Budget statements for principal activities (continued)<br />
Capital works projects (continued)<br />
Project Description Location <strong>2009</strong>-10 2010-11 2011-12<br />
Bosun Lane to Rosehill Ave<br />
- Pathway 150mm Main<br />
Construction of a 150mm<br />
diameter main along<br />
Pathway between Bosun<br />
Lane & Rosehill Ave (50m)<br />
Port Macquarie 9,891<br />
Campbell St. Wauchope_<br />
High St. to Walters St.<br />
Construction of 280m of<br />
DN200 along Campbell St.<br />
&180m of DN150, only 80%<br />
of DN200 in DSP<br />
Wauchope 71,624<br />
Cowarra Dam <strong>Council</strong><br />
Funded Works<br />
Cowarra Dam Water<br />
Quality Monitoring<br />
Stages 2,3,4 Crayfish<br />
restocking Programme &<br />
Environmental Flow<br />
Release System<br />
Provision of real-time algae<br />
& additional water quality<br />
monitoring in the Cowarra<br />
Dam storage.<br />
<strong>Hastings</strong> 30,000 31,500 11,025<br />
<strong>Hastings</strong> 55,125<br />
Dam Safety Studies Dam Safety and Dam Break <strong>Hastings</strong> 100,000<br />
Studies for PM and Cowarra<br />
Dams<br />
Developer Provided Assets Survey, investigation and<br />
design of water supply<br />
works contained in the<br />
water supply rolling works<br />
programme.<br />
Various 500,000 500,000<br />
Developer Provided Assets Various 500,000<br />
Developer Works<br />
Various trunkmain projects<br />
to cater for development<br />
works occurring in advance<br />
of DSP works<br />
<strong>Hastings</strong> 300,000 315,000 330,750<br />
Filling Stations - Electronic<br />
Metering<br />
Installation of electronic<br />
metering and access control<br />
system at Laurieton Depot,<br />
Area 13 and Area 14 to<br />
monitor & record water<br />
usage by registered tanker<br />
operators<br />
Camden Haven 26,250<br />
Flowmeter Installations &<br />
Upgrading<br />
Installation and upgrading of<br />
water supply flowmeters<br />
<strong>Hastings</strong> 50,000 52,500 55,125<br />
Fluoridation Facilities at<br />
Rosewood Reservoirs<br />
Design & construction of<br />
fluoridation facilities at the<br />
Rosewood Reservoir to<br />
treat water supplied to<br />
Wauchope, PM & Cowarra<br />
Dams<br />
Flynn St. Flynns Beach _ Construction of 105m (was<br />
Pacific Dr. to Chalmers St. - 320m) of DN200 along<br />
200mm<br />
Flynn St. (80%G)<br />
<strong>Hastings</strong> 1,533,000 420,000<br />
Port Macquarie 25,580<br />
Port Macquarie-<strong>Hastings</strong> <strong>Council</strong> <strong>Corporate</strong> <strong>Plan</strong> <strong>2009</strong>-<strong>2012</strong> <strong>Part</strong> B 36