OFFICE OF THE EXECUTIVE ENGINEER<br />

ROAD CONSTRUCTION DEPARTMENT,<br />

ROAD DIVISION, DEOGHAR.<br />

-----------------------------------------------------------------------------------------<br />

EMERGENT NOTICE INVITING QUOTATION. NO. -03/2010-11<br />

NATIONAL COMPETITIVE QUOTATION<br />

1. Name <strong>of</strong> <strong>the</strong> Office <strong>of</strong> <strong>the</strong> Quotation Invitor :- Executive Engineer, Road Division, Deoghar.<br />

2. Time & Date <strong>of</strong> receiving quotation :- On or before 3.00 P.M. on dated. 13.09.2010.<br />

3. Time & Date <strong>of</strong> opening quotation :- At 3.30 P.M. on dated. 13.09.2010.<br />

4. Place <strong>of</strong> receiving & opening <strong>of</strong> quotation in <strong>the</strong> following <strong><strong>of</strong>fice</strong>s :-<br />

i). Office <strong>of</strong> <strong>the</strong> Chief Engineer (communication) Road Construction Department , Jharkhand,<br />

C.M.P.D.I. Campus, Kanke <strong>road</strong> Ranchi – 834008.<br />

ii). Office <strong>of</strong> <strong>the</strong> Superintending Engineer R.C.D., Road Circle, Dumka.<br />

iii). Office <strong>of</strong> <strong>the</strong> Executive Engineer, R.C.D., Road division, Deoghar – 814112.<br />

(at town police station, Deoghar).<br />

5. Road Construction Department, Government <strong>of</strong> Jharkhand sealed quotation invites from<br />

expert in deflection and load bearing Capacity test <strong>of</strong> pier &deck slab. R.C.C bridge for <strong>the</strong><br />

Deflection & Load bearing capacity test report for <strong>the</strong> following R.C.C. Bridge seaparately.<br />

Detailed as below :-<br />

Sl.<br />

Name <strong>of</strong> Work Earnest<br />

No.<br />

money<br />

1 i). Deflection & load bearing capacity test report <strong>of</strong> R.C.C. deck slab with<br />

analystical experties advice <strong>of</strong> <strong>the</strong> remedial recommendation for class AA(5.5m<br />

to 7.5m carriage width). <strong>of</strong> high level bridge over Patro river in Km 20 th <strong>of</strong><br />

Deoghar (Roushanmore) to Madhupur via Saftarghat Road.No. <strong>of</strong> deck slab – 8<br />

nos.<br />

ii). Load bearing capacity test report <strong>of</strong> R.C.C pier over raft foundation with<br />

analystical experties advice <strong>of</strong> <strong>the</strong> remedial recommendation for class AA. <strong>of</strong><br />

high level bridge over Patro river in Km 20 th <strong>of</strong> Deoghar (Roushanmore) to<br />

Madhupur via Saftarghat Road.<br />

No. <strong>of</strong> R.C.C pier over raft foundation – 19 nos. (32 nd to 50 th @ 2% <strong>of</strong> <strong>the</strong><br />

quoted<br />

amount.<br />

pier)<br />

2 Deflection & load bearing capacity test report <strong>of</strong> R.C.C deck slab with<br />

analystical experties advice <strong>of</strong> <strong>the</strong> remedial recommendation for class 70R <strong>of</strong><br />

high level bridge in Km 18 th (one no.) & Km 35th (two nos.) <strong>of</strong> Deoghar to<br />

Sarath Road.<br />

i). 18 th KM- R.C.C deck slab (14.5m span) for class 70R wheel loading – 1no.<br />

span<br />

ii). 35 th Km – R.C.C. deck slab (20.3m span) for class 70R wheel loading –<br />

3nos. span.<br />

iii). 35 th Km- R.C.C. deck slab (23.02m span) for class 70R wheel loading -<br />

3nos. span.<br />

3 Deflection & load bearing capacity test report <strong>of</strong> R.C.C deck slab with<br />

analystical experties advice <strong>of</strong> <strong>the</strong> remedial recommendation for class 70R for<br />

16m length one span high level bridge in Km 35 th <strong>of</strong> Jama - Jamtara <strong>road</strong>.<br />

i). One no. <strong>of</strong> R.C.C deck slab high level bridge 16m class 70R. - one span.<br />

1<br />

@ 2% <strong>of</strong> <strong>the</strong><br />

quoted<br />

amount.<br />

Period <strong>of</strong><br />

Completion<br />

One Month<br />

One Month<br />

@ 2% <strong>of</strong> <strong>the</strong><br />

quoted<br />

amount One Month<br />

Work details and condition <strong>of</strong> quotation will be seen at www. Jharkhand.gov.in. or at<br />

Notice board <strong>of</strong> <strong>the</strong> <strong><strong>of</strong>fice</strong> <strong>of</strong> <strong>the</strong> Executive Engineer R.C.D., Road Division, Deoghar,<br />

Jharkhand.<br />

Executive Engineer<br />

R.C.D., Road Division, Deoghar.


6. CONDITION OF QUOTATION :-<br />

1). Documentary certificate <strong>of</strong> work done experience in deflection and load bearing capacity test report<br />

<strong>of</strong> pier and Deck slab <strong>of</strong> R.C.C Bridge must be attached with his quotation.<br />

2). The quotationer or <strong>the</strong>ir authorised agent whatsoever desire may remain present at <strong>the</strong> time <strong>of</strong> opening<br />

<strong>the</strong> quotation.<br />

3) If <strong>the</strong> <strong><strong>of</strong>fice</strong> happens to be closed on th date <strong>of</strong> receipt <strong>of</strong> <strong>the</strong> quotation as specified, <strong>the</strong> quotations will<br />

be received & open in <strong>the</strong> next working day at <strong>the</strong> same time and venue.<br />

4). The quotationer are required to deposit <strong>the</strong> earnest money amounting to 2% (two percent) <strong>of</strong> <strong>the</strong> total<br />

cost quoted, only in <strong>the</strong> shape <strong>of</strong> [ Bank Guarantee minimum validity period six month for quotationer<br />

o<strong>the</strong>r than state <strong>of</strong> Jharkhand] N.S.C - 8 th issue or 3/5 years post <strong><strong>of</strong>fice</strong> term Deposit pass book ,<br />

pledged in favour <strong>of</strong> <strong>the</strong> Executive Engineer, R.C.D., Road Division, Deoghar.<br />

5. Quotation without requisite amount <strong>of</strong> <strong>the</strong> earnest money in <strong>the</strong> required shape, shall be rejected.<br />

6. Up to date income tax, sale tax clearance certificate Labour licence shall be submitted with <strong>the</strong><br />

quotation.<br />

7. Quotationer whose quotation has been accepted, Deposit <strong>the</strong> balance amount as security money @ 3%<br />

<strong>of</strong> <strong>the</strong> quotated amount and <strong>the</strong>n signed <strong>the</strong> contract document in <strong>the</strong> <strong><strong>of</strong>fice</strong> <strong>of</strong> <strong>the</strong> Executive Engineer,<br />

Road Construction Department, Road Division, Deoghar within seven day o<strong>the</strong>rwise <strong>the</strong> earnest money<br />

deposited by him will be forfeited and acceptance <strong>of</strong> his quotation will be cancelled and work will be<br />

allotted to 2 nd quotationer<br />

8. Preference will be given to those quotationer who is recognized by <strong>the</strong> government.<br />

9. The <strong>department</strong> reserves <strong>the</strong> right to accept or reject any or all <strong>the</strong> quotations received without<br />

assigning any reason <strong>the</strong>re<strong>of</strong>.<br />

10. Admissible Sales tax, income tax and labour surcharge will be deducted from <strong>the</strong> bill at <strong>the</strong> time <strong>of</strong><br />

payment.<br />

11. Ambiguous or conditional quotation are not acceptable and shall be out right rejected.<br />

12. Payment will be made only after submission <strong>of</strong> <strong>the</strong> analystical complete set <strong>of</strong> <strong>the</strong> test report result in<br />

all respect .<br />

13. The quotationer will be responsible for accident etc, if any during <strong>the</strong> period <strong>of</strong> test work and <strong>the</strong><br />

responsibility will not be rest with <strong>the</strong> <strong>department</strong>.<br />

14. The quotationer will be fully responsible to watch and ward <strong>of</strong> <strong>the</strong> machinery equipment and materials<br />

supply by <strong>the</strong>m.<br />

15. Test work must be carried out strictly as per P.W.D./M.O.S.T. specification.<br />

16) Ownership Certificate <strong>of</strong> <strong>the</strong> Testing machineries & equipments must be submitted with <strong>the</strong><br />

quotation.<br />

17). The quotationer shall have to get <strong>the</strong>mselves acquainting with <strong>the</strong> site before submitting quotation.<br />

2<br />

Executive Engineer<br />

R.C.D., Road Division, Deoghar.


Group No-01 NIQ No.-03/2010-11<br />

Load test <strong>of</strong> deck slab and pier <strong>of</strong> R.C.C high level bridge over Patro<br />

river in K.M. 20 th <strong>of</strong> Deoghar (Roshanmore) to Madhupur via Saftar<br />

Ghat <strong>road</strong> for <strong>the</strong> year 2010-11<br />

Sl<br />

No<br />

Item Unit Qty<br />

(in<br />

1 Deflection and load bearing capacity test report <strong>of</strong> R.C.C deck<br />

slab with analystical experties advice <strong>of</strong> <strong>the</strong> remedial<br />

recommendation for class AA(5.5m to 7.5m carriage width)<br />

including loading and unloading arrangement <strong>of</strong> machinery and<br />

materials at site. Handling <strong>of</strong> machinery providing light, barriers,<br />

dangers, signals, choukidar and running charges <strong>of</strong> all machinery<br />

with major and minor repair with P.O.L and o<strong>the</strong>r lubricants, pay<br />

<strong>of</strong> machinery staffs, all materials, labour, tools and plants<br />

incidential charges including higher charges <strong>of</strong> machinery, supply<br />

and carriage <strong>of</strong> water, including disposal <strong>of</strong> unserviceable material<br />

and machinery from site after completion <strong>of</strong> work with all leads<br />

and lifts including all taxes and royalty all complete job as per<br />

direction <strong>of</strong> E/I<br />

I No <strong>of</strong> R.C.C deck slab high level bridge-No <strong>of</strong> sqan -8<br />

Nos Class AA<br />

2 Load bearing capacity test report <strong>of</strong> R.C.C pier over raft<br />

foundation with analystical expertise advise <strong>of</strong> <strong>the</strong> remedial<br />

recommendation for class AA loading (completed pier/<br />

uncompleted pier in its length) including loading and unloading<br />

arrangement <strong>of</strong> machinery and materials at site. Handling <strong>of</strong><br />

machinery providing light, barriers, dangers, signals, choukidar<br />

and running charges <strong>of</strong> all machinery with major and minor repair<br />

with P.O.L and o<strong>the</strong>r lubricants, pay <strong>of</strong> machinery staffs, all<br />

materials, labour, tools and plants incidential charges including<br />

higher charges <strong>of</strong> machinery, supply and carriage <strong>of</strong> water,<br />

including disposal <strong>of</strong> unserviceable material and machinery from<br />

site after completion <strong>of</strong> work with all leads and lifts including all<br />

taxes and royalty all complete job as per direction <strong>of</strong> E/I<br />

NO. <strong>of</strong> R.C.C pier <strong>of</strong> raft foundation -19 NOS (32 nd o 50 th<br />

pier)<br />

3<br />

Each<br />

Nos.)<br />

8<br />

Each 19<br />

Rate Amount<br />

Executive Engineer<br />

R.C.D., Road Division, Deoghar.


Sl<br />

No<br />

Group No-02 NIQ No.-03/2010-11<br />

Load test <strong>of</strong> deck slab <strong>of</strong> R.C.C high level bridge in K.M. 18 th (One No)<br />

and KM. 35 th (Two Nos.) <strong>of</strong> Deoghar to Sarath Road for <strong>the</strong> year<br />

2010-11<br />

Item Unit Qty<br />

(in<br />

1 Deflection and load bearing capacity test report <strong>of</strong> R.C.C deck slab<br />

with analystical experties advice <strong>of</strong> <strong>the</strong> remedial recommendation for<br />

class 70R including loading and unloading arrangement <strong>of</strong> machinery<br />

and materials at site. Handling <strong>of</strong> machinery providing light, barriers,<br />

dangers, signals, choukidar and running charges <strong>of</strong> all machinery with<br />

major and minor repair with P.O.L and o<strong>the</strong>r lubricants, pay <strong>of</strong><br />

machinery staffs, all materials, labour, tools and plants incidential<br />

charges including higher charges <strong>of</strong> machinery, supply and carriage <strong>of</strong><br />

water, including disposal <strong>of</strong> unserviceable material and machinery<br />

from site after completion <strong>of</strong> work with all leads and lifts including all<br />

taxes and royalty all complete job as per direction <strong>of</strong> E/I<br />

i) 18 th K.M- deck Slab(14.5m span) for Class 70R<br />

wheel loading.<br />

ii) 35 th K.M -Deck Slab (20.3m span) for Class 70R -<br />

wheel loading .<br />

iii) 35 th K.M- Deck Slab (23.02m span) for Class 70R<br />

wheel loading.<br />

4<br />

Each<br />

Each<br />

Each<br />

Nos.)<br />

1<br />

3<br />

3<br />

Rate Amount<br />

Executive Engineer<br />

R.C.D., Road Division, Deoghar.


Sl<br />

No<br />

Group No-03 NIQ No.-03/2010-11<br />

Load test <strong>of</strong> R.C.C. deck slab <strong>of</strong> High level bridge in K.M 35 th <strong>of</strong> Jama-<br />

Jamtara Road for <strong>the</strong> Year 2010-11<br />

Item Unit Qty<br />

(in<br />

1 Deflection and load bearing capacity test report <strong>of</strong> R.C.C deck slab<br />

with analystical experties advice <strong>of</strong> <strong>the</strong> remedial recommendation for<br />

16m length one span class 70R including loading and unloading<br />

arrangement <strong>of</strong> machinery and materials at site. Handling <strong>of</strong><br />

machinery providing light, barriers, dangers, signals, choukidar and<br />

running charges <strong>of</strong> all machinery with major and minor repair with<br />

P.O.L and o<strong>the</strong>r lubricants, pay <strong>of</strong> machinery staffs, all materials,<br />

labour, tools and plants incidential charges including higher charges <strong>of</strong><br />

machinery, supply and carriage <strong>of</strong> water, including disposal <strong>of</strong><br />

unserviceable material and machinery from site after completion <strong>of</strong><br />

work with all leads and lifts including all taxes and royalty all<br />

complete job as per direction <strong>of</strong> E/I<br />

.<br />

i) 35 th K.M –One No <strong>of</strong> R.C.C Deck Slab high level<br />

bridge 16m one span Class 70R<br />

5<br />

Each<br />

Nos.)<br />

1<br />

Rate Amount<br />

Executive Engineer<br />

R.C.D., Road Division, Deoghar.