6. CONDITION OF QUOTATION :-<br />

1). Documentary certificate <strong>of</strong> work done experience in deflection and load bearing capacity test report<br />

<strong>of</strong> pier and Deck slab <strong>of</strong> R.C.C Bridge must be attached with his quotation.<br />

2). The quotationer or <strong>the</strong>ir authorised agent whatsoever desire may remain present at <strong>the</strong> time <strong>of</strong> opening<br />

<strong>the</strong> quotation.<br />

3) If <strong>the</strong> <strong><strong>of</strong>fice</strong> happens to be closed on th date <strong>of</strong> receipt <strong>of</strong> <strong>the</strong> quotation as specified, <strong>the</strong> quotations will<br />

be received & open in <strong>the</strong> next working day at <strong>the</strong> same time and venue.<br />

4). The quotationer are required to deposit <strong>the</strong> earnest money amounting to 2% (two percent) <strong>of</strong> <strong>the</strong> total<br />

cost quoted, only in <strong>the</strong> shape <strong>of</strong> [ Bank Guarantee minimum validity period six month for quotationer<br />

o<strong>the</strong>r than state <strong>of</strong> Jharkhand] N.S.C - 8 th issue or 3/5 years post <strong><strong>of</strong>fice</strong> term Deposit pass book ,<br />

pledged in favour <strong>of</strong> <strong>the</strong> Executive Engineer, R.C.D., Road Division, Deoghar.<br />

5. Quotation without requisite amount <strong>of</strong> <strong>the</strong> earnest money in <strong>the</strong> required shape, shall be rejected.<br />

6. Up to date income tax, sale tax clearance certificate Labour licence shall be submitted with <strong>the</strong><br />

quotation.<br />

7. Quotationer whose quotation has been accepted, Deposit <strong>the</strong> balance amount as security money @ 3%<br />

<strong>of</strong> <strong>the</strong> quotated amount and <strong>the</strong>n signed <strong>the</strong> contract document in <strong>the</strong> <strong><strong>of</strong>fice</strong> <strong>of</strong> <strong>the</strong> Executive Engineer,<br />

Road Construction Department, Road Division, Deoghar within seven day o<strong>the</strong>rwise <strong>the</strong> earnest money<br />

deposited by him will be forfeited and acceptance <strong>of</strong> his quotation will be cancelled and work will be<br />

allotted to 2 nd quotationer<br />

8. Preference will be given to those quotationer who is recognized by <strong>the</strong> government.<br />

9. The <strong>department</strong> reserves <strong>the</strong> right to accept or reject any or all <strong>the</strong> quotations received without<br />

assigning any reason <strong>the</strong>re<strong>of</strong>.<br />

10. Admissible Sales tax, income tax and labour surcharge will be deducted from <strong>the</strong> bill at <strong>the</strong> time <strong>of</strong><br />

payment.<br />

11. Ambiguous or conditional quotation are not acceptable and shall be out right rejected.<br />

12. Payment will be made only after submission <strong>of</strong> <strong>the</strong> analystical complete set <strong>of</strong> <strong>the</strong> test report result in<br />

all respect .<br />

13. The quotationer will be responsible for accident etc, if any during <strong>the</strong> period <strong>of</strong> test work and <strong>the</strong><br />

responsibility will not be rest with <strong>the</strong> <strong>department</strong>.<br />

14. The quotationer will be fully responsible to watch and ward <strong>of</strong> <strong>the</strong> machinery equipment and materials<br />

supply by <strong>the</strong>m.<br />

15. Test work must be carried out strictly as per P.W.D./M.O.S.T. specification.<br />

16) Ownership Certificate <strong>of</strong> <strong>the</strong> Testing machineries & equipments must be submitted with <strong>the</strong><br />

quotation.<br />

17). The quotationer shall have to get <strong>the</strong>mselves acquainting with <strong>the</strong> site before submitting quotation.<br />

2<br />

Executive Engineer<br />

R.C.D., Road Division, Deoghar.