roadMAP [PDF, 1.9 MB] - fteval
roadMAP [PDF, 1.9 MB] - fteval
roadMAP [PDF, 1.9 MB] - fteval
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
12.3.7 StarMAPs<br />
1. Governance<br />
2. Design<br />
Country MAP 1.1 Governance 2.1. Introduction/overview on<br />
design of this specific MAP<br />
AU CRC Minister of Education Science and<br />
Training<br />
CRC Committee<br />
CRC Secretariat (--> Administration)<br />
Expert Panel (Life Science & Physical<br />
Science and Engineering)<br />
Visitors<br />
CA NCE Ministry: member of Steering<br />
Committee; StCom (= Deputy Minister<br />
+ 3 Presidents of Granting Councils);<br />
Agency = NCE directorate:<br />
organisation of all aspects of<br />
implementation; External experts:<br />
high level for selection committeed<br />
(recommendations) + peers for<br />
Interdisciplinary expert panel<br />
(technical reports)<br />
FI Technology Programmes Each programme has a steering<br />
group, an external programme<br />
director and a responsible person at<br />
Tekes. Large programmes<br />
additionally are divided into theme<br />
areas with its own steering group.<br />
projects might have their own<br />
advisory board or steering group as<br />
well.<br />
design process started in 1989 (chief<br />
scientist - prime minister). Got topic of<br />
elections and was approved in 1990.<br />
no linear process; Minister<br />
announced in 1989 programme<br />
during elections + 10 evaluation<br />
criteria; original intention: centre<br />
programme; pr. Designed in 1 year<br />
jointly with Research Councils<br />
result of the recommendations of<br />
several committees appointed by the<br />
Council of State in the early 1980 to<br />
overcome the economic recession<br />
and the problems based on structural<br />
changes<br />
FR PREDIT designed and funded by 4 ministries 3rd PREDIT programme launched in<br />
and 2 national agencies; managed by March 2002<br />
11 operational groups<br />
NL TS Ministry of Economic Affairs<br />
responsible for programme design,<br />
budgeting and supervision; Senter =<br />
programme manager; external<br />
to reinforce the co-operation between<br />
firms and knowledge institutes,<br />
government announced widening of<br />
its policy for promoting strategic co-<br />
experts for project evaluations and exoperation between high-tech firms<br />
post evaluations<br />
and the public research infrastructure<br />
by a new technological co-operation<br />
scheme, BTS<br />
NO TEFT TEFT is a national sub-programme<br />
within the MOBI programme and is<br />
financed by the Ministry for Local<br />
Government and Regional Affairs and<br />
the Ministry of Trade and Industry<br />
through the RCN. TEFT is governed<br />
by a combined mechanism of a<br />
board, or programme committee,<br />
elected by the RCN, a programme<br />
manager at the RCN, an<br />
implementation manager at SINTEF<br />
and a TEFT steering group.<br />
In 1989, the TEFT forerunner<br />
programme DTS was launched and<br />
ran for five years. basic idea was<br />
perceived need of firms to enhance<br />
their technological capacity through<br />
technology assistance (target group =<br />
SMEs); programme evaluated and<br />
further devolopped - TEFT<br />
2.2. MAP guidelines, underlying<br />
documents<br />
Guidleines have undergone several<br />
modifications (e.g. stornger emphasis<br />
on SMEs) but principly repained<br />
unchanged<br />
Pr. Follow laws from Tresury Board -<br />
evaluation every 5 year required<br />
There is a manual of about 15 pages<br />
for tasks of the programme manager<br />
and the steering group. Additionally,<br />
there exist a general guideline for<br />
evaluations of technology<br />
programmes<br />
small number of basis documents<br />
which provide the legal basis<br />
some legal acts<br />
National Budget; Programme<br />
catalogue for 2000 from the Research<br />
Council of Norway;