(Insert Project Name) TENDER ENQUIRY DOCUMENTATION ...
(Insert Project Name) TENDER ENQUIRY DOCUMENTATION ...
(Insert Project Name) TENDER ENQUIRY DOCUMENTATION ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
IMPERIAL COLLEGE LONDON<br />
(<strong>Insert</strong> <strong>Project</strong> <strong>Name</strong>)<br />
Tender Enquiry Document<br />
(<strong>Insert</strong> Date)<br />
(<strong>Insert</strong> QS Company logo)<br />
SECTION 1 <strong>TENDER</strong> INFORMATION<br />
1.1 INTRODUCTION<br />
1.1.1 This Tender Enquiry Document has been prepared to invite a tender submission for (insert<br />
project name) located on the (insert location of the project) within Imperial College London’s<br />
(insert location of the campus).<br />
1.1.2 The key objective of the project is to complete the Works by (insert Completion Date). This is<br />
to enable (insert other objectives of this project, including any necessary phasing).<br />
1.1.3 The Employer is seeking a Design and Build Contractor who will play an active and positive<br />
role as a member of the project team, who has the ability to adapt to events as they occur,<br />
and who will take responsibility for the efficient design, management, control and prompt<br />
completion of all the Works in a cost effective manner.<br />
1.1.4 The Employers Works Information has been developed to RIBA Stage (insert RIBA stage)<br />
and has been issued to (insert number) Framework Main Contractors.<br />
1.1.5 The procurement strategy for the Works is based on the (insert procurement strategy and any<br />
staged procurement to different sections of Works, if any).<br />
1.1.6 A full copy of the Employer’s Works Information has (in CD ROM format) been issued directly<br />
to the following shortlisted MEP framework sub-contractors:<br />
• (insert MEP Framework Sub-Contractors name)<br />
• (insert MEP Framework Sub-Contractors name)<br />
• (insert MEP Framework Sub-Contractors name)<br />
As listed in more detail in Clause 1.3.20 of Volume 1 of the Employer’s Works Information.<br />
The Tenderer shall not seek any tenders from any other MEP Framework Sub Contractor.<br />
The MEP sub-contract tenders will be returned to the Tenderer 2 weeks prior to the Tender<br />
Return date to allow the responses to be reviewed, adjusted as necessary and a compliant<br />
MEP tender incorporated into the Tender Return.<br />
Please note that it will be the responsibility of the Tenderers to collate any tender queries from<br />
MEP sub-contractors, issue any additional information deemed necessary and to obtain<br />
tender returns from the MEP sub-contractors.<br />