FLO-CERT GmbH Public Compliance Criteria List - Contract ...
FLO-CERT GmbH Public Compliance Criteria List - Contract ...
FLO-CERT GmbH Public Compliance Criteria List - Contract ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NSF Checklist CP 7.0 EN-GB<br />
31/10/2012<br />
<strong>FLO</strong><br />
Standard<br />
[<strong>FLO</strong> e.V.] or<br />
other<br />
Applicable<br />
for:<br />
CC No.<br />
<strong>FLO</strong>-<strong>CERT</strong> <strong>Compliance</strong> <strong>Criteria</strong> Rank 1 Rank 2 Rank 3 Rank 4 Rank 5<br />
Time<br />
<strong>Criteria</strong> Type<br />
A.2.3.8<br />
Cook Islands,<br />
Fiji, India,<br />
Kiribati,<br />
Marshall<br />
Islands,<br />
Micronesia,<br />
Federated<br />
States of,<br />
Nauru, Niue,<br />
Pakistan,<br />
Palau, Papua<br />
New Guinea,<br />
Samoa,<br />
Solomon<br />
Islands,<br />
Tokelau,<br />
Tonga,<br />
Tuvalu,<br />
Vanuatu,<br />
Wallis and<br />
Futuna<br />
Islands<br />
Promoting<br />
Body (CP<br />
Project)<br />
Cocoa, Dried<br />
fruit, Seed<br />
cotton<br />
A 2.3.0.13<br />
(Applies only if the organisation or the buyer<br />
was suspended since last audit) The company<br />
may continue to trade Fairtrade products with<br />
operators with whom they have signed contracts<br />
or with those with whom they have an ‘existing<br />
trade relationship’ for a period up-to 6 months<br />
from the date of suspension. Where written<br />
contracts exist the volumes stipulated in the<br />
contracts may be traded for a period up-to 6<br />
months. Where no written contracts exist the<br />
volume traded during the suspension period<br />
may not exceed the total volume purchased in 6<br />
of the previous 12 months.<br />
The PB<br />
knowingly<br />
exceeded 6<br />
months<br />
deadline or<br />
volume of<br />
the<br />
contracts<br />
OR signed<br />
new ones.<br />
The PB was<br />
not properly<br />
informed<br />
and<br />
exceeded 6<br />
months<br />
deadline or<br />
volume of<br />
the contract<br />
OR signed<br />
new ones.<br />
The PB<br />
exceeds<br />
volumes of<br />
the contract<br />
by < 5%<br />
and/or 6<br />
months<br />
deadline by<br />
less than a<br />
week.<br />
The PB did<br />
not exceed<br />
6 months<br />
deadline or<br />
volume of<br />
the contract.<br />
0<br />
M<br />
Page40 of 149