The following factors contributed to the lower usage: (1) Mountain Plaza Truck<br />

Stop closed after approximately 3 months of operation; (2) three facilities were<br />

not completed and placed into operation until October 2011; and (3) truck drivers<br />

were using TSE facilities at lower-than-projected levels. According to the<br />

TSE project final report, there are several other factors contributing to lower-thanprojected<br />

levels of use, including the fact that many major companies will not pay<br />

for their drivers to use the units, and that drivers remain skeptical of the<br />

equipment despite relatively low prices.<br />

TDOT believes that the project partners have a great deal of work to do to<br />

persuade truck drivers to use the facilities. Further, TDOT said that in the absence<br />

of a serious outreach effort or a significant spike in diesel fuel prices, TSE<br />

equipment usage is likely to remain low.<br />

In August 2012, TDOT communicated to the OIG that usage data collected for the<br />

first two quarters of 2012 indicate TSE vendors that have implemented proactive<br />

outreach efforts are achieving the best results. TDOT continues to encourage<br />

marketing of the TSE facilities. In addition, as noted in the TSE project final<br />

report, TDOT has employed billboard advertising and targeted magazine and<br />

website advertising to help make truck drivers aware of TSE facilities available in<br />

Tennessee. TDOT will also continue to work with TSE vendors and truck-stop<br />

owners to raise awareness and encourage truck drivers to increase their use of<br />

TSE facilities.<br />

However, unless TDOT can demonstrate a significant increase in usage of TSE<br />

facilities, project results will remain significantly overstated. TDOT could achieve<br />

a more accurate projection of results based on actual usage or a more realistic<br />

assumption for anticipated usage, rather than the 8 hours per day currently used.<br />

Use of Installed Rather Than Operable Facilities<br />

The 117 installed spaces<br />

used in the projected results<br />

calculation of the TSE<br />

project final report<br />

included 30 TSE units<br />

installed at the Mountain<br />

Plaza Truck Stop. The<br />

truck stop closed due to<br />

bankruptcy and subsequent<br />

foreclosure approximately<br />

3 months after the TSE<br />

facilities were placed into<br />

operation. The truck stop<br />

has remained closed and<br />

Boarded up Mountain PlazaTruck Stop.<br />

(EPA OIG Photo)<br />

13-R-0321 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!