy, fdlh çdkj dk ncko ;k nkok<br />
ekU; ugha gksxkA<br />
¼6½ l’kŸkZ fufonk ij fopkj ugha fd;k tk;sxkA<br />
¼7½ fufonk ,oa vU; ’kŸksZa fufonk i= ds lkFk layXu jgsaxh tks fufonknkrkvksa dks ekU; gksxkA<br />
¼8½ laosnd dks fufonk ds lkFk dk;Z dk le;c) dk;ZØe lefiZr djuk vko’;d gksxkA<br />
¼9½ laosnd dks iSDM fcVqesu VG-30 xzsM dh [kjhn ekU;rk izkIr Hkkjr ljdkj miØe ls Lo;a djuh gksxh<br />
rFkk fcVqesu dh xq.koÙkk [kjhn izek.k i= Ø; jlhn nsuk gksxkA [kkyh fcVqesu Mªe çe.Myh; xksnke esa tek djus<br />
ds ckn gh muds }kjk dk;Z esa yxk;s x;s fcVqesu dk Hkqxrku fd;k tk;sxkA fcVqesu çkfIr djus ds nks fnuksa ds<br />
vanj çfIr jlhn çe.Myh; dk;kZy; esa tek djuk vfuok;Z gSA cVqesu dh dher esa o`f) @gzkl dh ifjfLFkfr esa<br />
izfriwfrZ jkf'k dk Hkqxrku iFk fuekZ.k foHkkx] >kj[k.M ljdkj dh vf?klwpuk la[;k 7182¼,l½ fnukad 12-11-2008<br />
ds vkyksd esa dh tk;xh A<br />
(10) fufonk vfHkys[k ds dzekad 5 ij vafdr dk;kZy;ksa ls dk;kZy; v<strong>of</strong>/k esa mi;qDr cSad M~zkQ~V lefiZr dj izkIr fd;s tk<br />
ldrs gSa vFkok >kj[k.M ljdkj ds osclkbV (1) www.jharkhand.gov.in ls MkmuyksM fd;s tk ldrs gSaA fufonk<br />
vfHkys[k] osclkbV ls izkIr djus dh fLFkfr esa fufonk ds lkFk fufonk vfHkys[k esa vafdr ewY; tek djuk vfuok;Z<br />
gksxk vU;Fkk fufonk dks vekU; ( in valid) ekuk tk,xkA lkFk gh ;fn MkmuyksM fd;s x;s fufonk izi= esa dksbZ<br />
tksM+@cnyko fd;k x;k rks oSls fufonk dks Hkh vekU; ( in valid) ekuk tk,xkA<br />
¼11½ dk;Z esa yxkus okys fuekZ.k laca/kh lHkh lkekxzh vkfn laosnd dks Lo;a O;oLFkk djuk gksxkA foHkkx dksbZ Hkh<br />
lkexzh ;k midj.k miyC/k ugha djk,xkA<br />
¼12½ fufonk fu"iknu ds ,d lIrkg ds vanj ,djkjukek djuk vfuok;Z gksxkA<br />
¼13½ fcuk dkj.k crk;s fdlh ;k lHkh fufonkvksa dks LFkfxr ;k jnn~ djus dk vf/kdkj foHkkx dks lqjf{kr gksxkA<br />
92
¼14½ fufonkdkj ftl dk;Z ds fy, fufonk ns jgs gSa os Lo;a LFkkuh; fLFkfr ns[k ysa vkSj lgh fLFkfr ls larq"V gksus ds<br />
ckn gh fufonk esa nj vafdr djsa] vU;Fkk dksbZ nkok ekU; ugha gksxkA<br />
¼15½ le; o`f) fdlh Hkh ifjfLFkfr esa ekU; ugha gksxkA<br />
¼16½ laosnd =qfViw.kZ lkekfxz;ksa dh vkiwfrZ ,oa O;ogkj ds fy, iw.kZr;k nks"kh ekus tk;saxsA<br />
¼17½ çkDdyu dh jkf’k ?kV&c
RATES TO BE QUOTED BY TEDERER<br />
[Stuck out those two <strong>of</strong> Sl. o. (a), (b) and (c) below not applicable]<br />
(a) My over all rates for the item for the whole work will be equal the rates mentioned enclosed<br />
B.O.Q. quote i.e On Schedule Rates.<br />
(b) My over all rates for all item for the whole work will ………...% (in figures)<br />
……………………………………. percent (in words) ABOVE than the rates quoted in the<br />
B.O.Q.<br />
or<br />
(c) My over all rates for all item for the whole work will be ………..% (in figures)<br />
…………………………………… percent (in words) BELOW than the rates mentioned in<br />
the enclosed B.O.Q.<br />
Details :- Signature <strong>of</strong> Contractor<br />
1. N<strong>ame</strong> <strong>of</strong> Tenderer :-<br />
2. Registration No. :-<br />
3. Time <strong>of</strong> Completion :-<br />
4. I.T Clearance Certificate :-<br />
5. Sales Tax Clearance Certificate :-<br />
6. Earnest Money Deposited with the Tender :-<br />
7. Lab our License No. Year Valid up to<br />
8. Character Certificate granted by the authority Valid up to<br />
(To be filled by the department)<br />
94<br />
Signature <strong>of</strong> Contractor<br />
B.O.Q issued to contractor Sri / M/s ………………………………………………………………...<br />
Address ……………………………………………………………………………………………...<br />
……………………………………………………………………………………………...<br />
Registration No.<br />
Cost deposited vide money receipt no. For Rupees<br />
Signature <strong>of</strong> Issuing Officer Signature <strong>of</strong> Head Officer<br />
Executive Engineer<br />
R.C.D, Road Division, Koderma