8.1.2 PRICED BID (PART-III):<br />

9.0 BID<br />

k. Agreed Terms & Conditions duly filled-in.<br />

l. Declaration with the bid qualification criteria that bidder has not been<br />

banned or delisted by any Government or quasi Government agencies<br />

or PSU's as per Annexure-8 at Chapter-8 of the <strong>Bid</strong> <strong>Document</strong>.<br />

m. <strong>Bid</strong> <strong>for</strong>m duly filled, signed & stamped with signature of witness as per<br />

Annexure-9 of Chapter-8.<br />

n. Letter of Authority duly filled, signed & stamped with signature of<br />

representatives as per Annexure-1 1 of Chapter-8.<br />

o. Deviation sheet as per Annexure-1 2 of Chapter-8.<br />

p. NSIC certificate details, if applicable as per Annexure-13 of Chapter-8.<br />

q. Certificate <strong>for</strong> Non-Involvement of Agent as per Annexure-14 of<br />

Chapter-8 or Details of Indian Agent as per Annexure-15 of Chapter-8.<br />

r. Any other in<strong>for</strong>mation/details/documents/data required as per <strong>Bid</strong><br />

<strong>Document</strong>.<br />

s. Addenda/Corrigenda to the <strong>Bid</strong> <strong>Document</strong>, if issued, must be<br />

signed and submitted along with the bid.<br />

<strong>Bid</strong> Form and Price Schedule (as Annexure-9 & Chapter-5 of tender) duly filled along<br />

with signed & Stamped by the <strong>Bid</strong>der.<br />

9.1 PREPARATION & SUBMISSION OF BID<br />

9.1.1 <strong>Bid</strong>s shall be submitted at the address given in Cut out Slips by the due date &<br />

time. Owner/ consultant shall be not responsible <strong>for</strong> <strong>Bid</strong>s submitted at any other office of<br />

Consultant or the Owner.<br />

9.1.2 <strong>Document</strong>s mentioned in the <strong>Bid</strong> <strong>Document</strong> shall be submitted along with the<br />

bid by the <strong>Bid</strong>der.<br />

9.1.3 Addenda/Corrigenda to the <strong>Bid</strong> <strong>Document</strong>, if issued, must be signed and<br />

submitted along with the un-priced bid.<br />

9.1.4 <strong>Bid</strong>ders are advised to submit bids based strictly on the terms & conditions<br />

and specifications contained in the <strong>Bid</strong> <strong>Document</strong> and not to stipulate any deviations.<br />

Each <strong>Bid</strong>der shall submit only one bid. A <strong>Bid</strong>der who submits more than one<br />

bid or Alternative bids will be rejected.<br />

MH2145-C000-PP-RFQ-0026 Page 28 of 131