04.02.2014 Views

Low-Cost, High-Grade, Sylvinite Potash Project (Presentation)

Low-Cost, High-Grade, Sylvinite Potash Project (Presentation)

Low-Cost, High-Grade, Sylvinite Potash Project (Presentation)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Strategic Location<br />

● Established Infrastructure<br />

● Deep water port and industrial hub at Pointe Noire<br />

<br />

90km from Sintoukola site, mostly bitumen road<br />

● Egis reports a current power surplus of 141MW (vs. Sintoukola<br />

estimate requirement of 42MW)<br />

● Strong relationship with the government and local partner will<br />

help support future product development<br />

● The Company is expected to enjoy a relatively favourable fiscal<br />

regime<br />

● Strong support from local communities and regional government<br />

● Good relationship with active NGOs<br />

Source: NI 43-101 Technical Report, Sintoukola <strong>Potash</strong> <strong>Project</strong>, June 2011; Elemental Prospectus; all available at www.sedar.com<br />

Strategic World Class <strong>Potash</strong> <strong>Project</strong><br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!