Florida's Turnpike System
Florida's Turnpike System
Florida's Turnpike System
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Comprehensive Annual Financial Report<br />
Early in Fiscal Year 2008, construction began on the widening<br />
of the Mainline in Orange County from Interstate<br />
4 to north of Gotha Road from four to eight lanes<br />
which will add 22 lane-miles on the <strong>System</strong>. The project<br />
includes two bridge replacements and 27,000 linear feet<br />
of sound barrier walls. In February 2008, construction<br />
began on the widening of the Mainline in Orange County<br />
from Hemple Road to Beulah Road. This project will<br />
add four lanes to the existing four lanes resulting in an<br />
additional 12 lane-miles on the <strong>System</strong>.<br />
On the Sawgrass Expressway in Broward County, work<br />
was completed during the year on the widening from<br />
Atlantic Boulevard to the Mainline. This segment of<br />
the Sawgrass Expressway was converted from four to six<br />
lanes adding approximately 27 lane-miles to the <strong>System</strong>.<br />
In addition to the roadway widening, improvements<br />
include sound barrier walls along residential areas, ramp<br />
modifications at the University Drive and Lyons Road<br />
interchanges, new median guardrail and the installation of<br />
fiber-optic conduit, electronic message signs and cameras<br />
as part of the <strong>Turnpike</strong> ITS program.<br />
In Orange County, construction continued on widening<br />
the Beachline West Expressway near milepost 6. This segment<br />
of the Beachline West will be converted from four<br />
to six lanes adding approximately 5 lane-miles. The widening<br />
is part of a series of enhancements that began in FY<br />
2007 and include the replacement of the Beachline West<br />
Mainline Toll Plaza featuring two SunPass express lanes in<br />
each direction with <strong>Turnpike</strong> signature gantries overhead.<br />
In May 2008, construction began on widening the lanes<br />
approaching the Beachline West Mainline Toll Plaza. This<br />
project will add two lanes to the existing four lanes resulting<br />
in an additional 5 lane-miles on the <strong>System</strong>.<br />
Part of the <strong>Turnpike</strong>’s mission to meet the State’s growing<br />
transportation needs is providing additional access to the<br />
existing <strong>Turnpike</strong> <strong>System</strong>. During FY 2008, a number of<br />
interchange projects were completed or ongoing on the<br />
<strong>System</strong>.<br />
18<br />
Construction continues in Orange County on<br />
the widening from four to eight lanes<br />
Construction is underway to convert the<br />
Beachline West toll plaza to ORT