8.<br />
emulsion pressure distributor at<br />
the rate of 0.2Kg Per Sq.Mtrs on<br />
the prepared bitumious clean<br />
granular surface clean with<br />
mechanical broom. Providing<br />
light, barriers, danger signals,<br />
chowkidar, making and<br />
maintaining diversion, traffic<br />
regulation, hire & running charges<br />
of all machinery with depredation<br />
and major/minor repair POL and<br />
other lubricants. Pay and<br />
machinery, labour, tools and<br />
plants all taxes & royalties<br />
incidental charges, but excluding<br />
cost of cleaning the road surface<br />
all complete job as per approved<br />
design, drawing as per MOST<br />
specification(4th revision) clause<br />
5.3 and relevant clauses and<br />
direction of E/l (consumption of<br />
Bitumen 75.68MT)<br />
Providing and laying semi dense<br />
bituminous concrete with 100-120<br />
TPH batch type HMP producing<br />
an average output of 75 tonnes<br />
per hour using crushed<br />
aggregates of specified grading,<br />
premixed with bituminous binder<br />
@ 4.5 to 5 percent of mix and<br />
filler, transporting the hot min to<br />
work site, laying with a hydnistatic<br />
paver finisher with sensor conrol<br />
to the required grade, level and<br />
alignment, rolling with smoomh<br />
wheeled, vibratory and tandon<br />
rollers to achive the desire at<br />
compaction as per MORTH<br />
specification clause No. - 508<br />
complete in all resects for grading<br />
(II).<br />
9. Providing and laying of hot<br />
applied thermoplastic compound<br />
2.5 mm thick including<br />
reflectorising glass beads @ 250<br />
gms per sqm area, thickness of<br />
2.5 mm is exclusive of surface<br />
applied glass beads as per<br />
IRC:35 .The finished surface to be<br />
level, uniform and free from<br />
streaks and hole and as per<br />
direction of Engineer- In- Charge.<br />
10. Supplying and installation of<br />
delineatotor (road way indicators,<br />
hazard markers, objectmarkers),<br />
80-100 cm high above ground<br />
level, painted black and white in<br />
each 53.63 7165.85<br />
Per M 3 78 376.00<br />
Per M 3 207 517.00<br />
14<br />
Fifteen Only<br />
Rupees<br />
Seven<br />
Thousand<br />
One<br />
Hundred<br />
Sixty Five<br />
and Paise<br />
Eighty Five<br />
Only<br />
Rupees<br />
Three<br />
Hundred<br />
Seventy Six<br />
Only<br />
Rupees<br />
Five<br />
Hundred<br />
Seventeen<br />
Only<br />
384305.00<br />
29328.00<br />
107019.00