ICRISAT - ICRISAT: Medium Term Plan 2010-12 - 2010-12
ICRISAT - ICRISAT: Medium Term Plan 2010-12 - 2010-12
ICRISAT - ICRISAT: Medium Term Plan 2010-12 - 2010-12
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 1. <strong>ICRISAT</strong> Projects Budgets 2008-2009<br />
MTP Project<br />
Expenditure<br />
Estimate $<br />
2008<br />
Expenditure<br />
Estimate $<br />
2009<br />
System<br />
Priority<br />
1. Improving policies and<br />
facilitating institutional<br />
innovation, markets and<br />
impact to support the<br />
sustained reduction of<br />
poverty and hunger in<br />
the SAT<br />
2. Sustaining biodiversity<br />
of sorghum, pearl millet,<br />
small millets, groundnut,<br />
pigeonpea and chickpea<br />
for current and future<br />
generations<br />
3. Producing more and<br />
better food at lower cost<br />
of the staple cereals and<br />
legumes of the WCA SAT<br />
(sorghum, pearl millet<br />
and groundnut) through<br />
genetic improvement<br />
4. Producing more and<br />
better food at lower cost<br />
of the staple cereals and<br />
legumes of the ESA SAT<br />
(sorghum, millets,<br />
groundnut, pigeonpea<br />
and chickpea) through<br />
genetic improvement<br />
5. Producing more and<br />
better food at lower cost<br />
of staple cereal and<br />
legume hybrids in the<br />
Asian SAT (sorghum,<br />
pearl millet and<br />
pigeonpea) through<br />
genetic improvement<br />
6. Producing more and<br />
better food at lower cost<br />
of staple open-pollinated<br />
cereals and legumes in<br />
the Asian SAT (sorghum,<br />
millets, pigeonpea,<br />
chickpea and groundnut)<br />
through genetic<br />
improvement<br />
7. Reducing rural poverty<br />
through agricultural<br />
diversification and<br />
emerging opportunities<br />
for high-value<br />
commodities (HVCs) and<br />
products<br />
$6.399M $6.555M 5 (A-D)<br />
$5.546M $5.895M 1 (A-B)<br />
$7.460M $7.408M 2 (A-C)<br />
$5.064M $4.735M 2 (A-C)<br />
$3.198M $3.525M 2 (A-C)<br />
$5.475M $6.091M 2 (A-C)<br />
$3.842M $3.975M 3 (A,B,D)<br />
<strong>ICRISAT</strong> MTP <strong>2010</strong>-<strong>12</strong> 7