11.11.2013 Views

Perfect know-how hamburg offshore wind conference 12 ... - GL Group

Perfect know-how hamburg offshore wind conference 12 ... - GL Group

Perfect know-how hamburg offshore wind conference 12 ... - GL Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hamburg Offshore Wind 2009<br />

Conference Programme<br />

Opening Day (11th of May 2009)<br />

6.00 p.m. Boat trip through Hamburg harbour starting at Landungsbrücken 6-9<br />

afterwards Conference Dinner at Au Quai Restaurant<br />

Conference Day (<strong>12</strong>th of May 2009)<br />

8.15 a.m. Registration and coffee<br />

9.15 a.m. Address of welcome; Peter Dalhoff (<strong>GL</strong>)<br />

Block 1:<br />

Progress of <strong>offshore</strong> <strong>wind</strong> in Germany<br />

9.30 a.m. BARD on the go <strong>offshore</strong>; Heiko Roß (BARD Engineering)<br />

9.55 a.m. Alpha Ventus Offshore Testfield – manufacturing and installation; Ralf Lamsbach (e.on), Irina Lucke (EWE)<br />

10.20 a.m. Baltic I, The first German <strong>offshore</strong> <strong>wind</strong> farm in the Baltic Sea; Stefan Kansy (EnBW)<br />

10.45 a.m. Discussion<br />

11.00 a.m. Coffee break<br />

Block 2:<br />

Progress of <strong>offshore</strong> <strong>wind</strong> in UK and other European countries<br />

11.40 a.m. Offshore Wind Farms in UK Round 3 and the Scottish Waters; Allan Mac Askill (SeaEnergy)<br />

<strong>12</strong>.05 p.m. Connecting <strong>offshore</strong> <strong>wind</strong> in Europe; Tilman Schwencke (Mainstream Renewable Power)<br />

<strong>12</strong>.30 p.m. New installation and service logistics for far distant <strong>offshore</strong> <strong>wind</strong> farms; Kaj Lindvig (A2SEA)<br />

<strong>12</strong>:55 p.m. Thanet Offshore Wind Farm – Project Management considerations; Michael Hotze (Noble Denton BOMEL)<br />

1.20 p.m. Discussion<br />

1.30 p.m. Lunch Break<br />

Block 3:<br />

Finance and cost modelling of <strong>offshore</strong> <strong>wind</strong> farms<br />

2.45 p.m. Operation and maintenance costs for <strong>offshore</strong> <strong>wind</strong> farms; Wilhelm Heckmann (<strong>GL</strong>), Peter Frohböse (<strong>GL</strong>)<br />

3.10 p.m. Economics, cash flow modelling and sensitivities of <strong>offshore</strong> <strong>wind</strong> farms; Stefan Küver (PricewaterhouseCoopers)<br />

3.35 p.m. Structured finance for <strong>offshore</strong> <strong>wind</strong> farms; Heiko Ludwig (Nord LB)<br />

4.00 p.m. Discussion<br />

4.05 p.m. Coffee break<br />

Block 4:<br />

New Technology<br />

4.30 p.m. The 10 MW vertical axis <strong>offshore</strong> <strong>wind</strong> turbine; Peter Hunter (VertAx Wind Ltd.)<br />

4.55 p.m. The Monopod Bucket Foundation – Recent experience and challenges ahead; Christian LeBlanc Bakmar (DONG Energy)<br />

5.20 p.m. Discussion<br />

5.25 p.m. Days closing; Peter Dalhoff (<strong>GL</strong>)<br />

A limited number of <strong>offshore</strong> <strong>wind</strong> players will have exhibition booths in the <strong>conference</strong> foyer. They will be happy to network with you during the breaks.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!