Budget statements for principal activities (continued)<br />

Capital works projects (continued)<br />

Project Description Location <strong>2009</strong>-10 2010-11 2011-12<br />

Bosun Lane to Rosehill Ave<br />

- Pathway 150mm Main<br />

Construction of a 150mm<br />

diameter main along<br />

Pathway between Bosun<br />

Lane & Rosehill Ave (50m)<br />

Port Macquarie 9,891<br />

Campbell St. Wauchope_<br />

High St. to Walters St.<br />

Construction of 280m of<br />

DN200 along Campbell St.<br />

&180m of DN150, only 80%<br />

of DN200 in DSP<br />

Wauchope 71,624<br />

Cowarra Dam <strong>Council</strong><br />

Funded Works<br />

Cowarra Dam Water<br />

Quality Monitoring<br />

Stages 2,3,4 Crayfish<br />

restocking Programme &<br />

Environmental Flow<br />

Release System<br />

Provision of real-time algae<br />

& additional water quality<br />

monitoring in the Cowarra<br />

Dam storage.<br />

<strong>Hastings</strong> 30,000 31,500 11,025<br />

<strong>Hastings</strong> 55,125<br />

Dam Safety Studies Dam Safety and Dam Break <strong>Hastings</strong> 100,000<br />

Studies for PM and Cowarra<br />

Dams<br />

Developer Provided Assets Survey, investigation and<br />

design of water supply<br />

works contained in the<br />

water supply rolling works<br />

programme.<br />

Various 500,000 500,000<br />

Developer Provided Assets Various 500,000<br />

Developer Works<br />

Various trunkmain projects<br />

to cater for development<br />

works occurring in advance<br />

of DSP works<br />

<strong>Hastings</strong> 300,000 315,000 330,750<br />

Filling Stations - Electronic<br />

Metering<br />

Installation of electronic<br />

metering and access control<br />

system at Laurieton Depot,<br />

Area 13 and Area 14 to<br />

monitor & record water<br />

usage by registered tanker<br />

operators<br />

Camden Haven 26,250<br />

Flowmeter Installations &<br />

Upgrading<br />

Installation and upgrading of<br />

water supply flowmeters<br />

<strong>Hastings</strong> 50,000 52,500 55,125<br />

Fluoridation Facilities at<br />

Rosewood Reservoirs<br />

Design & construction of<br />

fluoridation facilities at the<br />

Rosewood Reservoir to<br />

treat water supplied to<br />

Wauchope, PM & Cowarra<br />

Dams<br />

Flynn St. Flynns Beach _ Construction of 105m (was<br />

Pacific Dr. to Chalmers St. - 320m) of DN200 along<br />

200mm<br />

Flynn St. (80%G)<br />

<strong>Hastings</strong> 1,533,000 420,000<br />

Port Macquarie 25,580<br />

Port Macquarie-<strong>Hastings</strong> <strong>Council</strong> <strong>Corporate</strong> <strong>Plan</strong> <strong>2009</strong>-<strong>2012</strong> <strong>Part</strong> B 36