Tender for Supply, Installation, Developmentation and ...
Tender for Supply, Installation, Developmentation and ...
Tender for Supply, Installation, Developmentation and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
HINDUSTAN PETROLEUM CORPORATION LIMITED<br />
Purchase Department, Petroleum House, 7th floor, 17 J. Tata Road, Mumbai 400 020.<br />
Phone No : +91-2286 3105 / 3723 Fax No. +91-22-2283 5615, 2284 1098<br />
<strong>Tender</strong> No. 6000094-HD-10003/DSS<br />
ACTIVE COMPONENTS<br />
Public <strong>Tender</strong> Document<br />
Sr.No Product Description Qty Rate Amount<br />
1<br />
WS-C3750G-<br />
24TS-E1U<br />
Core Switch at Server Room<br />
Catalyst 3750 24 10/100/1000 + 4<br />
SFP Enh Multilayer;1RU<br />
1<br />
2 CAB-ACE Power Cord Europe 1<br />
3<br />
CAB-STACK-<br />
50CM<br />
Cisco StackWise 50CM Stacking<br />
Cable<br />
1<br />
4<br />
5<br />
6<br />
WS-C2960-48TC-<br />
L<br />
WS-C2960-24TC-<br />
L<br />
GLC-SX-MM=<br />
Catalyst 2960 48 10/100 + 2 T/SFP<br />
LAN Base Image<br />
Catalyst 2960 24 10/100 + 2 T/SFP<br />
LAN Base Image<br />
GE SFP, LC connector SX<br />
transceiver<br />
7<br />
CON-CSSPD-<br />
C29604TC 9<br />
8 Fiber to UTP Media Converter 2<br />
A<br />
TOTAL<br />
TOTAL SUPPLY<br />
COST<br />
______________________________<br />
48 of 59 Signature & Seal of <strong>Tender</strong>er<br />
4<br />
4<br />
20<br />
VAT _____%<br />
Octroi _____%<br />
<strong>Installation</strong> <strong>and</strong> Commissioning Charges (As a percentage of<br />
Total <strong>Supply</strong> Cost given above) _____%<br />
Service Tax on <strong>Installation</strong> <strong>and</strong> Commissioning charges _____%<br />
B TOTAL FOR INSTALLATION AND COMMISSIONING