Gas Balanced Flue Guide - Euroheat
Gas Balanced Flue Guide - Euroheat
Gas Balanced Flue Guide - Euroheat
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Example 6: Through Ceilings and Roof Spaces<br />
Fitting a Top to Vertical High Level <strong>Flue</strong> Kit Through Ceilings and Roof Spaces<br />
When installing balanced flue pipe through a ceiling the use of a ceiling support and fire stop spacer are<br />
recommended. There should be no flue joints at any point as the flue passes through a ceiling.<br />
There should a minimum clearance of 25mm from the flue pipe to any combustible material.<br />
No flue joints<br />
between fire<br />
stop spacer<br />
and ceiling<br />
support.<br />
Components used<br />
Weight of flue<br />
supported here.<br />
Ceiling support<br />
Fire stop spacer<br />
Weight of flue<br />
supported here.<br />
Description 150mm 180mm<br />
Ceiling support MS91056 MS91057<br />
Fire stop spacer MS91058 MS91059<br />
Roof flashing MS91063 MS91063<br />
Wall band MS91052 MS91053<br />
Roof flashing<br />
(accessory)<br />
<br />
© EUROHEAT DISTRIBUTORS (H.B.S) LTD. 13<br />
Technical <strong>Guide</strong> IN1105 Ed 5 May 2009