Revised <strong>Project</strong> Configuration<br />
Base case for PFS<br />
● Conventional Mining producing 2Mtpy MoP<br />
Focus on sylvinite, start-up 2015<br />
● Road transport of ROM ore on dedicated haul road<br />
using Australian style high volume road trains.<br />
● Service road upgrade<br />
● Central scalable process plant located at the coast<br />
<br />
<br />
Good flotation kinetics<br />
Excellent process recovery<br />
<br />
Brine disposal in the ocean<br />
● 42 MW Required from national grid<br />
<br />
Investigate Gas fired self generation in parallel<br />
● Gas line for product drying – 2,820 scm/h<br />
● Water sourced from ocean and/or nearby lakes<br />
● Jetty facility at Tchiboula adjacent to plant – trans<br />
shipment<br />
● Employment of approximately 800 people<br />
Strategic World Class <strong>Potash</strong> <strong>Project</strong><br />