Low Resolution Firm Brochure - Research Facilities Design
Low Resolution Firm Brochure - Research Facilities Design
Low Resolution Firm Brochure - Research Facilities Design
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PROJECT NAME<br />
Regional Reference Laboratory<br />
Kaiser Permanente<br />
Berkeley / Emeryville, California<br />
COMPLETION<br />
2004<br />
DESCRIPTION<br />
36,100 NSF of laboratory and laboratory support<br />
space in a 51,100 GSF tenant improvement for<br />
Central Specimen Processing, Chemistry, and<br />
Cellular Pathology Departments. The facility<br />
houses the highly automated analytical testing<br />
equipment for Kaiser Permanente’s Northern<br />
California Regional Laboratory. The design is for<br />
a single, large open laboratory with several<br />
small ancillary functional spaces. Laboratory<br />
space is provided for Central Specimen<br />
Processing, Automated Chemistry,<br />
Immunochemistry, Toxicology, Urine Testing,<br />
Hematology, Coagulation, Blood Bank,<br />
<strong>Research</strong> & Development, and Central<br />
Glasswash. Specimen, reagent, and supplies<br />
storage is in automated vertical storage shuttle<br />
and carousel units, refrigerated and nonrefrigerated<br />
AREA SUMMARY<br />
Gross Building: 51,000<br />
Net (Assignable) Building: 36,100<br />
Net/Gross: 0.70<br />
Laboratory and Laboratory Support: 25,900<br />
Laboratory and Laboratory Support/<br />
Gross Building: 0.50<br />
Laboratory Support: 1,160<br />
Laboratory Support/Laboratory and<br />
Laboratory Support: 0.04<br />
Laboratory Planning Module: 11’ wide<br />
Mechanical and Electrical: 2,340<br />
Mechanical and Electrical/Gross: 0.04<br />
Hood Exhaust/NSF Laboratory: 0.51<br />
Floor to Floor Height:<br />
Structural System: Steel<br />
COST SUMMARY<br />
Building Construction: $9,656,753<br />
Cost/GSF: $189<br />
65<br />
PROJECT EXPERIENCE