ame of Work - Information & Public Relations Department
ame of Work - Information & Public Relations Department
ame of Work - Information & Public Relations Department
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BILL OF QUATITY<br />
<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in<br />
Sl.<br />
o.<br />
13 th km <strong>of</strong> Koderma-Jamua Road for the year 2011-12<br />
Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />
1 2 3 4 5<br />
1 Dismantalling <strong>of</strong> existing structures<br />
like culverts, bridges, retaining<br />
walls and other structure<br />
comprising <strong>of</strong> masonry, cement<br />
concrete, wood work, steel work,<br />
including T&P and scaffolding<br />
wherever necessary, shorting the<br />
dismantled material, disposal <strong>of</strong><br />
unserviceable material and stacking<br />
the serviceable material with all<br />
lifts and lead <strong>of</strong> 1000 metres<br />
(a) Brick <strong>Work</strong><br />
(b) R.C.C. slab<br />
2. E/W in excavation <strong>of</strong> foundn.<br />
Trenches for bridges with all<br />
materials, labour, tools, and plants,<br />
levelling and ramming the<br />
foundation beds, dressing the sides,<br />
removing roots, logs, shrubs and<br />
other loose and deleterious<br />
materials likely to deteriorate,<br />
adequate provision against erosion,<br />
water pollution and drainage to<br />
keep the site free <strong>of</strong> water, stacking<br />
the excavated soil clear from the<br />
edge <strong>of</strong> excavation, providing light,<br />
barrier, danger signals, choukidar,<br />
making and maintaining diversion,<br />
traffic regulation all complete job<br />
as per design/drawing and technical<br />
specification and MORT&H<br />
specification clause 304 and other<br />
relevant clauses and direction <strong>of</strong> E/I<br />
(Excluding cost <strong>of</strong> dewatering and<br />
shoring)<br />
Cum<br />
Cum<br />
(i) Ordinary Soil Cum<br />
42<br />
27.90<br />
6.187<br />
102.752<br />
3. Providing P.C.C./R.C.C. M-150<br />
with nominal mix (1:2:4) with<br />
approved quality <strong>of</strong> stone chips 20 Cum 31.00<br />
(Rupees One Hundred Fifty<br />
Five & paise Twenty Five)<br />
only<br />
Rs. 155.25<br />
(Rupees Five Hundred Fifty<br />
Eight& paise Fifty Five) only<br />
Rs. 558.55<br />
(Rupees Forty One & paise<br />
Fifteen) only<br />
Rs. 41.15<br />
(Rupees Four Thousand One<br />
Hundred Ninety & paise Sixty Two)<br />
only<br />
Rs. 4190.62