16.08.2013 Views

ame of Work - Information & Public Relations Department

ame of Work - Information & Public Relations Department

ame of Work - Information & Public Relations Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BILL OF QUATITY<br />

<strong>ame</strong> <strong>of</strong> <strong>Work</strong> : Construction <strong>of</strong> R.C.C. Slab Culvert <strong>of</strong> size 1.50 X 1.00 m in<br />

Sl.<br />

o.<br />

13 th km <strong>of</strong> Koderma-Jamua Road for the year 2011-12<br />

Item <strong>of</strong> <strong>Work</strong> Unit Quantity Rate<br />

1 2 3 4 5<br />

1 Dismantalling <strong>of</strong> existing structures<br />

like culverts, bridges, retaining<br />

walls and other structure<br />

comprising <strong>of</strong> masonry, cement<br />

concrete, wood work, steel work,<br />

including T&P and scaffolding<br />

wherever necessary, shorting the<br />

dismantled material, disposal <strong>of</strong><br />

unserviceable material and stacking<br />

the serviceable material with all<br />

lifts and lead <strong>of</strong> 1000 metres<br />

(a) Brick <strong>Work</strong><br />

(b) R.C.C. slab<br />

2. E/W in excavation <strong>of</strong> foundn.<br />

Trenches for bridges with all<br />

materials, labour, tools, and plants,<br />

levelling and ramming the<br />

foundation beds, dressing the sides,<br />

removing roots, logs, shrubs and<br />

other loose and deleterious<br />

materials likely to deteriorate,<br />

adequate provision against erosion,<br />

water pollution and drainage to<br />

keep the site free <strong>of</strong> water, stacking<br />

the excavated soil clear from the<br />

edge <strong>of</strong> excavation, providing light,<br />

barrier, danger signals, choukidar,<br />

making and maintaining diversion,<br />

traffic regulation all complete job<br />

as per design/drawing and technical<br />

specification and MORT&H<br />

specification clause 304 and other<br />

relevant clauses and direction <strong>of</strong> E/I<br />

(Excluding cost <strong>of</strong> dewatering and<br />

shoring)<br />

Cum<br />

Cum<br />

(i) Ordinary Soil Cum<br />

42<br />

27.90<br />

6.187<br />

102.752<br />

3. Providing P.C.C./R.C.C. M-150<br />

with nominal mix (1:2:4) with<br />

approved quality <strong>of</strong> stone chips 20 Cum 31.00<br />

(Rupees One Hundred Fifty<br />

Five & paise Twenty Five)<br />

only<br />

Rs. 155.25<br />

(Rupees Five Hundred Fifty<br />

Eight& paise Fifty Five) only<br />

Rs. 558.55<br />

(Rupees Forty One & paise<br />

Fifteen) only<br />

Rs. 41.15<br />

(Rupees Four Thousand One<br />

Hundred Ninety & paise Sixty Two)<br />

only<br />

Rs. 4190.62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!