City Plan 2009 - 2013 - City of Greater Geelong
City Plan 2009 - 2013 - City of Greater Geelong
City Plan 2009 - 2013 - City of Greater Geelong
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Budget <strong>2009</strong> - 2010<br />
Skilled Stadium is the home <strong>of</strong> AFL football in <strong>Geelong</strong><br />
and hosts many other sporting events each year.<br />
Buildings ($11.6M)<br />
For the <strong>2009</strong>-2010 year, $11.6M will be<br />
expended on building projects – upgrades<br />
$8.4M and new $3.2M. The more<br />
significant projects include Courthouse Arts<br />
redevelopment ($5.2M), Belmont Library<br />
upgrade ($0.6M), Disability Access program<br />
($0.3M), children’s services facilities upgrades<br />
($0.4M), community halls ($0.2M) and toilet<br />
block upgrades ($0.2M). New projects include<br />
civic accommodation ($1.0M), Leopold<br />
Community Hub ($0.6M) and Waurn Ponds<br />
Library ($0.4).<br />
Drainage ($3.1M)<br />
The more significant projects include drainage<br />
construction which is an ongoing program <strong>of</strong><br />
drainage related works including upgrading<br />
main drainage infrastructure ($1.6M), drainage<br />
renewal program ($0.7M), <strong>Geelong</strong> Ring Road<br />
retarding basins ($0.3M) and implementation <strong>of</strong><br />
the Stormwater Management <strong>Plan</strong> ($0.2M). An<br />
increased amount <strong>of</strong> $0.4M has been allocated<br />
in <strong>2009</strong>-2010 for drainage renewal programs.<br />
Computer Equipment ($1.8M)<br />
Expenditure on computer equipment renewal<br />
is proposed at $1.8M. The more significant<br />
projects include IT asset replacement program<br />
($1.0M), field communications system ($0.5),<br />
minor acquisitions program ($0.2M) and PAPL<br />
communications link ($0.2M).<br />
Streetscapes ($0.7M)<br />
For the <strong>2009</strong>-2010 year, $0.7M will be<br />
expended on streetscape projects. The more<br />
significant projects include Whittington Centre<br />
Hub landscaping, Portarlington streetscape<br />
and Western Wedge infrastructure –<br />
Cunningham Street.<br />
Footpaths ($2.0M)<br />
The ongoing footpath replacement program<br />
proposes $1.9M in <strong>2009</strong>-2010. Other<br />
expenditure includes bikepaths/walking tracks<br />
at St Leonards Lake.<br />
Kerb and Channel ($1.0M)<br />
The ongoing kerb and channel renewal<br />
program proposes $1.0M for replacement <strong>of</strong><br />
kerb and channel in full block sections, an<br />
increase <strong>of</strong> $0.1M over 2008-<strong>2009</strong>.<br />
Land ($2.6M)<br />
For the <strong>2009</strong>-2010 year, $2.6M will be<br />
expended on purchase <strong>of</strong> land including North<br />
Heales Road subdivision ($2.5M) and New<br />
Corio and Station Estates ($0.1M).<br />
Waste Collection ($1.2M)<br />
Further provision for Corio Landfill<br />
rehabilitation <strong>of</strong> ($1.0M) has been made in<br />
<strong>2009</strong>-2010. The ongoing program for new<br />
property mobile bins is $0.2M.<br />
Special Rates and Charges ($3.6M)<br />
For the <strong>2009</strong>-2010 year, $3.6M will be<br />
expended on Special Rates and Charges<br />
projects. This includes street construction<br />
($2.5M), drainage construction ($0.3M),<br />
footpath construction ($0.3M) and kerb and<br />
channel construction ($0.3M).<br />
Carried Forward Works ($28.0M)<br />
At the end <strong>of</strong> each financial year there are<br />
projects, which are either incomplete or<br />
not commenced due to planning issues,<br />
weather delays, extended consultation<br />
etc. For the 2008-<strong>2009</strong> project managers<br />
have estimated that $28.0M <strong>of</strong> capital<br />
works will be incomplete and be carried<br />
forward into the <strong>2009</strong>-2010 year. The more<br />
significant projects include the Leisurelink<br />
Aquatic Centre replacement ($13.8M), Corio<br />
Landfill rehabilitation ($2.6M), Vines Road<br />
development ($3.0M), North Heales Rd<br />
subdivision ($1.4M), Barwon Heads Skate<br />
Park ($0.5M), Waterfront timber decking<br />
replacement ($0.8M), Skilled Stadium turf<br />
replacement ($0.7M), and <strong>Geelong</strong> Motocross<br />
relocation ($0.7M).<br />
Back to<br />
table <strong>of</strong><br />
contents<br />
<strong>City</strong> <strong>Plan</strong> <strong>2009</strong>-<strong>2013</strong> | <strong>City</strong> <strong>of</strong> <strong>Greater</strong> <strong>Geelong</strong> 55