Appendix 2 (PDF - 2.3 MB) - City of Greater Geelong
Appendix 2 (PDF - 2.3 MB) - City of Greater Geelong
Appendix 2 (PDF - 2.3 MB) - City of Greater Geelong
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.0 Staged Work Plan and Indicative Costing<br />
3.4 Annual Maintenance<br />
Consideration needs to be given to the budget requirements <strong>of</strong><br />
maintaining play spaces which is carried out by <strong>City</strong> <strong>of</strong> <strong>Greater</strong> <strong>Geelong</strong><br />
outdoor staff. A tool has been developed to estimate staff required and<br />
associated annual cost to maintain the cities play spaces. Variables such<br />
as CPI, hourly rate <strong>of</strong> pay, number <strong>of</strong> new play spaces, on-costs and<br />
productivity rates may be adjusted in the spreadsheet tool to refine<br />
estimates as required. An indicative scenario is shown for Centre-based<br />
playgrounds and for those located in Public Open Space in the tables<br />
below.<br />
<strong>City</strong> <strong>of</strong> <strong>Greater</strong> <strong>Geelong</strong> Play Strategy <strong>Appendix</strong> 2 – Page 45