COMPESATIO AD CODITIO OF COTRACT<br />
CLAUSE – I<br />
All compensation or other sums or money payable by the contractor or Government under the terms <strong>of</strong><br />
his contract may be deputed from or paid by the sales <strong>of</strong> sufficient part <strong>of</strong> his security deposit or from the interest<br />
arising there firm or form any sum be due or any because due to the contractors or Government or any account<br />
whatever and the event <strong>of</strong> the security to deposit being reduce by reason <strong>of</strong> delay there after make good in each or<br />
Government security endorsed any sums which may be deducted from or raised by sale or is security or any part<br />
there<strong>of</strong>.<br />
CLAUSE –II<br />
The time allowed for carrying out the works as entered in the tender shall be strictly observed by the<br />
contractor and shall be recall from the date on which the written order to commence the work is given to the<br />
contractor. The work shall trough stipulated period <strong>of</strong> the contract to be carried or with all due differences (time<br />
being deemed to be the absence <strong>of</strong> the contractor or the part <strong>of</strong> the contractor) and the contractor shall pay a<br />
compensational whole works shown by the tender for every day that the works remained uncommented or<br />
unfinished until such date as the Executive Engineer or his authorized agents are fully complied with the<br />
contractors to the Executive Engineer’s satisfaction and further to insure mild progress during the excavation <strong>of</strong><br />
the work the contractor shall bound in all cases in which the time allowed for any work in months complete one<br />
further <strong>of</strong> the part <strong>of</strong> the work before the forth <strong>of</strong> the whole time allowed under the contractor his lapsed in the<br />
contract falling to comply with his condition shall be liable to pay as compensation and amount about to 1/3<br />
percent or the said estimated cost <strong>of</strong> the whole work for every day due to quality <strong>of</strong> work remains in completed<br />
always that the entire amount <strong>of</strong> compensation to be paid under the provision <strong>of</strong> this clause shall not exceed 10%<br />
on the estimated cost <strong>of</strong> the work as shown in the tender.<br />
ACTIO WHE WHOLE SECURITY DEPOSIT FORFEITED<br />
CLAUSE – III<br />
In any which under any clause <strong>of</strong> this contract the contractor shall have tendered his if liable to pay<br />
compensation with something shall have tendered his site liable to pay the Executive Engineer (whether paid this<br />
amount one sum <strong>of</strong> the deducted by installment). The Executive Engineer on the behalf <strong>of</strong> the Government <strong>of</strong><br />
Jharkhand shall have power to any <strong>of</strong> following course as mentioned down best to the interest <strong>of</strong> the Government.<br />
(a) (The relined the contract <strong>of</strong> which revision notice clause in written to the contractor under the hand <strong>of</strong> the<br />
Executive Engineer shall be conclusive evidence) and in which case the security deposit <strong>of</strong> the contractor shall be<br />
forfeited and absolutely at the disposal <strong>of</strong> Government.<br />
Tenderer Signature Executive Engineer<br />
R.C.D, Road Division<br />
Koderma<br />
34