February<br />

Began construction of the $10 million SunPass-only<br />

Lutz-Lake Fern Road interchange at milepost 16 on the<br />

Suncoast Parkway in Hillsborough County<br />

Completed construction of the ORT Lite conversion at the<br />

Cypress Creek Toll Plaza on the Southern Coin <strong>System</strong> of<br />

the Mainline in Broward County<br />

Completed construction of the ORT Lite conversion at the<br />

Bird Road and Homestead Toll Plazas on the HEFT in Miami-<br />

Dade County<br />

Completed construction of the ORT Lite conversion at the<br />

Lantana Toll Plaza on the Mainline in Palm Beach County<br />

Began construction of the $59 million widening from four<br />

to eight lanes on the Mainline in Orange County from<br />

Hemple Road to Beulah Road<br />

Completed construction of the $5 million median guardrail<br />

improvement project on the Polk Parkway covering 18<br />

miles<br />

March<br />

Completed the $83 million widening project on the<br />

Sawgrass Expressway from Coral Ridge Drive to the<br />

Mainline in Broward County<br />

April<br />

Completed the $10 million resurfacing project on the<br />

Mainline from milepost 118 to 125 in Martin County<br />

Completed the $17 million construction of SunPassonly<br />

lanes at four Sawgrass Expressway interchanges:<br />

Commercial Boulevard, Atlantic Boulevard, Sample Road,<br />

University Drive<br />

May<br />

Fiscal Year Ended June 30, 2008<br />

Completed the $16 million resurfacing project on the<br />

Mainline from milepost 74 to 77 in Palm Beach County<br />

Began the $53 million widening project on the Beachline<br />

West from milepost 4 to 8 from four to six lanes<br />

Completed the $6 million resurfacing project on the<br />

Beachline West from milepost 0 to 4 in Orange County<br />

June<br />

Completed the $14 million resurfacing project on the<br />

Mainline from milepost 138 to 154 in St. Lucie County<br />

Completed construction of the $55 million Sawgrass<br />

Expressway widening in Broward County from Atlantic<br />

Boulevard to Coral Ridge Drive from four to six lanes<br />

Completed installation of a $20 million canal cable<br />

barrier system in St. Lucie, Palm Beach and Miami-Dade<br />

Counties<br />

August<br />

Completed the $40 million ORT modification at the<br />

Sunrise toll facility on the Sawgrass Expressway in<br />

Broward County<br />

September<br />

Completed the $28 million resurfacing project on the<br />

Mainline from milepost 199 to 207 and 227 to 249 in<br />

Osceola County<br />

Pictured: Open Road Tolling at Sunrise Toll Plaza<br />