Providing rough dressed course<br />
stone masonry in cement mortar<br />
(1:3) in superstructure with<br />
approved quality of coarse sand<br />
of requisite F.M. (2.5 to 3.0)<br />
washed and screened with<br />
ranking out joints, curing,<br />
scaffolding and its removal<br />
wherever required including<br />
royalty and all taxes etc. complete<br />
job as per specification and<br />
direction of E/l.<br />
Providing and laying P.C.C. with<br />
nominal mix of (1:2:4) in<br />
superstructure of various<br />
components of canal of<br />
embankment structure with<br />
approved quality of 20mm graded<br />
coarse aggregate of required<br />
grade (as per design) and<br />
approved quality of sand of of<br />
requisite F.M. (2.5 to 3.0) washed<br />
and screened but including<br />
necessary tools and plants,<br />
vibrating, curing royalty and all<br />
taxes etc., excluding cost of form<br />
work as well reinforcement its<br />
cutting bending and placing<br />
complete job as per specification<br />
and direction of E/l.<br />
Earth work in filling foundation<br />
trenches or back filling of<br />
masonary structures with suitable<br />
earth in layers not exceeding<br />
150mm thick well watered,<br />
rammed and fully compacted and<br />
finally dressed with earth obtained<br />
from excavation of foundation<br />
trenches and kept at a lead of<br />
50m and initial lift of 1.5m<br />
complete as per specification and<br />
direction of E/I.<br />
Providing stone boulder and<br />
labour charge for pitching on<br />
apron slope of bank with stone<br />
boulders duly packed (uncreated)<br />
complete job (materials within<br />
150m and all lifts as per<br />
specification and direction of E/I.<br />
Per M 3 112.87 2284.36<br />
Per M 3 2.90 3720.95<br />
Per M 3 132.57 16.00<br />
Per M 3 468 968.60<br />
16<br />
Rupees<br />
Two<br />
Thousand<br />
Two<br />
Hundred<br />
Eighty Four<br />
and Paise<br />
Thirty Six<br />
Only<br />
Rupees<br />
Three<br />
Thousand<br />
Seven<br />
Hundred<br />
Twenty and<br />
Paise<br />
Ninety Five<br />
Only<br />
Rupees<br />
Sixteen<br />
Only<br />
Rupees<br />
Nine<br />
Hundred<br />
Sixty Eight<br />
and Paise<br />
Sixty Only<br />
257836.00<br />
10791.00<br />
2121.00<br />
453305.00