The Antonine Wall Management Plan 2013-18 - Glasgow City Council
The Antonine Wall Management Plan 2013-18 - Glasgow City Council
The Antonine Wall Management Plan 2013-18 - Glasgow City Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Strategic Environmental Assessment: Environmental Report<br />
AIM 3: REALISE THE WORLD HERITAGE SITE’S FULL POTENTIAL AS AN EDUCATION AND LEARNING RESOURCE<br />
SEA topics Biodiversity, flora and fauna Material assets Cultural heritage Landscape and geodiversity Summary and mitigation<br />
will the management plan<br />
objective…<br />
Medium-term issues/<br />
objectives<br />
• prevent damage and<br />
encourage favourable<br />
condition to designated sites<br />
and protected species and<br />
undesignated biodiversity,<br />
flora and fauna?<br />
• promote and enhance where<br />
appropriate enjoyment<br />
and understanding of the<br />
site from a natural heritage<br />
perspective?<br />
• contribute to effective<br />
adaptation to potential<br />
impacts of climate change on<br />
natural heritage?<br />
• maintain or enhance (where<br />
appropriate) the tourism<br />
resource of the WHS and the<br />
wider area?<br />
• support national forestry<br />
policy?<br />
• protect and where<br />
appropriate enhance the<br />
historic environment?<br />
• promote positive effects for<br />
the historic environment<br />
through land management?<br />
• promote and enhance where<br />
appropriate enjoyment and<br />
understanding of the site<br />
from a cultural heritage<br />
perspective?<br />
• contribute to effective<br />
adaptation to potential<br />
impacts of climate change on<br />
cultural heritage?<br />
• protect and enhance the<br />
landscape and geodiversity<br />
value of the WHS?<br />
• promote positive effects for<br />
the landscape through land<br />
management?<br />
• contribute to effective<br />
adaptation to potential<br />
impacts of climate change on<br />
the landscape?<br />
• promote and enhance where<br />
appropriate enjoyment<br />
and understanding of<br />
the landscape value and<br />
geodiversity of the site?<br />
Issue: Strengthening the use of the ANTONINE WALL WHS in formal education<br />
Objective 3.1<br />
To develop and implement<br />
an education strategy for<br />
the ANTONINE WALL WHS<br />
Objective 3.2<br />
To promote UNESCO WHS<br />
values<br />
Objective 3.3<br />
To strengthen international<br />
education links between<br />
FRE Partners<br />
Objective 3.4<br />
To encourage CPD<br />
opportunities for<br />
education staff, to build<br />
capacity in teaching about<br />
the ANTONINE WALL WHS<br />
This group of MP objectives has<br />
the potential to contribute to<br />
an increased understanding<br />
and enjoyment of the natural<br />
heritage values of the site.<br />
However, the degree to which<br />
this might occur is not clear at<br />
this level, and the effects are<br />
likely to be neutral without<br />
further measures to ensure<br />
this objective is embedded in<br />
delivery of these MP objectives.<br />
<strong>The</strong>re are no strong links<br />
between this group of MP<br />
objectives and the tourism<br />
resource and forestry strategy<br />
objective, so the effect will be<br />
neutral.<br />
This group of MP objectives<br />
relates directly to the promotion<br />
and enhancement of enjoyment<br />
and understanding of the<br />
site from a cultural heritage<br />
perspective.<br />
This group of MP objectives has<br />
the potential to contribute to<br />
an increased understanding and<br />
enjoyment of the landscape and<br />
geodiversity values of the site.<br />
However, the degree to which<br />
this might occur is not clear at<br />
this level, and the effects are<br />
likely to be neutral without<br />
further measures to ensure<br />
this objective is embedded in<br />
delivery of these MP objectives.<br />
As this group of objectives is<br />
likely to focus on the historic<br />
environment values of the site,<br />
neutral effects are likely for<br />
the majority of environmental<br />
objectives. However, there is<br />
potential to introduce positive<br />
effects for other aspects of the<br />
environment.<br />
Recommendation: the<br />
sustainability checklist<br />
should be applied to actions<br />
which contribute to these MP<br />
objectives, to ensure that wider<br />
environmental objectives are<br />
embedded in the delivery of<br />
the plan.<br />
67