eceived within three (3) days of tender submission due date /time shall not be<br />
considered.<br />
4.4 AMENDMENT OF BID DOCUMENT<br />
At any time prior to the bid due date, the Owner/ Consultant may, <strong>for</strong> any reason, whether<br />
at its own initiative or in response to a clarification requested by a prospective <strong>Bid</strong>der,<br />
modify the <strong>Bid</strong> <strong>Document</strong>.<br />
The amendment will be notified in writing to all prospective <strong>Bid</strong>ders who have been<br />
issued the <strong>Bid</strong> <strong>Document</strong> and will be binding on them.<br />
In order to af<strong>for</strong>d prospective <strong>Bid</strong>der, reasonable time in which to take the<br />
amendment into account in preparing their bids, the Owner/ Consultant may, at its<br />
discretion, extend the bid due date.<br />
5.0 PERIOD OF VALIDITY OF BIDS:<br />
5. 1 <strong>Bid</strong>s shall be kept valid <strong>for</strong> 120 days from the final bid due date. A bid valid <strong>for</strong><br />
shorter period shall be rejected as per clause 12.0 (Rejection Criteria) of Chapter – 2<br />
(Instructions to <strong>Bid</strong>ders). The bidder shall not be entitled during the said period of 120<br />
days, without the consent in writing of the Owner / Consultant to revoke or cancel its bid<br />
or to vary the bid given or any term thereof. In case of bidder revoking or cancelling its<br />
bid without the consent of the Owner in writing, the Owner shall <strong>for</strong>feit the <strong>Bid</strong> Security<br />
furnished by <strong>Bid</strong>der.<br />
5.2 Notwithstanding above, the Owner may solicit the <strong>Bid</strong>der’s consent to an<br />
extension of the period of bid validity. The request and the responses thereto shall be<br />
made in writing or through any other means of communication decided by the owner.<br />
The bid security/EMD shall also be accordingly extended by the bidder at no extra cost<br />
to the owner.<br />
6. 0 MODIFICATION AND WITHDRAWAL OF BIDS<br />
6. 1 The <strong>Bid</strong>der may modify or withdraw his bid after the bid’s submission, provided<br />
that the modification/ withdrawal notice is received by the Owner / Consultant prior to<br />
the bid due date & time.<br />
The <strong>Bid</strong>der’s modification or withdrawal notice shall be prepared, sealed, marked and<br />
despatched in accordance with the provisions of bid document. A withdrawal<br />
notice may also be sent by Cable or Telefax or e-mail but must be followed by a signed<br />
confirmation copy dated not later than the deadline <strong>for</strong> submission of bids.<br />
6.2 No bid shall be modified subsequent to the due date & time or extension, if any,<br />
<strong>for</strong> submission of bids. <strong>Bid</strong>der(s) to note that unsolicited price changes (including<br />
changes in taxes, duties mentioned & their applicability) after submission of bid<br />
shall not be allowed. In case any bidder gives unsolicited revised prices/price<br />
implication, his bid shall be rejected and EMD/ <strong>Bid</strong> security submitted by the bidder shall be<br />
<strong>for</strong>feited, however, any unilateral rebate shall be dealt as per clause no. 22 of ITB.<br />
6.3 No bid shall be allowed to be withdrawn in the interval between the deadline <strong>for</strong><br />