Strategic Environmental Assessment: Environmental Report<br />
Issue: Impact of climate change<br />
Objective 5.5<br />
Identify areas of the site at risk<br />
from climate change and integrate<br />
monitoring, mitigation and<br />
adaptation measures<br />
Objective 5.6<br />
Implement and monitor measures<br />
to improve sustainability and<br />
energy efficiency in relation to site<br />
management<br />
<strong>The</strong>se MP objectives will allow<br />
the plan to contribute to<br />
effective adaptation to potential<br />
impacts of climate change on<br />
natural heritage.<br />
<strong>The</strong>re are no strong links<br />
between these MP objectives<br />
and the material assets<br />
objectives.<br />
<strong>The</strong>se MP objectives will<br />
allow the plan to contribute<br />
to effective adaptation to<br />
potential impacts of climate<br />
change on cultural heritage.<br />
<strong>The</strong>se MP objectives will allow<br />
the plan to contribute to<br />
effective adaptation to potential<br />
impacts of climate change on<br />
landscape value and geodiversity<br />
Overall, the effects of these<br />
objectives will be positive.<br />
Recommendation: the<br />
sustainability checklist<br />
should be applied to actions<br />
which contribute to these<br />
MP objectives, to ensure<br />
that a holistic environmental<br />
approach is taken to their<br />
delivery.<br />
71