28.12.2013 Views

(Insert Project Name) TENDER ENQUIRY DOCUMENTATION ...

(Insert Project Name) TENDER ENQUIRY DOCUMENTATION ...

(Insert Project Name) TENDER ENQUIRY DOCUMENTATION ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IMPERIAL COLLEGE LONDON<br />

(<strong>Insert</strong> <strong>Project</strong> <strong>Name</strong>)<br />

Tender Enquiry Document<br />

(<strong>Insert</strong> Date)<br />

(<strong>Insert</strong> QS Company logo)<br />

SECTION 1 <strong>TENDER</strong> INFORMATION (Cont’d)<br />

1.2 <strong>TENDER</strong> REQUIREMENTS (Cont’d)<br />

1.2.15 Confidentiality<br />

The Tenderers shall treat the details of the tender documentation as Private and Confidential<br />

and shall not divulge any of the information contained therein whatsoever to any third party or<br />

enable any third party to peruse or reproduce the said information for any use other that the<br />

purposes of preparing this Tender. In the event of a Tender not being submitted or accepted<br />

all documents, including drawings, shall be suitably discarded.<br />

1.2.16 Schedule of Rates / Bill of Quantities<br />

The Contractor will submit a detailed and quantified Schedule of Rates or Bill of<br />

Quantities in support of the measured works and such further details or analyses, as the<br />

Employer shall in his absolute discretion direct, with their tender submission.<br />

1.2.17 Mid-tender Meeting<br />

The Employer will hold a mid-tender meeting, separately with each Tenderer during the<br />

course of the tender period, the purpose of which will be to provide an opportunity for the<br />

Tenderers to clarify any issues associated with the tender requirements and ensure that they<br />

have sufficient information to return a compliant tender.<br />

It is anticipated that these will take place at Imperial College during the week commencing<br />

(insert date), the dates and time of which will be notified to Tenderers in due course.<br />

1.2.18 Tender Presentation<br />

The Tenderer will be required to attend a Tender Presentation following the submission of<br />

their tenders in order to explain aspects of their submission and provide evidence of their<br />

understanding of the requirements of the tender that they must fulfil.<br />

It is anticipated that these will take place at Imperial College during the week commencing<br />

(insert date), the dates and time of which will be notified to Tenderers in due course.<br />

1.2.19 Procurement of MEP Works<br />

Although (insert QS company) will issue a copy of Employer’s Works Information directly to<br />

the MEP sub-contractors, it is the responsibility of the Tenderer as the Principal Contractor to<br />

collate and manage the MEP tender queries, including the final review of the returned MEP<br />

tenders to ensure a compliant bid from the MEP sub-contractors.<br />

The Tenderer should also carry out and complete a due diligence review on the design<br />

compatibility of MEP works, including any necessary risk allowances for design development<br />

and site unknowns required to carry out a Design and Build Contract.<br />

Please note that it is also the Tenderer’s responsibility to manage the subsequent post<br />

contract performance of the MEP sub-contractor to carry out their contractual obligations<br />

under a Design and Build Contract.<br />

Page 5 of 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!