Bill of Quantity for Emergent protection of road embankment and construction of approach road of<br />

Halmad Bridge in Km 24th of Jonha Purabdih Road<br />

Estimated Cost : Rs. 3999559.00<br />

Earnest Money : Rs. 80,000.00 Cost of B.O.Q. : Rs. 5000.00<br />

Time of Completion : upto 1 month<br />

1.<br />

Sl.<br />

No.<br />

2.<br />

3.<br />

Description of Item Unit Qty Rate Amount (in<br />

Rs.)<br />

In figure In words<br />

Earth work in road embankment<br />

and shoulders with ordinary soil<br />

(vide classification of soil item -A)<br />

obtained from borrow pits or any<br />

other sources free from logs,<br />

stumps roots, rubbish or any other<br />

ingredients likely to deteriorate or<br />

effect the stability of the<br />

embankment including breaking<br />

the clods maximum to 60 mm<br />

cube, placing the earth in layers<br />

not exceeding 225 in loose<br />

thickness, rough dressing<br />

including cost of cutting and<br />

removing shurbs and roots falling<br />

in borow area all complete as per<br />

approved design specification and<br />

direction of E/I (Mode of<br />

measurement - sectional<br />

measurement after required<br />

completion with initial lead 10M &<br />

lift 1.5M.<br />

Consolidation of road<br />

embankment in all kinds of soil<br />

including hard and gravelly soil,<br />

soil mixed with boulders by<br />

manual labour in layers not<br />

exceeding 150mm in loose<br />

thickness with C.I. hammer so as<br />

to achieve 85% of maximum dry<br />

density at O.M.C. including<br />

uniformly mixing the required<br />

quantity of water with all leads<br />

and lifts finishing the surface to<br />

proper grade, camber or super<br />

elevation, including cost of<br />

providing light, barrier, danger<br />

signal, chowkidar, all complete as<br />

per specification and direction of<br />

E/I.<br />

Providing stone metal grade-ll<br />

(63mm to 45mm size) with<br />

screening materials crushable<br />

type such as moorum as gravel in<br />

road embankment in proper<br />

grade, camber or super elevation<br />

laid loose in thickness (1.33 times<br />

the desired completed _^<br />

Per M 3 903.21 126.63<br />

Per M 3 903.21 11.69<br />

Per M 3 160.88 1251.05<br />

12<br />

Rupees<br />

One<br />

Hundred<br />

Twenty Six<br />

and Paise<br />

Sixty Three<br />

only<br />

Rupees<br />

Eleven and<br />

Paise Sixty<br />

Nine Only<br />

Rupees One<br />

Thousand<br />

Two Hundred<br />

Fifty One and<br />

Paise Five<br />

Only<br />

114373.00<br />

10559.00<br />

201269.00