BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> 3.00m X 2.00m RCC Slab Culvert In<br />

Koderma Jamua Road in Km 2 (2/3) for the year 2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

Sl.<br />

o.<br />

1 2 3 4 5<br />

1 Dismantling <strong>of</strong> existing structures like culverts,<br />

bridges, retaining walls and other structure<br />

comprising <strong>of</strong> masonry, cement concrete, wood<br />

work, steel work, including T&P and scaffolding<br />

wherever necessary, shorting the dismantled<br />

material, disposal <strong>of</strong> unserviceable material and<br />

stacking the serviceable material with all lifts and<br />

lead <strong>of</strong> 1000 metres<br />

(i) R.C.C. by mechanical means<br />

16.60<br />

Cum<br />

2. E/W in excavation <strong>of</strong> foundn. Trenches for bridges<br />

with all materials, labour, tools, and plants,<br />

leveling and ramming the foundation beds,<br />

dressing the sides, removing roots, logs, shrubs<br />

and other loose and deleterious materials likely to<br />

deteriorate, adequate provision against erosion,<br />

water pollution and drainage to keep the site free<br />

<strong>of</strong> water, stacking the excavated soil clear from<br />

the edge <strong>of</strong> excavation, providing light, barrier,<br />

danger signals, choukidar, making and<br />

maintaining diversion, traffic regulation all<br />

complete job as per design/drawing and technical<br />

specification and MORT&H specification clause<br />

304 and other relevant clauses and direction <strong>of</strong><br />

E/I (Excluding cost <strong>of</strong> dewatering and shoring)(i)<br />

Ordinary Soil. Cum 178.305<br />

3. Providing P.C.C./R.C.C. M-150 with nominal mix<br />

(1:2:4) with approved quality <strong>of</strong> stone chips 20<br />

mm to 6 mm size and clean coarse sand <strong>of</strong> 2.5 to<br />

3.5 F.M. in foundation and plinth including mixing<br />

cement concrete in mixer, Screening royalty and<br />

all taxes with hire charges <strong>of</strong> machinery all<br />

complete with cost all labour and materials as per<br />

MOST specification and direction <strong>of</strong> E/I. Cum 119.792<br />

4. Providing P.C.C./R.C.C. M-10 with nominal mix<br />

(1:3:6) in foundation <strong>of</strong> various component <strong>of</strong><br />

culvert and bridge with approved quality <strong>of</strong> stone<br />

metal grade- iv (20mm to 37 mm size) and clean<br />

coarse sand <strong>of</strong> F.M. 2.5 to 3 including screening<br />

mixing cement concrete in mixer, and placing and<br />

in position vibrating screening curing taxes and<br />

royalty including the cost <strong>of</strong> all materials and<br />

labour complete job as per approved<br />

design/drawing and relevant clause M.O.S.T.<br />

specification and direction <strong>of</strong> E/I. including cost <strong>of</strong> Cum 16.945<br />

28<br />

(Rupees Five<br />

Hundred Fifty Seven)<br />

only<br />

557.00<br />

(Rupees Forty One &<br />

paise Fifteen) only<br />

41.15<br />

(Rupees Four<br />

Thousand One<br />

Hundred Twenty<br />

Four & paise Ninety<br />

Nine) only<br />

4124.99<br />

(Rupees Three<br />

Thousand One<br />

Hundred Sixty<br />

Seven& paise<br />

Seventy Three) only<br />

3167.73