D. FEE METHODOLOGY<br />
Table 7-1<br />
Summary <strong>of</strong> Wastewater EDU Factors<br />
Land Use<br />
Unit EDU Factor<br />
VLDR DU 1.00<br />
LDR DU 1.00<br />
MDR DU 0.73<br />
HDR DU 0.73<br />
BIP acre 7.50<br />
CMU acre 15.46<br />
GC acre 4.69<br />
HI acre 6.25<br />
LI acre 6.25<br />
NC acre 7.00<br />
P acre 2.50<br />
PQP acre 2.66<br />
This section describes the non-PFIP and PFIP fees and also briefly summarizes how project costs<br />
are developed.<br />
1. Non-PFIP and PFIP Fees<br />
The <strong>City</strong> has established a fee structure that allocates costs to construct sewer infrastructure<br />
related to new development. There are two types <strong>of</strong> fees assessed, non-PFIP fees which have<br />
been adopted by separate <strong>City</strong> resolutions and PFIP fees which are adopted in connection with<br />
this document. Brief descriptions <strong>of</strong> what are included in the fees are also provided.<br />
Descriptions <strong>of</strong> the non-PFIP fees are provided for informational purposes only. Because these<br />
fees are adopted by separate <strong>City</strong> resolution, policies related to these fees including fee<br />
adjustments are identified in other <strong>City</strong> documents.<br />
Non-PFIP Fees<br />
Wastewater Connection Fee: The WQCF Phase III Expansion Project corrected a number <strong>of</strong><br />
existing deficiencies at the plant and thus benefited current rate payers. Based on an analysis <strong>of</strong><br />
project costs and proposed improvements, the expansion costs were allocated between rate<br />
payers and new development.<br />
The Wastewater Connection Fee was imposed in 2003 on new development during the Phase III<br />
Expansion in lieu <strong>of</strong> development impact fees. The Wastewater Connection Fee varies based on<br />
the timing <strong>of</strong> the development in relation to the Expansion Schedule(s) under construction.<br />
<strong>Manteca</strong> <strong>2013</strong> PFIP <strong>Update</strong> 31 MTB011401<br />
February <strong>2013</strong> n:\mtb011401\reports\final\<strong>2013</strong>0226.docx