16.08.2013 Views

ame of Work - Information & Public Relations Department

ame of Work - Information & Public Relations Department

ame of Work - Information & Public Relations Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GENERAL AND SPECIAL CONDITION FOR THE CONTRACTORS<br />

1. Rate quote should be including <strong>of</strong> all taxes via Central Sales Tax, Jharkhand Sales Tax, Excise Duty (if valid)<br />

and carriage <strong>of</strong> materials to be issued from P.W.D go down.<br />

2. The tenders should submit I.T Clearance Certificate, Labour License Certificate from the Labour <strong>Department</strong>.<br />

3. The work shall be done as per circle specification during excavation <strong>of</strong> the work absence <strong>of</strong> which I.R.C code<br />

practice or M.T specification for the Road Bridge and building work shall be adopted.<br />

4. The quantities in B.O.Q are approx actual measurement for work actually executed shall be measured and<br />

value calculated at the rates approved by the basis <strong>of</strong> payment quantities and item can be increased or<br />

decreased by the Engineer in charge and the contractor shall have to execute the s<strong>ame</strong> at rates sanction for the<br />

s<strong>ame</strong> and no extra rate can be claimed for extra quantities involved.<br />

5. The contractor shall be issued departmental materials on available as per actual requirement at the rate<br />

stipulate above materials received by the contractor in excess <strong>of</strong> the actual requirement shall be recovered at<br />

the rates double the rates mentioned above.<br />

6. o claimed shall be entertained for :-<br />

(a) Fluctuation <strong>of</strong> rates <strong>of</strong> labour and materials execution <strong>of</strong> work.<br />

(b) Delay in issue <strong>of</strong> materials or non-availability <strong>of</strong> departmental materials.<br />

(c) Any loss due to natural calamity.<br />

(d) Due to any act <strong>of</strong> enemies.<br />

(e) Transportation, production or other difficulties and circumstances beyond the control <strong>of</strong> the<br />

department/Govt.<br />

7. Procurement <strong>of</strong> materials and consumption <strong>of</strong> water with its drainage will be entire responsibility <strong>of</strong> the<br />

contractor and no claim shall entertained in this amount.<br />

8. The successful tender arrange for necessary site accommodation and other facilities for the labour as required<br />

under labour law and shall have to pay to labour minimum wages act enforced on time to time by the labour<br />

department.<br />

9. The contractor should get the sample <strong>of</strong> bricks, sand, metal, chips, gravel or mooram required for use in work<br />

approved by the Engineer-in-Charge before collection and use.<br />

10. In case if using bitumen from bulk bitumen storage tank it shall be responsibility for the contractors to be<br />

called the s<strong>ame</strong> to works site after refilling in empty drums. However the empty drums can be supplied by the<br />

department for use as contains if available which shall have to be returned to department in good condition<br />

after use failing which a sum <strong>of</strong> Rs 110/- per drum shall be recovered from the bill.<br />

11. Cube <strong>of</strong> 10”x 10” will be taken for every type <strong>of</strong> concrete works the test results <strong>of</strong> this must justify the<br />

strength <strong>of</strong> its any sample as after 28 days <strong>of</strong> casting.<br />

12. (a) Foundation C.C 1.5.6 (1) table P.S.T.<br />

(b) Approach slab had bed plates being cast (2:2:4-2250) lbs. P.S.T<br />

(c) Deck slab (1:1:4/2) table P.S.T else no payment will be made for such concerning. The cost <strong>of</strong> quality<br />

and specification conducted by the department or any other will be borne by the contractor.<br />

13. Procurement <strong>of</strong> blasting materials and observance <strong>of</strong> etc. will be contractors responsibility. No payment <strong>of</strong><br />

claim on this account be entertained.<br />

14. The contractor will have to bear the liability <strong>of</strong> any rectification <strong>of</strong> defects will require to be done by the<br />

contractor and if he fails to do so the s<strong>ame</strong> will not be done through any other and cost will be recovered<br />

from the contractor. The concerning work will have to be done by machine falling for which the contractor<br />

will have to manage necessary equipment and mixer etc. at his own cost.<br />

15. Vibrators for which the contractor will have to keep nos. <strong>of</strong> vibrator at site at his own cost.<br />

16. Every work will have to be done in proper way in order to avoid accident to the workers and he will have to<br />

bear the cost <strong>of</strong> compensation etc.<br />

17. The suppliers centering and shuttering during concreting period will be contractors responsibility and no<br />

claim in this account will be entertain.<br />

18. No claim making said godown by the contractor’s will be entertained.<br />

19. Providing lighting and necessary road barriers or lighting arrangement is contractor’s responsibility.<br />

20. No claim will be entertained unless submit for final decision by the contractors each month otherwise it may<br />

be treated time bar.<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!