Pipeline Failure Investigation Report - PHMSA - U.S. Department of ...

Pipeline Failure Investigation Report - PHMSA - U.S. Department of ...

Pipeline Failure Investigation Report - PHMSA - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pipeline</strong> <strong>Failure</strong> <strong>Investigation</strong> <strong>Report</strong><br />

Pressure @ Time <strong>of</strong> <strong>Failure</strong> @ <strong>Failure</strong> Site<br />

N/A<br />

Pressure @ <strong>Failure</strong> Site: 795 psig at the Houstonia Station Elevation @ <strong>Failure</strong> Site: 660<br />

Pressure Readings @ Various Locations:<br />

Direction from <strong>Failure</strong> Site<br />

Location/M.P./Station # Pressure (psig) Elevation (ft msl) Upstream Downstream<br />

N/A<br />

Type <strong>of</strong> Product:<br />

Specific Gravity:<br />

Pressure @ Time <strong>of</strong> <strong>Failure</strong> (4)<br />

High Pressure Set Point:<br />

Specific Gravity: .55<br />

Pressure @ Time <strong>of</strong> <strong>Failure</strong> (4) 795 psig<br />

High Pressure Set Point: 830 psig<br />

Upstream Pump Station Data<br />

API Gravity:<br />

Flow Rate:<br />

Distance to <strong>Failure</strong> Site:<br />

Low Pressure Set Point:<br />

Upstream Compressor Station Data<br />

Flow Rate:<br />

Distance to <strong>Failure</strong> Site: 21.6 miles<br />

Low Pressure Set Point:<br />

N/A<br />

N/A<br />

Operating Pressure<br />

Max. Allowable Operating Pressure: 800 psig<br />

Determination <strong>of</strong> MAOP: 192.619 (c)<br />

Actual Operating Pressure: 795 psig<br />

Method <strong>of</strong> Over Pressure Protection: Engine safeties - first engine speed and torque, then shutdown.<br />

Relief Valve Set Point: 830 psig Capacity Adequate? Yes No<br />

Integrity Test After <strong>Failure</strong><br />

Pressure Test Conducted in place? (Conducted on Failed Components or Associated Piping): Yes No<br />

If NO, Tested after removal? Yes No<br />

Method: N/A<br />

Describe any failures during the test.<br />

N/A<br />

N/A<br />

Soil/water Conditions @ <strong>Failure</strong> Site<br />

Condition <strong>of</strong> and Type <strong>of</strong> Soil around <strong>Failure</strong> Site (Color, Wet, Dry, Frost Depth): Dry and very rocky<br />

N/A<br />

Type <strong>of</strong> Backfill (Size and Description): Rock<br />

4 Obtain event logs and pressure recording charts<br />

- 6 -<br />

Form 11 <strong>Pipeline</strong> <strong>Failure</strong> <strong>Investigation</strong> <strong>Report</strong> (Revised 03/07/08)