TENDERER<br />
MEMORANDUM OF TENDERS ISSUED<br />
<strong>BY</strong><br />
EXECUTIVE ENG<strong>IN</strong>EER, R.C.D., ROAD DIVISION, RANCHI (Rural)<br />
[<strong>TO</strong> <strong>BE</strong> <strong>FILLED</strong> <strong>IN</strong> <strong>BY</strong> <strong>THE</strong> ISSU<strong>IN</strong>G <strong>AUTHOR</strong>ITY ]<br />
1. (a) Last date of submission of tender :- 27.01.2011<br />
(b) Cost of Bill of Quantity :- ` 5000.00<br />
2. Tender Notice issued vide Memo No. :-<br />
3. (a) Name of Work : - Emergent Protection of road embankment and<br />
construction of approach road of Halmad bridge in KM 24 of Jonha -<br />
Purabdih Road for 2010-11<br />
(b) Estimated Cost:- ` 39,99,559.00<br />
(c) Earnest Money required to be deposited :- ` 80,000.00<br />
(d) Maximum limit of lowest valid rate (-) 15% (Fifteen percent)<br />
4. Time prescribed to complete the work :- 20 th March 2011<br />
5. Total item of work 20 (Twenty)<br />
6. NIT, General Rules, Special Conditions and <strong>TO</strong>R in pages :- 18 (Eighteen).<br />
7. B.O.Q. in pages : - 6 (Six)<br />
1. Full name of the Tenderer :-<br />
EXECUTIVE ENG<strong>IN</strong>EER<br />
R.C.D., ROAD DIVISION, RANCHI (Rural)<br />
[ <strong>TO</strong> <strong>BE</strong> <strong>FILLED</strong> <strong>IN</strong> <strong>BY</strong> <strong>THE</strong> TENDERERS ]<br />
2. Present address of the Tenderer :-<br />
3. Tenderer's (i) Class ___________ (ii) Reg. No. __________<br />
4. Issued by _________________<br />
_________________________________________________________________<br />
List of documents being submitted with the tender :-<br />
1<br />
Full Signature of Tenderer
TENDERER<br />
ROAD DIVISION, RANCHI (Rural)<br />
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND<br />
SHORT NOTICE <strong>IN</strong>VIT<strong>IN</strong>G RE-TENDER (N.I.T.)<br />
CHAPTER -1<br />
1.1. Sealed tender on approved bill of quantity to be eventually drawn in PWD<br />
Form No. F2 will be received from Registered eligible RCD GOJ contractor of<br />
appropriate category on 27.01.2011 till 3.00 PM by Chief Engineer<br />
(Communication) R.C.D., Jharkhand, Ranchi, the S.E., Road Circle, Ranchi &<br />
Executive Engineer, Road Division, Ranchi (Rural).<br />
1.2. For the Work of Emergent Protection of road embankment and<br />
construction of approach road of Halmad bridge in KM 24 of Jonha -<br />
Purabdih Road for 2010-11 at an Estimated cost of ` 39,99,559.00 and will<br />
be opened by Chief Engineer (Communication) R.C.D., Jharkhand, Ranchi,<br />
the S.E., Road Circle Ranchi & Ex. Engineer, Road Division, Ranchi "(Rural<br />
on 27.01.2011 at 3.30 PM. The Tenderer or their authorized representative<br />
whosoever desire may remain present at the time of opening of tender in the<br />
above said offices.<br />
1.3. The work is to be completed in all respect upto 20 th March 2011. The items of<br />
works, Plan, specifications or any other information in connection with the<br />
work can be seen in the office of the Executive Engineer, RCD, Road<br />
Division, Ranchi (Rural) on any working day during office hours before filling<br />
the tender.<br />
1.4. Bill of Quantity can be purchased from the Office of the E.E, Road Division,<br />
Ranchi (Rural), S.E., Road Circle, Ranchi and Chief Engineer<br />
(Communication) R.C.D., Jharkhand, Ranchi on payment of ` 5000.00 (nonrefundable)<br />
in the shape of Account Payee Bank Draft payable at Ranchi only<br />
in favour of Executive Engineer, R.C.D, Road Dvision, Ranchi (Rural) (by<br />
designation), for each work as mentioned in the tender notice on during<br />
working hou` NO tender paper will be sold by any office detailed above on the<br />
date fixed for receiving the tender.<br />
1.5. EARNEST MONEY (E.M.) :- ` 80,000.00.<br />
1.5.1. Tenderers are required to deposit E.M. amounting to ` 80,000.00 in the shape<br />
of Bank Guarantee from a Schedule Bank and valid for 90 (Ninety) days from<br />
the date of receipt of tender, National Saving Certificate (6th issue & 8th<br />
issue), 3/5 Years Post Office Time deposit duly pledged from any Post Office<br />
within the State of Jharkhand, in favour of Executive Engineer, RCD, Road<br />
Division, Ranchi (Rural), by designation only condition apply.<br />
Note :- Insurance Guarantee Bond / Cash / Cheque / Bank Draft or any other<br />
security in place of those specified above shall not be accepted.<br />
1.5.2. Duly pledged E.M. if any lying with the concerned Executive Engineer against<br />
work already completed shall not be adjusted by transfer, In such case the<br />
tenderer is required to get the same refunded and then attach the same with<br />
tender, duly pledged afresh against the work for which tender is filled.<br />
1.5.3. Tender not accompanied with required E.M in the prescribed manner shall be<br />
outrightly rejected and will have no place in the comparative statement.<br />
1.5.4. Clauses 1.5.1 to 1.5.3 shall not apply to tenderers who are exempted from<br />
depositing E.M. Such tenderers must enclose photostat copy of the exemption<br />
certificate issued by the competent authority in this respect.<br />
1.6. Tenderer should quote his / her / their rate on overall items (not item - wise) in<br />
percentage above or below (both in figure & words) over their rates mentioned<br />
2
TENDERER<br />
in the bill of quantity issued by the authorized officer.<br />
1.7. In case the overall rates quoted by the Tenderer is less than 15 (Fifteen) %,<br />
this will be treated as unworkable & the tender may be treated as invalid.<br />
1.8. It will be obligatory on the part of the tenderer to keep their offer open for<br />
acceptance for a period of 180 days from the date of opening of tender.<br />
1.9. Tenderers shall enclose photostat copy of his / her / their registration &<br />
exemption certificate (if any) in absence of which the tenders may not be<br />
considered.<br />
1.10. Sales Tax/Income Tax clearance certificate; Labour License & Letter of<br />
Registration of RCD Govt. of Jharkhand as contractor should be submitted by<br />
the tenderer for works costing more than 10,000/- otherwise it may be<br />
rejected.<br />
1.11. Authority is reserved to reject any or all the tenders received or to allot the<br />
work to one or more contractors without assigning any reason.<br />
1.12. In the case of successful tenderer(hereinafter called contractor) the amount of<br />
E.M will be transferred towards Initial Security Deposit in such a manner so<br />
that the security deposit will be 5% of approved amount of tender & the<br />
remaining 5% shall be recoverable from the subsequent bills.<br />
1.13. The Earnest Money of successful tenderer (hereinafter called the<br />
contractor)which accompany the tender will be forfeited in case the tenderer<br />
declines to sign the agreement or fails to deposit Security Money within 10<br />
days of being called upon to do so, after approval of tender by Competent<br />
Authority Those contractors, who are exempted from depositing E.M,will<br />
deposit initial security money within 10 days of being called upon to do so.lf<br />
they fail to do so or decline to sign the agreement within the stipulated period<br />
requisit sum of money will be forfeited by way of adjustment from any sum to<br />
be paid to him by the department for other works, including his security money<br />
and in addition he will be Black Listed and his registration will be cancelled.<br />
1.14. The N.I.T with general rules and special conditions will form part of the<br />
Contract Documents.<br />
1.15. The following departmental materials/equipments.if supplied by the<br />
department, their issue rates will be charged from the contractor as mentioned<br />
below against each item.Their place of delivery is also indicated. Carriage or<br />
transportation of these materials or equipments to the work site is to be done<br />
by the contractor at his own cost<br />
Particulars Unit Issue/Recovery<br />
Rate<br />
3<br />
Place of<br />
Delivery<br />
Remarks<br />
1 2 3 4 5<br />
Cement Per Bag To be<br />
supplied it<br />
available<br />
Tor Steel Per M.T.<br />
M.S. Rod<br />
(Plain)<br />
Packed<br />
Bitumen<br />
Per M.T.<br />
Per M.T. Ex-Eng. RCD Godown,<br />
Ranchi (Rural)<br />
Hire Charges of Road Roller with Depreciation and Major<br />
Repairs ` .......................
TENDERER<br />
Hire Charges of Road Roller without depriciation & Major<br />
Repairs ` ....................<br />
Empty Cement Bag each @ ` .........................................<br />
Paint @ ` ..................... per Liter<br />
Salary of Roller Driver & Khalasi per day @ ` ...............<br />
Hume Pipe :-<br />
NP3 dia ........................ per Meter<br />
NP2 dia ........................ per Meter<br />
1.16. As per order contained in Letter No.A2-C.W-Tender-17 /93-4605(E) Dtd.<br />
1/9/93 of Engineer-m-Chief cum Addl. Commissioner cum Special Secretary<br />
R.C.D, Govt. Of Bihar. it is essential for the tenderers to have ownership of<br />
the following Road Making Machineries in working condition:-<br />
(A) For works the estimated cost of which is more than `ONE Crore :-<br />
(I) Diesel Road Rollers - 2(two) numbe`<br />
(II) Mini Hot-Mix Plant- 1(one) number.<br />
(Ill) Tar Boiler - 1(one) number.<br />
(B) For works the estimated cost of which is more than `20 (Twenty) Lakh<br />
:-<br />
(I) Diesel Road Roller - 1(one) number.<br />
(II) Tar Boiler -1(one) number.<br />
1.17. Tenderers having ownership of Earth Moving machineries in working<br />
condition will be given preference in allotment of those works the estimated<br />
cost of which is more than `1.00(One)Crore only.<br />
1.18. Tenderers having ownership of HMP Paver Diesel Road Roller (Vibratory &<br />
Normal) and Tar Boiler etc. i e Road making machineries in working condition<br />
may be considered to be given preference in allotment of works, the<br />
estimated cost of which is more than ` 50.00(Fifty) Lacs only<br />
1.19. Tenderers are required to attach with their tenders authorized and valid<br />
certificates regarding their actual ownership of the Road making machineries<br />
and Earth Moving machineries mentioned in clause 1.17 & 1.18, failing which<br />
their claim for allotment of the work may be rejected.<br />
1.20. The authorized and valid certificates of actual ownership of the above<br />
mentioned Road making machineries and Earth Moving machineries to be<br />
attached with the tenders must prove that the tenderer/tenderers<br />
himself/themselves are actual bonafied owners of those Road making<br />
machineries and Earth Moving machineries and the same are in working<br />
condition.<br />
1.21. Payment will be made subject to availability of fund.<br />
TENDERER<br />
4
CHAPTER-II<br />
GENERAL RULES<br />
2.1 The complete Tender with all its enclosures shall be enclosed in sealed<br />
envelop and delivered / sent by Registered Post to the Chief Engineer<br />
(Communication),Ranchi / Superintending Engineer. Road Circle.Ranchi /<br />
Executive Engineer, RCD, Road Division, Ranchi (Rural) as the case may be<br />
so as to reach on or before the date and time as stipulated in N.I.T para 1.1<br />
2.2. The tenderer should mention in his forwarding letter a list of all documents<br />
submitted with the tender.<br />
2.3. The tender shall contain the full name, Contact Number address of residence<br />
and place of business of person or persons filling the tender. In case their is<br />
subsequent change in address, it must be informed to the concerned E.E,<br />
S.E., C.E by Registered Post with A/D.<br />
2.4. All pages of Tender Document, General Rules and Special Conditions must<br />
be initiated at the lower left hand corner, as person, where required in the<br />
tender papers by the tenderer or as person holding power of attorney<br />
authorizing to sign on behalf of the partners before submission of the tender.<br />
2.5. In the event of the tender being submitted by a firm, it must be signed by each<br />
partner thereof, and in the event of absence of any of the partner the power of<br />
attorney authorizing him to do so must be produced on demand. All<br />
signatures shall be dated.<br />
2.6. No tenderer shall file tender for more than one work in one sealed envelope.<br />
Tenderer desirous of submitting tender for more than one work shall submit<br />
tender in separate sealed envelope for each work on appropriate and duly<br />
purchased B.O.Q. The name of the work should be clearly written on the<br />
sealed envelope.<br />
2.7. The rates quoted by the tenderer shall be inclusive of Income Tax, Sales Tax,<br />
Royalty or any other Provincial and. Central Taxes applicable at that time.<br />
2.8. The tenderer shall be presumed to have carefully examined the conditions of<br />
the contract and specifications of the work. The tenderer will also be deemed<br />
to have inspected the work site and to have satisfied<br />
himself/herself/themselves independently as to the nature, extent and<br />
practicality of all works and required approaches & other means of<br />
communication & access, to the site, as referred to lands, buildings, available<br />
for accommodation that may be required for temporary purpose in connection<br />
with the contract of work, also availability of construction materials, location of<br />
work site including its climate & other geological characteristic, availability of<br />
skilled, semi-skilled & un-skilled laboure` The consequences of the lack of<br />
necessary knowledge required for the work will be totally at the risk and cost<br />
of tenderer.<br />
2.9. Normally specification of road, Ministry of Transport & Highways, Government<br />
of India (MORT & H) would be followed for the execution of works. Those<br />
works, which are not covered by MORT & H Specification, R.C.D or Circle<br />
specification will be followed.<br />
2.10. The tenderer will have to submit a program of the work to be executed with<br />
the tender.<br />
2.11 The tenderer will maintain watch guards for the safety of the materials, if any,<br />
supplied by the department at his own cost.<br />
2.12. All labourers engaged in the work are to be paid as per latest Minimum<br />
5
Wages Act. in force at the time of execution of contract work.<br />
2.13. The tenderer will provide to the labourers ,hut for shelter, drinking water safety<br />
and worksite and medical facilities and keep the site clean at his own cost.<br />
2.14 Extension of time on valid reasons may be granted by the competent<br />
authorities as per Government rules and circulars in force and as revised from<br />
time to time.<br />
2.15. The tenderer must return all the tender papers duly signed on each page<br />
while submitting the tender paper, failing which the same may be declared<br />
invalid.<br />
2.16. On receipt of the written order from the concerned Executive Engineer, the<br />
successful tenderer will first deposit the balance amount of initial security<br />
deposit (ISD)within the specified period of ten days and then enter into an<br />
agreement with Executive Engineer on the basis of the stipulation in the<br />
approved tender documents along with subsequent terms as mutually'agreed<br />
upon before the issue of work order. Written order to commence the work<br />
shall be issued by the Executive Engineer after acceptance of the agreement<br />
by the competent authority.<br />
2.17. (a) lf the rate quoted by the tenderer above the BOQ rate and the<br />
competent authority approved the rate, then the enhancement over the<br />
BOQ rates shall not be applicable over the cost of bitumen.<br />
TENDERER<br />
(b) It the tenderer quotes the rate below the BOQ rate and the competent<br />
officer approved it, then the reduction over the BOQ rate shall be<br />
applicable on all items of work including the cost of bitumen.<br />
6
CHAPTER- III<br />
SPECIAL CONDITIONS FOR F2 / H CONTRACT<br />
3.1. The successful tenderer (hereinafter called the Contractor must maintain a<br />
site order book at each work site which will be produced when asked for by<br />
the departmental Officers for needful. Any order or instruction passed on the<br />
site order book by the Inspecting officer should be communicated to the SDO,<br />
EE, SE and concerned inspecting Officers by the J.E in charge of the work. A<br />
copy of the same should be kept by the J.E. The site order book may be<br />
submitted to E.E with running account bills ,if required, but must be submitted<br />
with final bill.<br />
3.2. The contractor should always remain available at the work site ,but where it is<br />
not so possible for him to do so, he must appoint a representative for the<br />
purpose who would be duly authorized by the contractor to receive<br />
instructions and carry out instruction of departmental officers .and also to<br />
receive lette` He may also delegate him any other power as he thinks fit ,but<br />
in every case he will inform immediately the concerned J.E.S.D.O and E.E<br />
regarding appointment of such representative along with his name contact<br />
number, address and identity in writing by Regd Post with A/D.<br />
3.3 If the Royalty clearance certificate for mines/minerals used in the work is not<br />
produced with the bill, Royalty will be deducted from the concerned running<br />
bill, at the rates prevailing at the time of execution of work, by the<br />
department. Production of royalty clearance certificate along with the final bill<br />
is a must, failing which final bill will be neither passed nor paid, and for such<br />
non-payment or delay in payment, the whole and sole responsibility will be of<br />
the contractor alone.<br />
3.4 Recovery of cost for materials supplied by the department will be made at the<br />
rates stipulated in the N.I.T and or agreement. For departmental materials<br />
found to be in excess of actual consumption calculated on the basis of<br />
approved design, drawing and specifications and/or field or laboratory tests<br />
with the contractor, recovery will be made at penal rate or the market rate<br />
prevailing at the time of effecting recovery plus 10%, which ever is higher as<br />
per rules, provided the same is not returned back by him in good and<br />
acceptable conditions to the departmental stores at his own cost.<br />
3.5 The contractor shall provide sufficient plant, equipments and labour and shall<br />
work such hours and shifts as may be necessary to maintain the progress as<br />
per schedule. The working and shift hours should comply with all Govt, rules<br />
and regulations in force from time to time during the entire period of execution<br />
of the contract work.<br />
3.6 The contractor shall make adequate arrangement for the safety of the<br />
labourers during execution of the contract work. He will be responsible for any<br />
compensation for the same and will have to be paid by him as decided by the<br />
competent authority.<br />
3.7 The-contractor should get the sample of all the materials approved by the E/l,<br />
before collecting the same for use at work site.' The sample in sealed glass<br />
jars shall be kept in the custody of the E/l.<br />
3.8 The contractor shall have to get tested the strength of cement concrete(both<br />
plain & reinforced)for each days casting as per IRC codes. Although<br />
achievement of the prescribed cube strength is a must, concrete found to<br />
have lower value may be rejected or accepted at suitable reduced rate under<br />
7
specific orders of the competent authority. The cost of concrete cubes,<br />
moulds, carriage of cubes to and from the testing laboratory and all other<br />
incidental charges incurred in this regard shall be borne by the contractor.<br />
3.9 The contractor shall, if required by the E/l, must arrange for test of other<br />
materials at his own cost. If the quality of materials appears to be inferior or<br />
the portion of the work is found to be defective or unsound ,the contractor may<br />
be asked to remove and or pull down and re-execute the same at his own<br />
cost or in case such defect is found out due to departmental fault he shall be<br />
paid at suitably reduced rates for that item of work .The contractor shall bear<br />
all cost in this regard.<br />
3.10 For works exceeding ` 50 (Fifty) Lacs, it will be obligatory for the contractor to<br />
keep a properly equipped testing laboratory near the work site at his own cost<br />
.where he will get the samples tested by the department<br />
3.11 All rejected materials will have to be removed from the site by the contractor,<br />
after their rejection, within seven days from the date of written order of E.E,<br />
failing which the E.E will get these removed in whatsoever manner he thinks<br />
fit and will recover the cost involved for such removal from the contractor after<br />
lapse of seven days time<br />
3.12 M.S.Bars, joint angles etc. will be issued in length available in the<br />
departmental stores. Their cut pieces in length less than 1/10m shall not be<br />
taken back. While assessing the quantity of consumption in the work, wastage<br />
in such materials may be allowed up to maximum limit of 5% after due<br />
consideration by the department Cost of quantity allowed as wastage shall be<br />
recovered at issue rate of such materials as prescribed in para 1.15 of N.I T.<br />
3.13 Issue rate of supply of Bitumen as mentioned in Para 1.15,includes cost of its<br />
drums, hence the empty bitumen drums are to be returned back in good<br />
condition to the stores from where it was issued, failing which its cost will be<br />
recovered from the bill of contractors @ `80/-(Eighty) only per drum.<br />
3.14 If the actual lead of materials like stone metal, stone chips, boulder, bricks,<br />
sand , moorum etc is found to be less than the lead provided in the BOQ, then<br />
its payment will be made proportionately on reduced rate. In case the actual<br />
lead is more than the lead provided in the BOQ it will be mandatory to obtain<br />
prior consent of the authority who approved the tender, before<br />
commencement of supply of such materials from the increased lead, else no<br />
claim of contractor will be entertained for enhanced lead.<br />
3.15. It will be essential to do all items of road works (Original work) in sequence<br />
from one end in scientific way so as to complete the works up to next end. It<br />
should not be done in hazarded way such as collection of materials in one<br />
Kilometer, box- cutting in other Kilometers, consolidation work in patches etc.,<br />
which leads to progress of all Items of work simultaneously Kilometerwise.quantity-<br />
wise always from one end. So that the complete road is<br />
available for use in one strech from that end after completing the work in<br />
particular Kilometer,and then only take up the work In next Kilometer.<br />
3.16 After completion of work the contractor will remove all debris and fill up vats<br />
etc.,as desired by E/l and leave the site clear and tidy at his own cost.<br />
3.17 The department reserves the right of omitting or suspending the construction<br />
or changing site etc., if considered necessary at any stage.<br />
3.18 The following items shall not be paid extra and the tendered rates shall be<br />
inclusive of those:-<br />
(i) Site clearance such as clearing the shrubs, bushes, wood-undergrowth &<br />
8
small trees not exceeding 12" in girth measured at 3' above the ground.(ii)<br />
Setting out works, profile, lay-out etc. (iii) Venderised battering or benching or<br />
excavation of foundation trenches, (iv) Forming or leaving "Toll - Tate" or<br />
witness in borrow pits and their removal after measurement. However<br />
deduction will be made in quantity of earth work for those.(v) Excavation for<br />
inserting of planking and shuttering.(vi) Forming (or leaving) stop in sides of<br />
deep excavation & their removal after measurement.(vii) Bailing out rain<br />
water/and or surface water in case the excavated foundation trenches were<br />
filled up by these during entire period of construction.(viii) Removing of spoils<br />
that of fells in excavation, (ix) Making vats, platform, channel etc.<br />
3.19 The contractor will have to use his own machinery for completion of the work<br />
within the time stipulated in the contract, the carriage of machinery to different<br />
sites under this contract from one place to another for this work will be the<br />
responsibility of the contractor and all expenses in this regard will be born by<br />
him.<br />
3.20 Other machinery like asphalt, mixer, tar-boiler, pump, vibrator, concrete mixer<br />
etc., if available in the stores of the concerned division , may be issued to the<br />
contractor on his written request(on hire or free of cost as the case may be)on<br />
the terms quoted in his tender cove` Their hire charges, if applicable, along<br />
with its called expenses as detailed below in sub-paras 3.20.1 to 3.20.10<br />
which are to be for departmental machinery. The condition laid down in subpara<br />
3.20.1 to 3.20.10 will apply to departmental road roller issued to<br />
contractor.<br />
3.20.1 Hire charges of roller has been indicated in Para 1.15 of N.I.T. Hire charges of<br />
other machineries will be communicated on , and the same shall have to be<br />
accepted by the contractor. Prayer for reduction of hire charges so fixed shall<br />
not be entertained.<br />
3.20.2 Carriage and running charges of machineries, if any, including on incidental<br />
and contingent charges for transporting the same from place of delivery to the<br />
work site and their return to the place of issue, shall be borne by the<br />
contractor on his own cost.<br />
3.20.3 Salary of roller driver, khalasi, operator of other machineries will be borne by<br />
the contractor for the period the machineries in question remaining with the<br />
contractor. The period spent on it's transport from place of issue to work site<br />
and back shall also be for that purpose. It will be the responsibility of the<br />
contractor to obtain necessary information regarding salary of the<br />
departmental staff.<br />
3.20.4 The cost of fuel and lubricants for running the machinery will be borne by the<br />
contractor.<br />
3.20.5 The plants and machineries issued on hire or free of cost to the contractor by<br />
the department will have to be maintained properly. In addition to its general<br />
daily maintenance and in case of roller, it shall also be cleaned in a week &<br />
stores required for cleaning i.e. kerosene oil, jute, grease, mobil etc. will have<br />
to be supplied by the contractor at his own cost The Mobil oil and C.Oil will<br />
have to be changed after 200(two hundred) & 1000(one thousand) running<br />
hours respectively at his own cost.The quality of all the above materials, used,<br />
must be-approved by the E/l before use.<br />
3.20.6 During the operation period, while the machinery is on work with the<br />
contractor, all minor repairs or break down .costing up to `1000/- at a time will<br />
be the responsibility of the contractor and such repair should be completed<br />
within a maximum period of three days under intimation to concerned J.E.<br />
S.D. O & E.E.<br />
9
3.20.7 In case the contractor fails to supply the required fuels, lubricants and other<br />
stores required for running and proper maintenance of the departmental<br />
machineries, issued to contractor on hire or free of cost for using the same in<br />
the work, the same shall be supplied by the department & full cost, inclusive<br />
of handling, procurement and all other incidental charges shall be recovered<br />
from the contractor from next immediate bill. It will be responsibility of the<br />
concerned J.E and S.D.O to keep the contractor, E.E. and S.E informed of<br />
such expenses well in time<br />
3.20.8 If the departmental road roller remains idle due to contractor's fault, it's cost<br />
will be recovered from the Contractor as per Schedule of Rate for this item<br />
applicable at the time.<br />
3.20.9 Hire, establishment and other charges for the Idle or repair periods shall be<br />
borne by the contractor.<br />
3.20.10 In the event of loss or theft of the machinery or any of its components<br />
in part or full when it stands issued to the contractor, the value of such lost<br />
articles will be recovered from the contractor at the price fixed by the C.E. or<br />
E.G concerned.<br />
3.21 CLAIM NOT ADMISSIBLE under following circumstances :-<br />
a)Extra Items of work done without written order of competent authority :-<br />
b)In case Sudden fluctuation and / or increase In rates of labour, materials,<br />
royalty, various taxes, railway freight, fuel, lubricants, carriage cost etc. at any<br />
stage of the work<br />
c) Short supply and / or non-supply and / or delay in supply of departmental<br />
materials and / or equipments<br />
d)Non-availability of labour of any category required for the work.<br />
e)Labour sitting idle due to any reason / cases.<br />
f) Delay in communication regarding any charges or modification in design,<br />
drawing, specification, alterations, etc.<br />
g)Loss sustained due to :-<br />
1) Acts of enemies including agitation by <strong>Public</strong> and Riot.<br />
2) Transportation and Procurement difficulties.<br />
3) Natural Calamities.<br />
4) Any other circumstances out of human control.<br />
3.22 In case Bulk Bitumen is issued by the department to the agency, no extra cost<br />
will be paid on account of lifting the same from departmental godown in<br />
drums, empty them and carriage of the same from the R.C.D godown to the<br />
site of work and these operations will have to be done by the contractor at his<br />
own cost.<br />
3.23 Proportionate deduction shall be made from the bill of the contractors for less<br />
leads of stone aggregates and moorum from their sources of actual receipt in<br />
comparison to those provided in the B.O.Q, but no extra payment will be<br />
made for more leads if any actually involved unless approved in advance by<br />
the competent authority.<br />
10
3.24 Extension of time, if justified, may be granted by the different competent<br />
officers for different periods of time, for different types and values of works as<br />
noted below, otherwise penalty for non-fulfillment of the contract may be<br />
imposed, after giving due consideration for poor progress at different stages<br />
of works without valid and satisfactory reasons. More payments of running<br />
account bills, keeping back certain amount for non-extension of time, does not<br />
qualify as a valid ground for grant of Extension of time as a matter of right.<br />
The Officer granting such extension of time has the full liberty to wait &<br />
examine the circumstances which led to such requirement for fulfillment of<br />
contract, and use his own discretion for passing final orders, which shall be<br />
treated as final and shall be binding and conclusive for the contractor.<br />
1. Executive Engineer i) Up to Any period for Repair Works.<br />
RCD.Road Division.Ranchi ii) For Any period for Original works valued up<br />
(Rural) to ` 10,000/-<br />
iii) Up to 50 % above the contract period for<br />
original work valued between `10.000/- to<br />
50,000/-<br />
2. Superintending Engineer i) Up to Any period for Original Works of value<br />
RCD.Road Circle.Ranchi between Rs 10 to 50 thousand.<br />
ii) Up to 100 % above the contracted period for<br />
the original work of value between 50,000/- to<br />
50 lakhs.<br />
3. Chief Engineer(Com.), RCD i) Up to Any other period for work up to<br />
Jharkhand, Ranchi. `5 lacs.<br />
ii) 100 % above the contracted period in case<br />
of Original Works of `5 lakh to 10 lac<br />
iii) For granting extension beyond 100% of<br />
time of completion in respect of work of the<br />
value between ` 5 Lacs to `10 Lacs and for<br />
any extension to work of value above ` 10<br />
Lacs,the Chief Engg. will grant extension after<br />
bringing into the notice of the Government.<br />
3.25 The contractor shall, if required by the E/l arrange to test materials at site or<br />
get them tested in recognised departmental testing laboratories at his own<br />
cost in order to prove their soundness and sufficiency as per specifications<br />
laid down. The number of tests required for different items will be specified by<br />
the E/l.<br />
3.26 The estimated output of the roller for 8 hours wotking is as follows :-<br />
Compaction of Moorum / Gravel. 566.00 m3<br />
Compaction of Earth Work. 566.00 m3<br />
Consolidation of Grade - I 25.00 m3<br />
Consolidation of Grade-II 25.00 m3<br />
Consolidation of Grade-III 25.00 m3<br />
20 mm thick Pre-mixing 500.00 m2<br />
Surface Dressing. 650.00 m2<br />
3.27 The Contractor -will have to give an affidavit for the Hot Mix Plant paver<br />
finisher, vibratory roller and other equipments shown as credential deployed<br />
for completion of this specific work on top most priority basis.<br />
11
Bill of Quantity for Emergent protection of road embankment and construction of approach road of<br />
Halmad Bridge in Km 24th of Jonha Purabdih Road<br />
Estimated Cost : Rs. 3999559.00<br />
Earnest Money : Rs. 80,000.00 Cost of B.O.Q. : Rs. 5000.00<br />
Time of Completion : upto 1 month<br />
1.<br />
Sl.<br />
No.<br />
2.<br />
3.<br />
Description of Item Unit Qty Rate Amount (in<br />
Rs.)<br />
In figure In words<br />
Earth work in road embankment<br />
and shoulders with ordinary soil<br />
(vide classification of soil item -A)<br />
obtained from borrow pits or any<br />
other sources free from logs,<br />
stumps roots, rubbish or any other<br />
ingredients likely to deteriorate or<br />
effect the stability of the<br />
embankment including breaking<br />
the clods maximum to 60 mm<br />
cube, placing the earth in layers<br />
not exceeding 225 in loose<br />
thickness, rough dressing<br />
including cost of cutting and<br />
removing shurbs and roots falling<br />
in borow area all complete as per<br />
approved design specification and<br />
direction of E/I (Mode of<br />
measurement - sectional<br />
measurement after required<br />
completion with initial lead 10M &<br />
lift 1.5M.<br />
Consolidation of road<br />
embankment in all kinds of soil<br />
including hard and gravelly soil,<br />
soil mixed with boulders by<br />
manual labour in layers not<br />
exceeding 150mm in loose<br />
thickness with C.I. hammer so as<br />
to achieve 85% of maximum dry<br />
density at O.M.C. including<br />
uniformly mixing the required<br />
quantity of water with all leads<br />
and lifts finishing the surface to<br />
proper grade, camber or super<br />
elevation, including cost of<br />
providing light, barrier, danger<br />
signal, chowkidar, all complete as<br />
per specification and direction of<br />
E/I.<br />
Providing stone metal grade-ll<br />
(63mm to 45mm size) with<br />
screening materials crushable<br />
type such as moorum as gravel in<br />
road embankment in proper<br />
grade, camber or super elevation<br />
laid loose in thickness (1.33 times<br />
the desired completed _^<br />
Per M 3 903.21 126.63<br />
Per M 3 903.21 11.69<br />
Per M 3 160.88 1251.05<br />
12<br />
Rupees<br />
One<br />
Hundred<br />
Twenty Six<br />
and Paise<br />
Sixty Three<br />
only<br />
Rupees<br />
Eleven and<br />
Paise Sixty<br />
Nine Only<br />
Rupees One<br />
Thousand<br />
Two Hundred<br />
Fifty One and<br />
Paise Five<br />
Only<br />
114373.00<br />
10559.00<br />
201269.00
4.<br />
5.<br />
6.<br />
thickness) compacted by road<br />
roller with cost of water, all leads<br />
and lifts including higher charge of<br />
road roller, all compacted as per<br />
specification and direction of E/l.<br />
Providing stone metal grade-Ill<br />
(53mm to 22.4mm size) with<br />
screening materials crushable<br />
type such as moorum as gravel in<br />
road embankment in proper<br />
grade, camber or super elevation<br />
laid loose in thickness (1.33 times<br />
the desired completed thickness)<br />
compacted by road roller with cost<br />
of water, all leads and lifts<br />
including higher charge of road<br />
roller, all compacted as per<br />
specification and direction of E/l.<br />
Providing 50mm thick built up<br />
spray grout over W.B.M. surface<br />
in proper grade, camber or super<br />
elevation in two layers with stone<br />
metal grade-Ill (20mm to 37mm<br />
size) @0.66 M 3 key stone of size<br />
of 12mm ungraded @ 0.13 M3<br />
and bitumen@ 25Kg (including<br />
tack coat @10kg) all per 10M 2<br />
surface including cost of heating<br />
bitumen to required temperature<br />
with the cost of fuel, cleaning the<br />
surface properly with iron brush<br />
and broom, rolling, providing light,<br />
barrier, danger signals,<br />
chowkidar, carriage of bitumen<br />
drums upto 8.0 km lead from<br />
godown to work site and returning<br />
the empty drum to good condition<br />
to the godown and hire charge of<br />
roller without depreciation and<br />
major repair as per specification<br />
and direction of E/l.<br />
Providing and laying bituminous<br />
macadam with 100-120 TPH hot<br />
mix plant providing an average<br />
output of 75 tonnes per hour using<br />
crushed aggregate of specified<br />
grading premix with bituminous<br />
binder, transported to site, laid<br />
over a previously prepared<br />
surface with power finisher to the<br />
required grade, level and<br />
alignment and rolled as per clause<br />
501.6 and 501.7 to achieve the<br />
desired compaction for grading II<br />
(19 mm nominal size)<br />
7. Providing and applying tack coat<br />
with bitumen emulation using<br />
Per M 3 160.88 1332.85<br />
Per M 2 2145 198.47<br />
Per M 3 107.25 5087.06<br />
Per M 2 2145 7.15<br />
13<br />
Rupees<br />
One<br />
Thousand<br />
Three<br />
Hundred<br />
Thirty Two<br />
and Paise<br />
Eighty Five<br />
Only<br />
Rupees<br />
One<br />
Hundred<br />
Ninety Eight<br />
and Paise<br />
Forty Seven<br />
Only<br />
Rupees<br />
Five<br />
Thousand<br />
Eighty<br />
Seven and<br />
Paise Six<br />
only<br />
Rupees<br />
Seven and<br />
Paise<br />
214429.00<br />
425718.00<br />
545587.00<br />
15337.00
8.<br />
emulsion pressure distributor at<br />
the rate of 0.2Kg Per Sq.Mtrs on<br />
the prepared bitumious clean<br />
granular surface clean with<br />
mechanical broom. Providing<br />
light, barriers, danger signals,<br />
chowkidar, making and<br />
maintaining diversion, traffic<br />
regulation, hire & running charges<br />
of all machinery with depredation<br />
and major/minor repair POL and<br />
other lubricants. Pay and<br />
machinery, labour, tools and<br />
plants all taxes & royalties<br />
incidental charges, but excluding<br />
cost of cleaning the road surface<br />
all complete job as per approved<br />
design, drawing as per MOST<br />
specification(4th revision) clause<br />
5.3 and relevant clauses and<br />
direction of E/l (consumption of<br />
Bitumen 75.68MT)<br />
Providing and laying semi dense<br />
bituminous concrete with 100-120<br />
TPH batch type HMP producing<br />
an average output of 75 tonnes<br />
per hour using crushed<br />
aggregates of specified grading,<br />
premixed with bituminous binder<br />
@ 4.5 to 5 percent of mix and<br />
filler, transporting the hot min to<br />
work site, laying with a hydnistatic<br />
paver finisher with sensor conrol<br />
to the required grade, level and<br />
alignment, rolling with smoomh<br />
wheeled, vibratory and tandon<br />
rollers to achive the desire at<br />
compaction as per MORTH<br />
specification clause No. - 508<br />
complete in all resects for grading<br />
(II).<br />
9. Providing and laying of hot<br />
applied thermoplastic compound<br />
2.5 mm thick including<br />
reflectorising glass beads @ 250<br />
gms per sqm area, thickness of<br />
2.5 mm is exclusive of surface<br />
applied glass beads as per<br />
IRC:35 .The finished surface to be<br />
level, uniform and free from<br />
streaks and hole and as per<br />
direction of Engineer- In- Charge.<br />
10. Supplying and installation of<br />
delineatotor (road way indicators,<br />
hazard markers, objectmarkers),<br />
80-100 cm high above ground<br />
level, painted black and white in<br />
each 53.63 7165.85<br />
Per M 3 78 376.00<br />
Per M 3 207 517.00<br />
14<br />
Fifteen Only<br />
Rupees<br />
Seven<br />
Thousand<br />
One<br />
Hundred<br />
Sixty Five<br />
and Paise<br />
Eighty Five<br />
Only<br />
Rupees<br />
Three<br />
Hundred<br />
Seventy Six<br />
Only<br />
Rupees<br />
Five<br />
Hundred<br />
Seventeen<br />
Only<br />
384305.00<br />
29328.00<br />
107019.00
15cm wide strips, fitted with 80 x<br />
100 mm rectangular or 75mm dia<br />
circular rflectorised panels at the<br />
the top, buried or pressed into the<br />
ground and conforming to IRC-79<br />
and the drawings.<br />
11. Providing dressed natural stone<br />
sett pavement with stone bricks of<br />
hard igneous rock as size 250mm<br />
x 125mm x 100mm over 12mm<br />
thick local sand of F.M. 1.8 as<br />
cushion including watering stone<br />
bricks, placed true to lie level,<br />
grade and camber of<br />
superelevation, keeping at least<br />
8mm space in between the sett<br />
joints, staggered and filled with<br />
cement mortar (1:4) sand of F.M.<br />
not less than 2.5 including curing<br />
for not less than 7 days, cost of<br />
water and carriage with all leads<br />
and lifts, cost of all materials,<br />
labour screening of sand taxes<br />
and royalty, providing light, barrier<br />
danger signal, regulation of traffic<br />
etc all complete as per MOST<br />
12.<br />
13.<br />
14.<br />
specification and direction of E/I<br />
Earth work in excavation in<br />
foundation trenches in ordinary<br />
soil (Vide classification of soil<br />
item-A)and disposal of excavated<br />
earth as obtained to a distance<br />
upto 50 M including all lifts,<br />
levelling, ramming the foundation<br />
trenches, removing toots of trees,<br />
shurbs all complete as per<br />
specification & direction of E/I.<br />
Providing P.C.C. M. - 150 in<br />
normal mix of (1:2:4) in foundation<br />
with approve quantity of stone<br />
chips 20mm to 6mm size, grading<br />
and clean coarse sand of F.M. 2.5<br />
to 3 including screening shuttering<br />
mixing cement concrete in mixer<br />
and placing in position vibrating,<br />
striking, curing, taxes and royalty<br />
all complete as per building<br />
specification and direction of E/I.<br />
Providing rough dressed random<br />
rubble stone masonary in<br />
CM(1:3)in foundation with<br />
approved quality of coarse sand<br />
of requisite F.M. (2.5 to 3.0)<br />
washed and screened with<br />
ranking out joints, curing,<br />
soaffolding and its removal<br />
wherever required including<br />
royalty and all taxes etc. complete<br />
job as per specification and<br />
direction of E.I.<br />
Per M 3 360 171.83<br />
Per M 3 489.36 43.61<br />
Per M 3 97.87 3933.81<br />
Per M 3 258.92 2230.47<br />
15<br />
Rupees<br />
One<br />
Hundred<br />
Seventy<br />
One and<br />
Paise Eighty<br />
Three Only<br />
Rupees<br />
Forty Three<br />
and Paise<br />
Sixty One<br />
Only<br />
Rupees<br />
Three<br />
Thousand<br />
Nine<br />
Hundred<br />
Thirty Three<br />
and Paise<br />
Eighty One<br />
Only<br />
Rupees<br />
Two<br />
Thousand<br />
Two<br />
Hundred<br />
Thirty and<br />
Paise Forty<br />
Seven Only<br />
61859.00<br />
21341.00<br />
385002.00<br />
577513.00
15<br />
16<br />
17<br />
18<br />
Providing rough dressed course<br />
stone masonry in cement mortar<br />
(1:3) in superstructure with<br />
approved quality of coarse sand<br />
of requisite F.M. (2.5 to 3.0)<br />
washed and screened with<br />
ranking out joints, curing,<br />
scaffolding and its removal<br />
wherever required including<br />
royalty and all taxes etc. complete<br />
job as per specification and<br />
direction of E/l.<br />
Providing and laying P.C.C. with<br />
nominal mix of (1:2:4) in<br />
superstructure of various<br />
components of canal of<br />
embankment structure with<br />
approved quality of 20mm graded<br />
coarse aggregate of required<br />
grade (as per design) and<br />
approved quality of sand of of<br />
requisite F.M. (2.5 to 3.0) washed<br />
and screened but including<br />
necessary tools and plants,<br />
vibrating, curing royalty and all<br />
taxes etc., excluding cost of form<br />
work as well reinforcement its<br />
cutting bending and placing<br />
complete job as per specification<br />
and direction of E/l.<br />
Earth work in filling foundation<br />
trenches or back filling of<br />
masonary structures with suitable<br />
earth in layers not exceeding<br />
150mm thick well watered,<br />
rammed and fully compacted and<br />
finally dressed with earth obtained<br />
from excavation of foundation<br />
trenches and kept at a lead of<br />
50m and initial lift of 1.5m<br />
complete as per specification and<br />
direction of E/I.<br />
Providing stone boulder and<br />
labour charge for pitching on<br />
apron slope of bank with stone<br />
boulders duly packed (uncreated)<br />
complete job (materials within<br />
150m and all lifts as per<br />
specification and direction of E/I.<br />
Per M 3 112.87 2284.36<br />
Per M 3 2.90 3720.95<br />
Per M 3 132.57 16.00<br />
Per M 3 468 968.60<br />
16<br />
Rupees<br />
Two<br />
Thousand<br />
Two<br />
Hundred<br />
Eighty Four<br />
and Paise<br />
Thirty Six<br />
Only<br />
Rupees<br />
Three<br />
Thousand<br />
Seven<br />
Hundred<br />
Twenty and<br />
Paise<br />
Ninety Five<br />
Only<br />
Rupees<br />
Sixteen<br />
Only<br />
Rupees<br />
Nine<br />
Hundred<br />
Sixty Eight<br />
and Paise<br />
Sixty Only<br />
257836.00<br />
10791.00<br />
2121.00<br />
453305.00
19<br />
20<br />
Providing weep hole with dry<br />
graded stone filter of 20mm to<br />
40mm size in abutment and wing<br />
wall as per specification and<br />
direction of E/I.<br />
Supplying and laying good quality<br />
of stone metal filter (20mm to<br />
63mm size) in the rock toe, heel<br />
trenches, toe drain as per design<br />
and drawing including the cost of<br />
materials, royalty all taxes etc<br />
including the cost of carriage all<br />
complete as per specification and<br />
direction of E/I.<br />
Per M 3 116 59.24<br />
Per M 3 189.6 922.97<br />
17<br />
Rupees<br />
Fifty Nine<br />
and Paise<br />
Twenty Four<br />
Only<br />
Rupees<br />
Nine<br />
Hundred<br />
Twenty Two<br />
and Paise<br />
Ninety<br />
Seven Only<br />
6872.00<br />
174995.00<br />
Total 3999559.00<br />
Executive Engineer,<br />
Road Construction Department,<br />
Road Division, Ranchi (Rural)
<strong>THE</strong> TENDERERS ARE REQUIRED <strong>TO</strong> QUOTE <strong>THE</strong>IR RATES <strong>IN</strong> <strong>THE</strong> FOLLOW<strong>IN</strong>G MANNER<br />
1. .....................................................%(Percent) abovo on the Estimated rate as<br />
written in the Bill Of Quantity.<br />
2. .................................................% (Percent) below on the Estimated rate as<br />
written in the Bill Of Quantity.<br />
3. On the Estimated rate as written in the Bill Of Quantity<br />
{ Strike - out the Items which are not applicable }<br />
18<br />
Signature Of the Tenderer<br />
<strong>THE</strong> TENDERERS ARE REQUIRED <strong>TO</strong> FURNISH <strong>THE</strong> FOLLOW<strong>IN</strong>G <strong>IN</strong>FORMATION<br />
1. Name and address of the Tenderer :-<br />
2. S.Tax & I.Tax Certificates attached :-<br />
3. Earnest Money Deposited & N.S.C /<br />
Pass Book attached :-<br />
4. Registration No. & Date/Year :-<br />
5. Time Of Completion :-<br />
6. Condition/s if any :-<br />
7. Letter of Registration as<br />
Contractor attached :-<br />
8. Labour Licence attached<br />
9. Authorised & valid certificate/s regarding the ownership of Road Construction &<br />
Earth Moving machineries in working condition attached for :-<br />
a} Hot Mix / Mini Hot Mix Plant :-.............................................Nos.<br />
b} Paver :-.............................................Nos.<br />
c) Tripper :-.............................................Nos.<br />
b} Diesel Road Roller :-.............................................Nos.<br />
c} Tar Boiler :-.............................................Nos.<br />
d} Earth Moving Machineries :-.............................................Nos.<br />
3.28 ( For Tenderer offering to use his/her/their own Road Construction & Earth<br />
Moving machinery as per Clause 1.16 to 1.20 of N.I.
TENDERER<br />
MEMORANDUM OF TENDERS ISSUED<br />
<strong>BY</strong><br />
EXECUTIVE ENG<strong>IN</strong>EER, R.C.D., ROAD DIVISION, RANCHI (Rural)<br />
[<strong>TO</strong> <strong>BE</strong> <strong>FILLED</strong> <strong>IN</strong> <strong>BY</strong> <strong>THE</strong> ISSU<strong>IN</strong>G <strong>AUTHOR</strong>ITY ]<br />
1. (a) Last date of submission of tender :- 27.01.2011<br />
(b) Cost of Bill of Quantity :- ` 5000.00<br />
2. Tender Notice issued vide Memo No. :-<br />
3. (a) Name of Work : - Special repair of Bridge (3/1) on Silli River in 3 rd<br />
KM of Silli Banta Hazam Tiker Rangamati Road for 2010-11.<br />
(b) Estimated Cost:- ` 23,99,549.00<br />
(c) Earnest Money required to be deposited :- ` 48,000.00<br />
(d) Maximum limit of lowest valid rate (-) 15% (Fifteen percent)<br />
4. Time prescribed to complete the work :- 20 th March 2011<br />
5. Total item of work 17 (Seventeen)<br />
6. NIT, General Rules, Special Conditions and <strong>TO</strong>R in pages :- 16 (Sixteen).<br />
7. B.O.Q. in pages : - 4 (Four)<br />
1. Full name of the Tenderer :-<br />
EXECUTIVE ENG<strong>IN</strong>EER<br />
R.C.D., ROAD DIVISION, RANCHI (Rural)<br />
[ <strong>TO</strong> <strong>BE</strong> <strong>FILLED</strong> <strong>IN</strong> <strong>BY</strong> <strong>THE</strong> TENDERERS ]<br />
2. Present address of the Tenderer :-<br />
3. Tenderer's (i) Class ___________ (ii) Reg. No. __________<br />
4. Issued by _________________<br />
_________________________________________________________________<br />
List of documents being submitted with the tender :-<br />
1<br />
Full Signature of Tenderer
TENDERER<br />
ROAD DIVISION, RANCHI (Rural)<br />
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND<br />
SHORT NOTICE <strong>IN</strong>VIT<strong>IN</strong>G RE-TENDER (N.I.T.)<br />
CHAPTER -1<br />
1.1. Sealed tender on approved bill of quantity to be eventually drawn in PWD<br />
Form No. F2 will be received from Registered eligible RCD GOJ contractor of<br />
appropriate category on 27.01.2011 till 3.00 PM by Chief Engineer<br />
(Communication) R.C.D., Jharkhand, Ranchi, the S.E., Road Circle, Ranchi &<br />
Executive Engineer, Road Division, Ranchi (Rural).<br />
1.2. For the Work of Special repair of Bridge (3/1) on Silli River in 3 rd KM of<br />
Silli Banta Hazam Tiker Rangamati Road for 2010-11 at an Estimated cost<br />
of ` 39,99,559.00 and will be opened by Chief Engineer (Communication)<br />
R.C.D., Jharkhand, Ranchi, the S.E., Road Circle Ranchi & Ex. Engineer,<br />
Road Division, Ranchi "(Rural on 27.01.2011 at 3.30 PM. The Tenderer or<br />
their authorized representative whosoever desire may remain present at the<br />
time of opening of tender in the above said offices.<br />
1.3. The work is to be completed in all respect upto 20 th March 2011. The items of<br />
works, Plan, specifications or any other information in connection with the<br />
work can be seen in the office of the Executive Engineer, RCD, Road<br />
Division, Ranchi (Rural) on any working day during office hours before filling<br />
the tender.<br />
1.4. Bill of Quantity can be purchased from the Office of the E.E, Road Division,<br />
Ranchi (Rural), S.E., Road Circle, Ranchi and Chief Engineer<br />
(Communication) R.C.D., Jharkhand, Ranchi on payment of ` 5000.00 (nonrefundable)<br />
in the shape of Account Payee Bank Draft payable at Ranchi only<br />
in favour of Executive Engineer, R.C.D, Road Dvision, Ranchi (Rural) (by<br />
designation), for each work as mentioned in the tender notice on during<br />
working hou` NO tender paper will be sold by any office detailed above on the<br />
date fixed for receiving the tender.<br />
1.5. EARNEST MONEY (E.M.) :- ` 48,000.00.<br />
1.5.1. Tenderers are required to deposit E.M. amounting to ` 48,000.00 in the shape<br />
of Bank Guarantee from a Schedule Bank and valid for 90 (Ninety) days from<br />
the date of receipt of tender, National Saving Certificate (6th issue & 8th<br />
issue), 3/5 Years Post Office Time deposit duly pledged from any Post Office<br />
within the State of Jharkhand, in favour of Executive Engineer, RCD, Road<br />
Division, Ranchi (Rural), by designation only condition apply.<br />
Note :- Insurance Guarantee Bond / Cash / Cheque / Bank Draft or any other<br />
security in place of those specified above shall not be accepted.<br />
1.5.2. Duly pledged E.M. if any lying with the concerned Executive Engineer against<br />
work already completed shall not be adjusted by transfer, In such case the<br />
tenderer is required to get the same refunded and then attach the same with<br />
tender, duly pledged afresh against the work for which tender is filled.<br />
1.5.3. Tender not accompanied with required E.M in the prescribed manner shall be<br />
outrightly rejected and will have no place in the comparative statement.<br />
1.5.4. Clauses 1.5.1 to 1.5.3 shall not apply to tenderers who are exempted from<br />
depositing E.M. Such tenderers must enclose photostat copy of the exemption<br />
certificate issued by the competent authority in this respect.<br />
1.6. Tenderer should quote his / her / their rate on overall items (not item - wise) in<br />
percentage above or below (both in figure & words) over their rates mentioned<br />
in the bill of quantity issued by the authorized officer.<br />
2
1.7. In case the overall rates quoted by the Tenderer is less than 15 (Fifteen) %,<br />
this will be treated as unworkable & the tender may be treated as invalid.<br />
1.8. It will be obligatory on the part of the tenderer to keep their offer open for<br />
acceptance for a period of 180 days from the date of opening of tender.<br />
1.9. Tenderers shall enclose photostat copy of his / her / their registration &<br />
exemption certificate (if any) in absence of which the tenders may not be<br />
considered.<br />
1.10. Sales Tax/Income Tax clearance certificate; Labour License & Letter of<br />
Registration of RCD Govt. of Jharkhand as contractor should be submitted by<br />
the tenderer for works costing more than 10,000/- otherwise it may be<br />
rejected.<br />
1.11. Authority is reserved to reject any or all the tenders received or to allot the<br />
work to one or more contractors without assigning any reason.<br />
1.12. In the case of successful tenderer(hereinafter called contractor) the amount of<br />
E.M will be transferred towards Initial Security Deposit in such a manner so<br />
that the security deposit will be 5% of approved amount of tender & the<br />
remaining 5% shall be recoverable from the subsequent bills.<br />
1.13. The Earnest Money of successful tenderer (hereinafter called the<br />
contractor)which accompany the tender will be forfeited in case the tenderer<br />
declines to sign the agreement or fails to deposit Security Money within 10<br />
days of being called upon to do so, after approval of tender by Competent<br />
Authority Those contractors, who are exempted from depositing E.M,will<br />
deposit initial security money within 10 days of being called upon to do so.lf<br />
they fail to do so or decline to sign the agreement within the stipulated period<br />
requisit sum of money will be forfeited by way of adjustment from any sum to<br />
be paid to him by the department for other works, including his security money<br />
and in addition he will be Black Listed and his registration will be cancelled.<br />
1.14. The N.I.T with general rules and special conditions will form part of the<br />
Contract Documents.<br />
1.15. The following departmental materials/equipments.if supplied by the<br />
department, their issue rates will be charged from the contractor as mentioned<br />
below against each item.Their place of delivery is also indicated. Carriage or<br />
transportation of these materials or equipments to the work site is to be done<br />
by the contractor at his own cost<br />
TENDERER<br />
Particulars Unit Issue/Recovery<br />
Rate<br />
3<br />
Place of<br />
Delivery<br />
Remarks<br />
1 2 3 4 5<br />
Cement Per Bag To be<br />
supplied it<br />
available<br />
Tor Steel Per M.T.<br />
M.S. Rod<br />
(Plain)<br />
Packed<br />
Bitumen<br />
Per M.T.<br />
Per M.T. Ex-Eng. RCD Godown,<br />
Ranchi (Rural)<br />
Hire Charges of Road Roller with Depreciation and Major<br />
Repairs ` .......................<br />
Hire Charges of Road Roller without depriciation & Major
TENDERER<br />
Repairs ` ....................<br />
Empty Cement Bag each @ ` .........................................<br />
Paint @ ` ..................... per Liter<br />
Salary of Roller Driver & Khalasi per day @ ` ...............<br />
Hume Pipe :-<br />
NP3 dia ........................ per Meter<br />
NP2 dia ........................ per Meter<br />
1.16. As per order contained in Letter No.A2-C.W-Tender-17 /93-4605(E) Dtd.<br />
1/9/93 of Engineer-m-Chief cum Addl. Commissioner cum Special Secretary<br />
R.C.D, Govt. Of Bihar. it is essential for the tenderers to have ownership of<br />
the following Road Making Machineries in working condition:-<br />
(A) For works the estimated cost of which is more than `ONE Crore :-<br />
(I) Diesel Road Rollers - 2(two) numbe`<br />
(II) Mini Hot-Mix Plant- 1(one) number.<br />
(Ill) Tar Boiler - 1(one) number.<br />
(B) For works the estimated cost of which is more than `20 (Twenty) Lakh<br />
:-<br />
(I) Diesel Road Roller - 1(one) number.<br />
(II) Tar Boiler -1(one) number.<br />
1.17. Tenderers having ownership of Earth Moving machineries in working<br />
condition will be given preference in allotment of those works the estimated<br />
cost of which is more than `1.00(One)Crore only.<br />
1.18. Tenderers having ownership of HMP Paver Diesel Road Roller (Vibratory &<br />
Normal) and Tar Boiler etc. i e Road making machineries in working condition<br />
may be considered to be given preference in allotment of works, the<br />
estimated cost of which is more than ` 50.00(Fifty) Lacs only<br />
1.19. Tenderers are required to attach with their tenders authorized and valid<br />
certificates regarding their actual ownership of the Road making machineries<br />
and Earth Moving machineries mentioned in clause 1.17 & 1.18, failing which<br />
their claim for allotment of the work may be rejected.<br />
1.20. The authorized and valid certificates of actual ownership of the above<br />
mentioned Road making machineries and Earth Moving machineries to be<br />
attached with the tenders must prove that the tenderer/tenderers<br />
himself/themselves are actual bonafied owners of those Road making<br />
machineries and Earth Moving machineries and the same are in working<br />
condition.<br />
1.21. Payment will be made subject to availability of fund.<br />
TENDERER<br />
4
CHAPTER-II<br />
GENERAL RULES<br />
2.1 The complete Tender with all its enclosures shall be enclosed in sealed<br />
envelop and delivered / sent by Registered Post to the Chief Engineer<br />
(Communication),Ranchi / Superintending Engineer. Road Circle.Ranchi /<br />
Executive Engineer, RCD, Road Division, Ranchi (Rural) as the case may be<br />
so as to reach on or before the date and time as stipulated in N.I.T para 1.1<br />
2.2. The tenderer should mention in his forwarding letter a list of all documents<br />
submitted with the tender.<br />
2.3. The tender shall contain the full name, Contact Number address of residence<br />
and place of business of person or persons filling the tender. In case their is<br />
subsequent change in address, it must be informed to the concerned E.E,<br />
S.E., C.E by Registered Post with A/D.<br />
2.4. All pages of Tender Document, General Rules and Special Conditions must<br />
be initiated at the lower left hand corner, as person, where required in the<br />
tender papers by the tenderer or as person holding power of attorney<br />
authorizing to sign on behalf of the partners before submission of the tender.<br />
2.5. In the event of the tender being submitted by a firm, it must be signed by each<br />
partner thereof, and in the event of absence of any of the partner the power of<br />
attorney authorizing him to do so must be produced on demand. All<br />
signatures shall be dated.<br />
2.6. No tenderer shall file tender for more than one work in one sealed envelope.<br />
Tenderer desirous of submitting tender for more than one work shall submit<br />
tender in separate sealed envelope for each work on appropriate and duly<br />
purchased B.O.Q. The name of the work should be clearly written on the<br />
sealed envelope.<br />
2.7. The rates quoted by the tenderer shall be inclusive of Income Tax, Sales Tax,<br />
Royalty or any other Provincial and. Central Taxes applicable at that time.<br />
2.8. The tenderer shall be presumed to have carefully examined the conditions of<br />
the contract and specifications of the work. The tenderer will also be deemed<br />
to have inspected the work site and to have satisfied<br />
himself/herself/themselves independently as to the nature, extent and<br />
practicality of all works and required approaches & other means of<br />
communication & access, to the site, as referred to lands, buildings, available<br />
for accommodation that may be required for temporary purpose in connection<br />
with the contract of work, also availability of construction materials, location of<br />
work site including its climate & other geological characteristic, availability of<br />
skilled, semi-skilled & un-skilled laboure` The consequences of the lack of<br />
necessary knowledge required for the work will be totally at the risk and cost<br />
of tenderer.<br />
2.9. Normally specification of road, Ministry of Transport & Highways, Government<br />
of India (MORT & H) would be followed for the execution of works. Those<br />
works, which are not covered by MORT & H Specification, R.C.D or Circle<br />
specification will be followed.<br />
2.10. The tenderer will have to submit a program of the work to be executed with<br />
the tender.<br />
2.11 The tenderer will maintain watch guards for the safety of the materials, if any,<br />
supplied by the department at his own cost.<br />
2.12. All labourers engaged in the work are to be paid as per latest Minimum<br />
5
Wages Act. in force at the time of execution of contract work.<br />
2.13. The tenderer will provide to the labourers ,hut for shelter, drinking water safety<br />
and worksite and medical facilities and keep the site clean at his own cost.<br />
2.14 Extension of time on valid reasons may be granted by the competent<br />
authorities as per Government rules and circulars in force and as revised from<br />
time to time.<br />
2.15. The tenderer must return all the tender papers duly signed on each page<br />
while submitting the tender paper, failing which the same may be declared<br />
invalid.<br />
2.16. On receipt of the written order from the concerned Executive Engineer, the<br />
successful tenderer will first deposit the balance amount of initial security<br />
deposit (ISD)within the specified period of ten days and then enter into an<br />
agreement with Executive Engineer on the basis of the stipulation in the<br />
approved tender documents along with subsequent terms as mutually'agreed<br />
upon before the issue of work order. Written order to commence the work<br />
shall be issued by the Executive Engineer after acceptance of the agreement<br />
by the competent authority.<br />
2.17. (a) lf the rate quoted by the tenderer above the BOQ rate and the<br />
competent authority approved the rate, then the enhancement over the<br />
BOQ rates shall not be applicable over the cost of bitumen.<br />
TENDERER<br />
(b) It the tenderer quotes the rate below the BOQ rate and the competent<br />
officer approved it, then the reduction over the BOQ rate shall be<br />
applicable on all items of work including the cost of bitumen.<br />
6
CHAPTER- III<br />
SPECIAL CONDITIONS FOR F2 / H CONTRACT<br />
3.1. The successful tenderer (hereinafter called the Contractor must maintain a<br />
site order book at each work site which will be produced when asked for by<br />
the departmental Officers for needful. Any order or instruction passed on the<br />
site order book by the Inspecting officer should be communicated to the SDO,<br />
EE, SE and concerned inspecting Officers by the J.E in charge of the work. A<br />
copy of the same should be kept by the J.E. The site order book may be<br />
submitted to E.E with running account bills ,if required, but must be submitted<br />
with final bill.<br />
3.2. The contractor should always remain available at the work site ,but where it is<br />
not so possible for him to do so, he must appoint a representative for the<br />
purpose who would be duly authorized by the contractor to receive<br />
instructions and carry out instruction of departmental officers .and also to<br />
receive lette` He may also delegate him any other power as he thinks fit ,but<br />
in every case he will inform immediately the concerned J.E.S.D.O and E.E<br />
regarding appointment of such representative along with his name contact<br />
number, address and identity in writing by Regd Post with A/D.<br />
3.3 If the Royalty clearance certificate for mines/minerals used in the work is not<br />
produced with the bill, Royalty will be deducted from the concerned running<br />
bill, at the rates prevailing at the time of execution of work, by the<br />
department. Production of royalty clearance certificate along with the final bill<br />
is a must, failing which final bill will be neither passed nor paid, and for such<br />
non-payment or delay in payment, the whole and sole responsibility will be of<br />
the contractor alone.<br />
3.4 Recovery of cost for materials supplied by the department will be made at the<br />
rates stipulated in the N.I.T and or agreement. For departmental materials<br />
found to be in excess of actual consumption calculated on the basis of<br />
approved design, drawing and specifications and/or field or laboratory tests<br />
with the contractor, recovery will be made at penal rate or the market rate<br />
prevailing at the time of effecting recovery plus 10%, which ever is higher as<br />
per rules, provided the same is not returned back by him in good and<br />
acceptable conditions to the departmental stores at his own cost.<br />
3.5 The contractor shall provide sufficient plant, equipments and labour and shall<br />
work such hours and shifts as may be necessary to maintain the progress as<br />
per schedule. The working and shift hours should comply with all Govt, rules<br />
and regulations in force from time to time during the entire period of execution<br />
of the contract work.<br />
3.6 The contractor shall make adequate arrangement for the safety of the<br />
labourers during execution of the contract work. He will be responsible for any<br />
compensation for the same and will have to be paid by him as decided by the<br />
competent authority.<br />
3.7 The-contractor should get the sample of all the materials approved by the E/l,<br />
before collecting the same for use at work site.' The sample in sealed glass<br />
jars shall be kept in the custody of the E/l.<br />
3.8 The contractor shall have to get tested the strength of cement concrete(both<br />
plain & reinforced)for each days casting as per IRC codes. Although<br />
achievement of the prescribed cube strength is a must, concrete found to<br />
have lower value may be rejected or accepted at suitable reduced rate under<br />
7
specific orders of the competent authority. The cost of concrete cubes,<br />
moulds, carriage of cubes to and from the testing laboratory and all other<br />
incidental charges incurred in this regard shall be borne by the contractor.<br />
3.9 The contractor shall, if required by the E/l, must arrange for test of other<br />
materials at his own cost. If the quality of materials appears to be inferior or<br />
the portion of the work is found to be defective or unsound ,the contractor may<br />
be asked to remove and or pull down and re-execute the same at his own<br />
cost or in case such defect is found out due to departmental fault he shall be<br />
paid at suitably reduced rates for that item of work .The contractor shall bear<br />
all cost in this regard.<br />
3.10 For works exceeding ` 50 (Fifty) Lacs, it will be obligatory for the contractor to<br />
keep a properly equipped testing laboratory near the work site at his own cost<br />
.where he will get the samples tested by the department<br />
3.11 All rejected materials will have to be removed from the site by the contractor,<br />
after their rejection, within seven days from the date of written order of E.E,<br />
failing which the E.E will get these removed in whatsoever manner he thinks<br />
fit and will recover the cost involved for such removal from the contractor after<br />
lapse of seven days time<br />
3.12 M.S.Bars, joint angles etc. will be issued in length available in the<br />
departmental stores. Their cut pieces in length less than 1/10m shall not be<br />
taken back. While assessing the quantity of consumption in the work, wastage<br />
in such materials may be allowed up to maximum limit of 5% after due<br />
consideration by the department Cost of quantity allowed as wastage shall be<br />
recovered at issue rate of such materials as prescribed in para 1.15 of N.I T.<br />
3.13 Issue rate of supply of Bitumen as mentioned in Para 1.15,includes cost of its<br />
drums, hence the empty bitumen drums are to be returned back in good<br />
condition to the stores from where it was issued, failing which its cost will be<br />
recovered from the bill of contractors @ `80/-(Eighty) only per drum.<br />
3.14 If the actual lead of materials like stone metal, stone chips, boulder, bricks,<br />
sand , moorum etc is found to be less than the lead provided in the BOQ, then<br />
its payment will be made proportionately on reduced rate. In case the actual<br />
lead is more than the lead provided in the BOQ it will be mandatory to obtain<br />
prior consent of the authority who approved the tender, before<br />
commencement of supply of such materials from the increased lead, else no<br />
claim of contractor will be entertained for enhanced lead.<br />
3.15. It will be essential to do all items of road works (Original work) in sequence<br />
from one end in scientific way so as to complete the works up to next end. It<br />
should not be done in hazarded way such as collection of materials in one<br />
Kilometer, box- cutting in other Kilometers, consolidation work in patches etc.,<br />
which leads to progress of all Items of work simultaneously Kilometerwise.quantity-<br />
wise always from one end. So that the complete road is<br />
available for use in one strech from that end after completing the work in<br />
particular Kilometer,and then only take up the work In next Kilometer.<br />
3.16 After completion of work the contractor will remove all debris and fill up vats<br />
etc.,as desired by E/l and leave the site clear and tidy at his own cost.<br />
3.17 The department reserves the right of omitting or suspending the construction<br />
or changing site etc., if considered necessary at any stage.<br />
3.18 The following items shall not be paid extra and the tendered rates shall be<br />
inclusive of those:-<br />
(i) Site clearance such as clearing the shrubs, bushes, wood-undergrowth &<br />
8
small trees not exceeding 12" in girth measured at 3' above the ground.(ii)<br />
Setting out works, profile, lay-out etc. (iii) Venderised battering or benching or<br />
excavation of foundation trenches, (iv) Forming or leaving "Toll - Tate" or<br />
witness in borrow pits and their removal after measurement. However<br />
deduction will be made in quantity of earth work for those.(v) Excavation for<br />
inserting of planking and shuttering.(vi) Forming (or leaving) stop in sides of<br />
deep excavation & their removal after measurement.(vii) Bailing out rain<br />
water/and or surface water in case the excavated foundation trenches were<br />
filled up by these during entire period of construction.(viii) Removing of spoils<br />
that of fells in excavation, (ix) Making vats, platform, channel etc.<br />
3.19 The contractor will have to use his own machinery for completion of the work<br />
within the time stipulated in the contract, the carriage of machinery to different<br />
sites under this contract from one place to another for this work will be the<br />
responsibility of the contractor and all expenses in this regard will be born by<br />
him.<br />
3.20 Other machinery like asphalt, mixer, tar-boiler, pump, vibrator, concrete mixer<br />
etc., if available in the stores of the concerned division , may be issued to the<br />
contractor on his written request(on hire or free of cost as the case may be)on<br />
the terms quoted in his tender cove` Their hire charges, if applicable, along<br />
with its called expenses as detailed below in sub-paras 3.20.1 to 3.20.10<br />
which are to be for departmental machinery. The condition laid down in subpara<br />
3.20.1 to 3.20.10 will apply to departmental road roller issued to<br />
contractor.<br />
3.20.1 Hire charges of roller has been indicated in Para 1.15 of N.I.T. Hire charges of<br />
other machineries will be communicated on , and the same shall have to be<br />
accepted by the contractor. Prayer for reduction of hire charges so fixed shall<br />
not be entertained.<br />
3.20.2 Carriage and running charges of machineries, if any, including on incidental<br />
and contingent charges for transporting the same from place of delivery to the<br />
work site and their return to the place of issue, shall be borne by the<br />
contractor on his own cost.<br />
3.20.3 Salary of roller driver, khalasi, operator of other machineries will be borne by<br />
the contractor for the period the machineries in question remaining with the<br />
contractor. The period spent on it's transport from place of issue to work site<br />
and back shall also be for that purpose. It will be the responsibility of the<br />
contractor to obtain necessary information regarding salary of the<br />
departmental staff.<br />
3.20.4 The cost of fuel and lubricants for running the machinery will be borne by the<br />
contractor.<br />
3.20.5 The plants and machineries issued on hire or free of cost to the contractor by<br />
the department will have to be maintained properly. In addition to its general<br />
daily maintenance and in case of roller, it shall also be cleaned in a week &<br />
stores required for cleaning i.e. kerosene oil, jute, grease, mobil etc. will have<br />
to be supplied by the contractor at his own cost The Mobil oil and C.Oil will<br />
have to be changed after 200(two hundred) & 1000(one thousand) running<br />
hours respectively at his own cost.The quality of all the above materials, used,<br />
must be-approved by the E/l before use.<br />
3.20.6 During the operation period, while the machinery is on work with the<br />
contractor, all minor repairs or break down .costing up to `1000/- at a time will<br />
be the responsibility of the contractor and such repair should be completed<br />
within a maximum period of three days under intimation to concerned J.E.<br />
S.D. O & E.E.<br />
9
3.20.7 In case the contractor fails to supply the required fuels, lubricants and other<br />
stores required for running and proper maintenance of the departmental<br />
machineries, issued to contractor on hire or free of cost for using the same in<br />
the work, the same shall be supplied by the department & full cost, inclusive<br />
of handling, procurement and all other incidental charges shall be recovered<br />
from the contractor from next immediate bill. It will be responsibility of the<br />
concerned J.E and S.D.O to keep the contractor, E.E. and S.E informed of<br />
such expenses well in time<br />
3.20.8 If the departmental road roller remains idle due to contractor's fault, it's cost<br />
will be recovered from the Contractor as per Schedule of Rate for this item<br />
applicable at the time.<br />
3.20.9 Hire, establishment and other charges for the Idle or repair periods shall be<br />
borne by the contractor.<br />
3.20.10 In the event of loss or theft of the machinery or any of its components<br />
in part or full when it stands issued to the contractor, the value of such lost<br />
articles will be recovered from the contractor at the price fixed by the C.E. or<br />
E.G concerned.<br />
3.21 CLAIM NOT ADMISSIBLE under following circumstances :-<br />
a)Extra Items of work done without written order of competent authority :-<br />
b)In case Sudden fluctuation and / or increase In rates of labour, materials,<br />
royalty, various taxes, railway freight, fuel, lubricants, carriage cost etc. at any<br />
stage of the work<br />
c) Short supply and / or non-supply and / or delay in supply of departmental<br />
materials and / or equipments<br />
d)Non-availability of labour of any category required for the work.<br />
e)Labour sitting idle due to any reason / cases.<br />
f) Delay in communication regarding any charges or modification in design,<br />
drawing, specification, alterations, etc.<br />
g)Loss sustained due to :-<br />
1) Acts of enemies including agitation by <strong>Public</strong> and Riot.<br />
2) Transportation and Procurement difficulties.<br />
3) Natural Calamities.<br />
4) Any other circumstances out of human control.<br />
3.22 In case Bulk Bitumen is issued by the department to the agency, no extra cost<br />
will be paid on account of lifting the same from departmental godown in<br />
drums, empty them and carriage of the same from the R.C.D godown to the<br />
site of work and these operations will have to be done by the contractor at his<br />
own cost.<br />
3.23 Proportionate deduction shall be made from the bill of the contractors for less<br />
leads of stone aggregates and moorum from their sources of actual receipt in<br />
comparison to those provided in the B.O.Q, but no extra payment will be<br />
made for more leads if any actually involved unless approved in advance by<br />
the competent authority.<br />
10
3.24 Extension of time, if justified, may be granted by the different competent<br />
officers for different periods of time, for different types and values of works as<br />
noted below, otherwise penalty for non-fulfillment of the contract may be<br />
imposed, after giving due consideration for poor progress at different stages<br />
of works without valid and satisfactory reasons. More payments of running<br />
account bills, keeping back certain amount for non-extension of time, does not<br />
qualify as a valid ground for grant of Extension of time as a matter of right.<br />
The Officer granting such extension of time has the full liberty to wait &<br />
examine the circumstances which led to such requirement for fulfillment of<br />
contract, and use his own discretion for passing final orders, which shall be<br />
treated as final and shall be binding and conclusive for the contractor.<br />
1. Executive Engineer i) Up to Any period for Repair Works.<br />
RCD.Road Division.Ranchi ii) For Any period for Original works valued up<br />
(Rural) to ` 10,000/-<br />
iii) Up to 50 % above the contract period for<br />
original work valued between `10.000/- to<br />
50,000/-<br />
2. Superintending Engineer i) Up to Any period for Original Works of value<br />
RCD.Road Circle.Ranchi between Rs 10 to 50 thousand.<br />
ii) Up to 100 % above the contracted period for<br />
the original work of value between 50,000/- to<br />
50 lakhs.<br />
3. Chief Engineer(Com.), RCD i) Up to Any other period for work up to<br />
Jharkhand, Ranchi. `5 lacs.<br />
ii) 100 % above the contracted period in case<br />
of Original Works of `5 lakh to 10 lac<br />
iii) For granting extension beyond 100% of<br />
time of completion in respect of work of the<br />
value between ` 5 Lacs to `10 Lacs and for<br />
any extension to work of value above ` 10<br />
Lacs,the Chief Engg. will grant extension after<br />
bringing into the notice of the Government.<br />
3.25 The contractor shall, if required by the E/l arrange to test materials at site or<br />
get them tested in recognised departmental testing laboratories at his own<br />
cost in order to prove their soundness and sufficiency as per specifications<br />
laid down. The number of tests required for different items will be specified by<br />
the E/l.<br />
3.26 The estimated output of the roller for 8 hours wotking is as follows :-<br />
Compaction of Moorum / Gravel. 566.00 m3<br />
Compaction of Earth Work. 566.00 m3<br />
Consolidation of Grade - I 25.00 m3<br />
Consolidation of Grade-II 25.00 m3<br />
Consolidation of Grade-III 25.00 m3<br />
20 mm thick Pre-mixing 500.00 m2<br />
Surface Dressing. 650.00 m2<br />
3.27 The Contractor -will have to give an affidavit for the Hot Mix Plant paver<br />
finisher, vibratory roller and other equipments shown as credential deployed<br />
for completion of this specific work on top most priority basis.<br />
11
Bill of Quantity for Special Repair of Bridge (3/1) on Silli River in 3rd Km of Silli Banta Hazam Tiker<br />
Rangamati Road<br />
Estimated Cost : Rs. 23,99,549.00<br />
Earnest Money : Rs. 48,000.00 Cost of B.O.Q. : Rs. 5,000.00<br />
Time of Completion : 20 th March 2011<br />
Sl.<br />
No.<br />
Description of Item Unit Qty Rate (in Rs.) Amount (in<br />
(in<br />
Figures)<br />
(in Words) Rs.)<br />
1 Earthwork in excavation in<br />
foundation trenches in ordinary<br />
soil (vide classification of soil<br />
item-A) and disposal of<br />
excavated earth as obtained to a<br />
distance upto 50M including all<br />
lifts, levelling, ramming the<br />
foundation trenches, removing<br />
roots of trees, shurbs all<br />
complete as per approved<br />
design, building specification and<br />
direction of E/i.<br />
2 Providing P.C.C. M-150 in<br />
nominal mix of (1:2:4) in<br />
foundation with approved quality<br />
of stone chips 20mm to 6mm<br />
size graded and clean coarse<br />
sand of F.M. 2.5 to 3 including<br />
screning shuttering mixing<br />
cement concrete in mixer and<br />
placing in position vibrating<br />
striking, curing taxes and royalty<br />
all complete as per building<br />
specification and direction of<br />
3<br />
4<br />
Engineer-in-charge.<br />
Providing rough dressed random<br />
rubble stone masonary in<br />
CM(1:3)in foundation with<br />
approved quality of coarse sand<br />
or requisite F.M.(2.5 to 3.0)<br />
washed and screened with raking<br />
out joints,curing, scaffolding and<br />
its removal where required<br />
including royalty and all taxes<br />
etc.complete job as per<br />
specification and direction of E/I.<br />
Providing random rubble stone<br />
masonry in cement mortar (1:3)<br />
in super structure and plinth with<br />
hammer dressed stone of less<br />
than 0.03M 3 in volume and clean<br />
coarse sand of F.M. 2 to 2.5<br />
including cost of screening,<br />
raking out joints to 20mm depth,<br />
curing, taxes and royalty all<br />
complete as per building<br />
specification and direction of<br />
Engineer in Charge.<br />
Per M 3 432.94 28.90<br />
Per M 3 192.428 3919.55<br />
Per M 3 339.711 2073.01<br />
Per M 3 151.553 2126.90<br />
12<br />
Rupees<br />
Twenty<br />
Eight and<br />
Paise Ninety<br />
only<br />
Rupees<br />
Three<br />
Thousand<br />
Nine<br />
Hundred<br />
Nineteen<br />
and Paise<br />
Fifty Five<br />
only<br />
Rupees Two<br />
Thousand<br />
Seventy<br />
Three and<br />
Paise One<br />
Only<br />
Rupees Two<br />
Thousand<br />
One<br />
Hundred<br />
Twenty Six<br />
and Paise<br />
Ninety Only<br />
12512.00<br />
754231.00<br />
704224.00<br />
322338.00
5 Supplying and laying good<br />
quality of stone metal filter<br />
(20mm to 63mm size) in the rock<br />
toe, heel trenches, toe drain as<br />
per design and drawing including<br />
the cost of materials, royalty all<br />
taxes etc. but excluding the cost<br />
of carriage all complete as per<br />
specification and direction of E/I.<br />
6 Providing and laying clean sand<br />
in filling in foundation trenches<br />
including ramming as well as<br />
royalty and all taxes etc. as per<br />
specification and direction of E/I<br />
7. Providing P.C.C. M-100 with<br />
nominal mix of (1:3:6) in<br />
foundation with approved quality<br />
of stone metal grade-III (50mm to<br />
25mm size) clean coarse sand of<br />
F.M. 2.5 to 3 including screening<br />
shuttering mixing cement<br />
concrete in mixer and placing in<br />
position vibrating striking curing<br />
taxes and royalty all complete as<br />
per building specification and<br />
direction of Engineer in charge.<br />
8 (A) Providing for pitching with<br />
stone boulder duly packed in<br />
slope and apron with materials<br />
within 150M of work site and all<br />
lifts as per specification and<br />
direction of E/I including cost of<br />
material carriage boulder all<br />
completed in<br />
(B) Providing for pitching with<br />
stone boulder duly packed in<br />
slope and apron with materials<br />
within 150M of work site and all<br />
lifts as per specification and<br />
direction of E/I material<br />
departmental material promoted<br />
at site.<br />
9 Providing R.C.C. M 200 with<br />
nominal mix of (1:1½:3) in beam<br />
of all types with approved quality<br />
of stone chips 20mm to 6 mm<br />
size graded and clean coarse<br />
sand of F.M. 2.5 to 3 including<br />
screening, shuttering, mixing<br />
cement concrete in mixer and<br />
placing in position, vibrating<br />
striking, curing (but excluding the<br />
cost of reinforcement, taxes and<br />
royalty all complete as per<br />
building specification and<br />
direction of E/I.<br />
Per M 3 73.2 887.83<br />
Per M 3 93.728 225.61<br />
Per M 3 39.375 2886.43<br />
Per M 3 208.452 591.08<br />
Per M 3 60.00 273.37<br />
Per M 3 4.7 5760.68<br />
13<br />
Rupees<br />
Eight<br />
Hundred<br />
Eighty<br />
Seven and<br />
Paise Eigty<br />
Three only<br />
Rupees Two<br />
Hundred<br />
Twenty Five<br />
and Paise<br />
Sixty One<br />
Only<br />
Rupees Two<br />
Thousand<br />
Eight<br />
Hundred<br />
Eighty Six<br />
and Paise<br />
Forty Three<br />
Only<br />
Rupees Five<br />
Hundred<br />
Ninety One<br />
and Paise<br />
Eight Only<br />
Rupees Two<br />
Hundred<br />
Seventy<br />
Three and<br />
Paise Thirty<br />
Seven Only<br />
Rupees Five<br />
Thousand<br />
Seven<br />
Hundred<br />
Sixty and<br />
Paise Sixty<br />
Eight Only<br />
64989.00<br />
21146.00<br />
113653.00<br />
175950.00<br />
16402.00<br />
27075.00
10 Providing Tor steel reinforcement<br />
of 10mm, 12mm to 16mm dia<br />
bars as per approved design and<br />
drawing excluding carriage of<br />
bars to work site cutting bending<br />
and binding with annealed wire<br />
with cost of wire removal of rust,<br />
placing the rods in positing all<br />
complete as per building<br />
specification and direction of E/I.<br />
valid for Sai & TATA Steel.<br />
11 Providing 12mm cement plaster<br />
(1:3) with clean coarse sand of<br />
F.M. 1.5 including screening,<br />
curing with all leads and lifts of<br />
water scaffolding, taxes and<br />
royalty all complete as per<br />
building specification and<br />
direction of E/I.<br />
12 Construction of precast RCC<br />
railing of M30 Grade, aggregate<br />
size not exceeding 12mm, true to<br />
line and grade, tolurence of<br />
vertical RCC post not to exceed<br />
in 1 in 500, centre to centre<br />
spacing between vertical post for<br />
expansion, complete as per<br />
approved drawings and technical<br />
specifications.<br />
13 Proving two coats of plastic<br />
emulsion paint of approved<br />
shade and make over a coat of<br />
cement primer over new surface<br />
including preparing plastered<br />
surface by rubbing smooth with<br />
pumice stone or fine sand paper<br />
applying putty wherever required<br />
scaffolding washing of floor and<br />
taxes all complete as per building<br />
specification and direction of E/I<br />
14 Providing granular sub-base in<br />
one or more layers over the<br />
prepared sub-grade compacted<br />
by road roller so as to achieve 95<br />
to 100% maximum dry density at<br />
O.M.C. including uniformily<br />
mixing the required quantity of<br />
water including cost of supply<br />
and carriage of water with all<br />
leads and lifts, finishing the<br />
surface to proper grade as per<br />
specification and direction of E/I.<br />
(a) with approved quality with<br />
moorum<br />
15 Providing weep hole with dry<br />
graded stone filter of 20mm to<br />
40mm size in abutment and wing<br />
wall as per specification and<br />
direction of E/I<br />
MT 0.39 43124.18<br />
Per M 2 228.0 78.90<br />
Per Mtr 75.2 1275.0<br />
Per M 2 152.40 82.50<br />
Per M 3 80.0 314.02<br />
No. 88 96.78<br />
14<br />
Rupees<br />
Forty Three<br />
Thousand<br />
One<br />
Hundred<br />
Twenty Four<br />
and Paise<br />
Eighteen<br />
Only<br />
Rupees<br />
Seventy<br />
Eight and<br />
Paise Ninety<br />
Only<br />
Rupees One<br />
Thousand<br />
Two<br />
Hundred<br />
Seventy<br />
Five Only<br />
Rupees<br />
Eighty Two<br />
and Paise<br />
Fifty Only<br />
Rupees<br />
Three<br />
Hundred<br />
Fourteen<br />
and Paise<br />
Two only<br />
Rupees<br />
Ninety Six<br />
and Paise<br />
Seventy<br />
Eight only<br />
16818.00<br />
17989.00<br />
95880.00<br />
12573<br />
25122.00<br />
8517.00
16 Providing and fixing at site<br />
precast 15 to 20mm dia and<br />
90cm long R.C.C. (1:2:4)<br />
boundary pillar including cost of<br />
earth cutting fixing the post<br />
properly in cement concrete<br />
block (1:4:8) with 40mm nominal<br />
size graded stone metal and<br />
clean coarse sand of approved<br />
quality including cost of<br />
shuttering curing carriage<br />
finishing making platform<br />
including bending binding and<br />
cost of reinforcement all<br />
complete as per I.R.C.<br />
specification and direction of E/I.<br />
17 Painting posts with two coats of<br />
enamel paint of approved shade<br />
and make after cleaning the<br />
surface thoroughly at site all<br />
complete as per direction of E/I.<br />
No 60 160.51<br />
Per M 2 10.38 48.07<br />
15<br />
Rupees One<br />
Hundred<br />
Sixty and<br />
Paise Fifty<br />
One Only<br />
Rupees<br />
Forty Eight<br />
and Paise<br />
Seven Only<br />
9631.00<br />
499.00<br />
2399549.00<br />
Executive Engineer,<br />
Road Construction Department,<br />
Road Division, Ranchi (Rural)
<strong>THE</strong> TENDERERS ARE REQUIRED <strong>TO</strong> QUOTE <strong>THE</strong>IR RATES <strong>IN</strong> <strong>THE</strong> FOLLOW<strong>IN</strong>G MANNER<br />
1. .....................................................%(Percent) abovo on the Estimated rate as<br />
written in the Bill Of Quantity.<br />
2. .................................................% (Percent) below on the Estimated rate as<br />
written in the Bill Of Quantity.<br />
3. On the Estimated rate as written in the Bill Of Quantity<br />
{ Strike - out the Items which are not applicable }<br />
16<br />
Signature Of the Tenderer<br />
<strong>THE</strong> TENDERERS ARE REQUIRED <strong>TO</strong> FURNISH <strong>THE</strong> FOLLOW<strong>IN</strong>G <strong>IN</strong>FORMATION<br />
1. Name and address of the Tenderer :-<br />
2. S.Tax & I.Tax Certificates attached :-<br />
3. Earnest Money Deposited & N.S.C /<br />
Pass Book attached :-<br />
4. Registration No. & Date/Year :-<br />
5. Time Of Completion :-<br />
6. Condition/s if any :-<br />
7. Letter of Registration as<br />
Contractor attached :-<br />
8. Labour Licence attached<br />
9. Authorised & valid certificate/s regarding the ownership of Road Construction &<br />
Earth Moving machineries in working condition attached for :-<br />
a} Hot Mix / Mini Hot Mix Plant :-.............................................Nos.<br />
b} Paver :-.............................................Nos.<br />
c) Tripper :-.............................................Nos.<br />
b} Diesel Road Roller :-.............................................Nos.<br />
c} Tar Boiler :-.............................................Nos.<br />
d} Earth Moving Machineries :-.............................................Nos.<br />
3.28 ( For Tenderer offering to use his/her/their own Road Construction & Earth<br />
Moving machinery as per Clause 1.16 to 1.20 of N.I.