specific orders of the competent authority. The cost of concrete cubes,<br />

moulds, carriage of cubes to and from the testing laboratory and all other<br />

incidental charges incurred in this regard shall be borne by the contractor.<br />

3.9 The contractor shall, if required by the E/l, must arrange for test of other<br />

materials at his own cost. If the quality of materials appears to be inferior or<br />

the portion of the work is found to be defective or unsound ,the contractor may<br />

be asked to remove and or pull down and re-execute the same at his own<br />

cost or in case such defect is found out due to departmental fault he shall be<br />

paid at suitably reduced rates for that item of work .The contractor shall bear<br />

all cost in this regard.<br />

3.10 For works exceeding ` 50 (Fifty) Lacs, it will be obligatory for the contractor to<br />

keep a properly equipped testing laboratory near the work site at his own cost<br />

.where he will get the samples tested by the department<br />

3.11 All rejected materials will have to be removed from the site by the contractor,<br />

after their rejection, within seven days from the date of written order of E.E,<br />

failing which the E.E will get these removed in whatsoever manner he thinks<br />

fit and will recover the cost involved for such removal from the contractor after<br />

lapse of seven days time<br />

3.12 M.S.Bars, joint angles etc. will be issued in length available in the<br />

departmental stores. Their cut pieces in length less than 1/10m shall not be<br />

taken back. While assessing the quantity of consumption in the work, wastage<br />

in such materials may be allowed up to maximum limit of 5% after due<br />

consideration by the department Cost of quantity allowed as wastage shall be<br />

recovered at issue rate of such materials as prescribed in para 1.15 of N.I T.<br />

3.13 Issue rate of supply of Bitumen as mentioned in Para 1.15,includes cost of its<br />

drums, hence the empty bitumen drums are to be returned back in good<br />

condition to the stores from where it was issued, failing which its cost will be<br />

recovered from the bill of contractors @ `80/-(Eighty) only per drum.<br />

3.14 If the actual lead of materials like stone metal, stone chips, boulder, bricks,<br />

sand , moorum etc is found to be less than the lead provided in the BOQ, then<br />

its payment will be made proportionately on reduced rate. In case the actual<br />

lead is more than the lead provided in the BOQ it will be mandatory to obtain<br />

prior consent of the authority who approved the tender, before<br />

commencement of supply of such materials from the increased lead, else no<br />

claim of contractor will be entertained for enhanced lead.<br />

3.15. It will be essential to do all items of road works (Original work) in sequence<br />

from one end in scientific way so as to complete the works up to next end. It<br />

should not be done in hazarded way such as collection of materials in one<br />

Kilometer, box- cutting in other Kilometers, consolidation work in patches etc.,<br />

which leads to progress of all Items of work simultaneously Kilometerwise.quantity-<br />

wise always from one end. So that the complete road is<br />

available for use in one strech from that end after completing the work in<br />

particular Kilometer,and then only take up the work In next Kilometer.<br />

3.16 After completion of work the contractor will remove all debris and fill up vats<br />

etc.,as desired by E/l and leave the site clear and tidy at his own cost.<br />

3.17 The department reserves the right of omitting or suspending the construction<br />

or changing site etc., if considered necessary at any stage.<br />

3.18 The following items shall not be paid extra and the tendered rates shall be<br />

inclusive of those:-<br />

(i) Site clearance such as clearing the shrubs, bushes, wood-undergrowth &<br />

8