Strategic Asset Under Development<br />

<strong>Project</strong> Expenditure to date of $61m 1<br />

Phase 1 and 2a Exploration programme completed successfully and on time<br />

Phase 1 - 16 drill holes completed (6,577m) and 34km 2D seismic survey<br />

Phase 2a - 20 drill holes completed (5,377m) and 169km 2D seismic survey<br />

Large, Shallow, <strong>High</strong>-<strong>Grade</strong> Mineral Resource Estimate delivered<br />

Continuous high grade sylvinite horizon supports conventional underground mining with low cash costs<br />

Feasibility Study process test work completed – excellent results<br />

Coarsely inter-grown sylvinite, low insolubles and high recoveries demonstrated through simple floatation<br />

Pre Feasibility phase engineering completed<br />

Engineering work completed and cost estimation underway<br />

New target generation exercise delineates two potentially significant potash domains<br />

Kola <strong>High</strong> priority one target interpreted to have an increased aerial extent of 200%<br />

1. <strong>Project</strong> Expenditure as at end April 2012<br />

Strategic World Class <strong>Potash</strong> <strong>Project</strong><br />

9