5.2 By H<strong>and</strong><br />

The pipe may be lowered with the help <strong>of</strong> tripods <strong>and</strong> chain pulley blocks into the trench<br />

immediately after the coating <strong>and</strong> wrapping. However, if in the opinion <strong>of</strong> the Engineer in<br />

charge that the temperature conditions do not allow direct lowering, then the pipes shall be set<br />

down on clear square cut skids. The skids shall be so spaced as to keep the pipe away from<br />

touching the ground.<br />

Method & Time <strong>of</strong> Lowering Pipe<br />

Under favourable temperature, conditions <strong>and</strong> using methods which will not damage coating, the<br />

pipe may be lowered into the trench.<br />

Pipe previously set on skids, because <strong>of</strong> un-favourable temperature conditions shall be lowered<br />

into the trench normally in the cool <strong>of</strong> the morning <strong>and</strong> only when the temperature <strong>of</strong> the pipe is<br />

below the s<strong>of</strong>tening point <strong>of</strong> the coating materials.<br />

All skid marks <strong>and</strong> other places <strong>of</strong> damage shall be thoroughly examined to ensure proper patching<br />

where necessary, be<strong>for</strong>e the pipe is finally lowered into the trench.<br />

6.0 H<strong>and</strong>ling coated pipe<br />

Coated pipe shall not be placed in trench until cave in plugs, hard clods; stones, skids, welding<br />

rods etc. have been removed there from. Where the trench has a hard or jagged bottom,<br />

sufficient fine dirt or s<strong>and</strong> shall be placed therein, be<strong>for</strong>e the pipe is lowered.<br />

Coated pipe shall not be h<strong>and</strong>led or moved by means <strong>of</strong> cable or chains or by praying with skids<br />

or bars, it shall be tightened <strong>and</strong> lowered by using lowering in belts <strong>of</strong> a <strong>st<strong>and</strong>ard</strong> width <strong>and</strong><br />

design <strong>for</strong> the size <strong>of</strong> pipe being h<strong>and</strong>led.<br />

Coated pipe shall not be dragged along the ground or otherwise h<strong>and</strong>led in a manner that will be<br />

detrimental to the coating.<br />

Lining up <strong>and</strong> welding<br />

The ends <strong>of</strong> the pipe line shall be kept securely closed to prevent entry <strong>of</strong> any <strong>for</strong>eign material /<br />

moisture after lowering into the trench.<br />

Be<strong>for</strong>e making joint, the pipe shall be carefully laid so as to be perfectly aligned in both plan <strong>and</strong><br />

pr<strong>of</strong>ile, <strong>and</strong> the end closure provided shall be removed. Tie in shall be made in the coolness <strong>of</strong><br />

the morning or when the ambient temperature is not exceeding 29 deg C or s<strong>of</strong>tening<br />

temperature <strong>of</strong> the coating material whichever is less. All beveling aligning <strong>and</strong> welding shall be<br />

in accordance with the welding <strong>specification</strong> given in the tender.<br />

Free access shall be provided <strong>for</strong> the welding <strong>of</strong> the circumferential joints by increasing the width<br />

<strong>and</strong> depth <strong>of</strong> the trench at these points. There should be no construction to the welder from any<br />

side so that good welded joint is obtained.<br />

Testing & coating wrapping