<strong>Pipeline</strong> <strong>Failure</strong> <strong>Investigation</strong> <strong>Report</strong><br />

PEPL submitted a return to service plan to <strong>PHMSA</strong> that included a temporary 20% pressure reduction and remediation <strong>of</strong><br />

anomalies found in a high resoultion MFL tool run. They subsequently remediated 30 anomalies with RPR less than 1.15 and<br />

replaced 912 feet <strong>of</strong> pipe. On 12/19/2009 the temporary pressure restriction was removed.<br />

ACTIVITY #: 122653<br />

OPERATOR ID #: 15105<br />

UNIT ID #: 4093<br />

NRC REPORT #: 881717<br />

INCIDENT REPORT # (FORM 7100.2): 20090030 -- 5319<br />

Region/State __Central_______________________<br />

Principal Investigator: _Roger Sneegas________<br />

Date: _10/12/2010________________________<br />

Reviewed by: __David Barrett__original initialed_______<br />

Title: __Director – Central Region___________________<br />

Date: __10/13/2010_________________________<br />

- 2 -<br />

Form 11 <strong>Pipeline</strong> <strong>Failure</strong> <strong>Investigation</strong> <strong>Report</strong> (Revised 03/07/08)