Perfect know-how hamburg offshore wind conference 12 ... - GL Group
Perfect know-how hamburg offshore wind conference 12 ... - GL Group
Perfect know-how hamburg offshore wind conference 12 ... - GL Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Hamburg Offshore Wind 2009<br />
Conference Programme<br />
Opening Day (11th of May 2009)<br />
6.00 p.m. Boat trip through Hamburg harbour starting at Landungsbrücken 6-9<br />
afterwards Conference Dinner at Au Quai Restaurant<br />
Conference Day (<strong>12</strong>th of May 2009)<br />
8.15 a.m. Registration and coffee<br />
9.15 a.m. Address of welcome; Peter Dalhoff (<strong>GL</strong>)<br />
Block 1:<br />
Progress of <strong>offshore</strong> <strong>wind</strong> in Germany<br />
9.30 a.m. BARD on the go <strong>offshore</strong>; Heiko Roß (BARD Engineering)<br />
9.55 a.m. Alpha Ventus Offshore Testfield – manufacturing and installation; Ralf Lamsbach (e.on), Irina Lucke (EWE)<br />
10.20 a.m. Baltic I, The first German <strong>offshore</strong> <strong>wind</strong> farm in the Baltic Sea; Stefan Kansy (EnBW)<br />
10.45 a.m. Discussion<br />
11.00 a.m. Coffee break<br />
Block 2:<br />
Progress of <strong>offshore</strong> <strong>wind</strong> in UK and other European countries<br />
11.40 a.m. Offshore Wind Farms in UK Round 3 and the Scottish Waters; Allan Mac Askill (SeaEnergy)<br />
<strong>12</strong>.05 p.m. Connecting <strong>offshore</strong> <strong>wind</strong> in Europe; Tilman Schwencke (Mainstream Renewable Power)<br />
<strong>12</strong>.30 p.m. New installation and service logistics for far distant <strong>offshore</strong> <strong>wind</strong> farms; Kaj Lindvig (A2SEA)<br />
<strong>12</strong>:55 p.m. Thanet Offshore Wind Farm – Project Management considerations; Michael Hotze (Noble Denton BOMEL)<br />
1.20 p.m. Discussion<br />
1.30 p.m. Lunch Break<br />
Block 3:<br />
Finance and cost modelling of <strong>offshore</strong> <strong>wind</strong> farms<br />
2.45 p.m. Operation and maintenance costs for <strong>offshore</strong> <strong>wind</strong> farms; Wilhelm Heckmann (<strong>GL</strong>), Peter Frohböse (<strong>GL</strong>)<br />
3.10 p.m. Economics, cash flow modelling and sensitivities of <strong>offshore</strong> <strong>wind</strong> farms; Stefan Küver (PricewaterhouseCoopers)<br />
3.35 p.m. Structured finance for <strong>offshore</strong> <strong>wind</strong> farms; Heiko Ludwig (Nord LB)<br />
4.00 p.m. Discussion<br />
4.05 p.m. Coffee break<br />
Block 4:<br />
New Technology<br />
4.30 p.m. The 10 MW vertical axis <strong>offshore</strong> <strong>wind</strong> turbine; Peter Hunter (VertAx Wind Ltd.)<br />
4.55 p.m. The Monopod Bucket Foundation – Recent experience and challenges ahead; Christian LeBlanc Bakmar (DONG Energy)<br />
5.20 p.m. Discussion<br />
5.25 p.m. Days closing; Peter Dalhoff (<strong>GL</strong>)<br />
A limited number of <strong>offshore</strong> <strong>wind</strong> players will have exhibition booths in the <strong>conference</strong> foyer. They will be happy to network with you during the breaks.