Table 7-2<br />

Projected Sewer Project Costs by Zone<br />

Parameter Cost, $<br />

Zone 21 2,198,517<br />

Zone 22 17,973,626<br />

Zone 24 26,992,527<br />

Zone 25 2,786,963<br />

Zone 26 1,693,755<br />

<strong>City</strong> Costs a<br />

6,272,214<br />

Total Project Costs 57,917,602<br />

a Portion <strong>of</strong> project costs to be paid by the <strong>City</strong> to<br />

alleviate existing deficiencies.<br />

The PFIP Sewer Collection System Fees for residential land uses are provided in Table 7-3. The<br />

fees for non-residential land uses are provided in Table 7-4<br />

Table 7-3<br />

Summary <strong>of</strong> PFIP Residential Sewer Collection System Fees<br />

Land Use<br />

Fee Per Dwelling Unit, $<br />

Zone 21 Zone 22 Zone 24 Zone 25 Zone 26<br />

VLDR 277 1,714 1,306 310 1,067<br />

LDR 277 1,714 1,306 310 1,067<br />

MDR 203 1,254 955 226 780<br />

HDR 203 1,254 955 226 780<br />

Table 7-4<br />

Summary <strong>of</strong> PFIP Non-Residential Sewer Collection System Fees<br />

Land Use<br />

$ per Gallon per Day<br />

Zone 21 Zone 22 Zone 24 Zone 25 Zone 26<br />

All Non-Residential 1.73 10.72 8.16 1.94 6.67<br />

F. CONSTRUCTION RESPONSIBILITIES<br />

The <strong>City</strong> and developer have responsibilities for construction <strong>of</strong> sewer facilities as follows:<br />

1. <strong>City</strong> Responsibilities<br />

As funds are available, the <strong>City</strong> will construct the sewer facilities shown in the 2012 WWCSMP.<br />

If insufficient funds are available, developers may advance construction by providing funding<br />

<strong>Manteca</strong> <strong>2013</strong> PFIP <strong>Update</strong> 33 MTB011401<br />

February <strong>2013</strong> n:\mtb011401\reports\final\<strong>2013</strong>0226.docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!