Revised <strong>Project</strong> Configuration<br />

Base case for PFS<br />

● Conventional Mining producing 2Mtpy MoP<br />

Focus on sylvinite, start-up 2015<br />

● Road transport of ROM ore on dedicated haul road<br />

using Australian style high volume road trains.<br />

● Service road upgrade<br />

● Central scalable process plant located at the coast<br />

<br />

<br />

Good flotation kinetics<br />

Excellent process recovery<br />

<br />

Brine disposal in the ocean<br />

● 42 MW Required from national grid<br />

<br />

Investigate Gas fired self generation in parallel<br />

● Gas line for product drying – 2,820 scm/h<br />

● Water sourced from ocean and/or nearby lakes<br />

● Jetty facility at Tchiboula adjacent to plant – trans<br />

shipment<br />

● Employment of approximately 800 people<br />

Strategic World Class <strong>Potash</strong> <strong>Project</strong><br />