16.08.2013 Views

ame of Work - Information & Public Relations Department

ame of Work - Information & Public Relations Department

ame of Work - Information & Public Relations Department

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(b) In km 49(P)<br />

3. Construction <strong>of</strong> sub-grade and earthen shoulder<br />

with approved material obtained from borrow pits<br />

or any other sources free from logs, stamps, roots,<br />

rubbish or any other ingredients likely to<br />

deteriorate or effect the stability <strong>of</strong> the<br />

embankment including breaking with all leads and<br />

lifts including breaking the clods to maximum to<br />

60 mm cube, placing the earth in layer not<br />

exceeding 225 mm in loose thickness, rough<br />

dressed including cost <strong>of</strong> cutting and removing<br />

shrubs and roots falling in borrow areas all<br />

complete job as per approved design, specification<br />

and direction <strong>of</strong> E/I (Table No. 300-2).<br />

(a) In km 1(P), 2(P), 5(P)<br />

(b) In km 49(P)<br />

4. Providing stone metal grade –ii (63 mm to 45 mm<br />

size) M.O.S.T. specification including hand<br />

packing consolidation with approved quality <strong>of</strong><br />

screening materials mooram having P.I. value not<br />

more than 6 @ 23% loose quantity <strong>of</strong> stone metal<br />

in proper grade camber or super elevation (laid<br />

loose thickness to be 1.33 times the prescribed<br />

compacted thickness <strong>of</strong> stone metals) dry and wet<br />

rolling with power road roller making and<br />

maintaining diversion including cost <strong>of</strong> labour and<br />

materials such as stone metals and mooram all<br />

taxes, royalty and etc. also including cost <strong>of</strong> P.O.I<br />

and all other lubricants and also hire charges <strong>of</strong><br />

road roller without depreciation and major repair<br />

and carriage <strong>of</strong> materials and water with all leads<br />

and complete job as per direction <strong>of</strong> E/I.<br />

(a) In km 1(P), 2(P), 5(P)<br />

16<br />

cum<br />

(b) 68.75<br />

(a) 350.00<br />

(a) 70.00<br />

cum 28.28<br />

5. Providing stone metal grade –iii (53.2 mm to 22.4<br />

mm size) confirming M.O.S.T. specification<br />

including hand packing consolidation with 33.01 982.38<br />

(Rupees<br />

Four Thousand<br />

Four Hundred<br />

Fifteen & paise<br />

Twenty) only<br />

Rs. 4415.20<br />

(Rupees One<br />

Hundred Seventy<br />

One) only<br />

Rs. 171.00<br />

(Rupees One<br />

Hundred Seventy<br />

One) only<br />

Rs. 171.00<br />

(Rupees Nine<br />

Hundred Twenty<br />

Nine & paise<br />

Thirty Eight) only<br />

Rs. 929.38<br />

(Rupees Nine<br />

Hundred Eighty<br />

Two & paise

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!