29.10.2012 Views

Excellence on Board - Marine Engines Caterpillar

Excellence on Board - Marine Engines Caterpillar

Excellence on Board - Marine Engines Caterpillar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Main c<strong>on</strong>centrati<strong>on</strong> is <strong>on</strong> feeder ships with a capacity of 700 TEU<br />

the work procedures and has acquired<br />

many new c<strong>on</strong>tracts. The order book<br />

now stands, in November 2005, at thirty<br />

ships totaling approximately 260,000<br />

DWT with delivery dates extending<br />

to 2008 and a c<strong>on</strong>verted value of half<br />

a billi<strong>on</strong> US dollars. In the current year,<br />

2005, ten ships have been delivered<br />

totaling 65,200 DWT.<br />

Am<strong>on</strong>g the new ships, the main c<strong>on</strong>centrati<strong>on</strong><br />

is <strong>on</strong> feeder ships with a<br />

capacity of 700 TEU, for which twentyseven<br />

orders had been received by the<br />

beginning of November 2005. The yard<br />

places great value <strong>on</strong> the fact that the<br />

fourth ship in this series could be delivered<br />

at the end of 2004, <strong>on</strong>e hundred<br />

days before the c<strong>on</strong>tractual date, an<br />

extremely satisfactory result for the<br />

shipping line and Germanischer Lloyd –<br />

the classificati<strong>on</strong> society – and also, of<br />

course, for the yard itself.<br />

700-TEU ships in sixty days<br />

A building time of sixty days, if possible<br />

even less, is the target for these<br />

700-TEU ships. In order to achieve this<br />

objective, appropriate preliminary work<br />

and an increase in the preliminary fitting-out<br />

of the secti<strong>on</strong>s is to be further<br />

advanced.<br />

A c<strong>on</strong>tract has recently been accepted<br />

for the building of a further series. This<br />

involves C<strong>on</strong>Ro ships of 7300 DWT and<br />

the yard looks forward to this c<strong>on</strong>tract<br />

training the pers<strong>on</strong>nel to meet higher<br />

technical demands. The first ship of<br />

this more demanding type is already<br />

being built.<br />

The yard‘s technical center is composed<br />

of seventy engineers and technicians,<br />

who are capable of independent<br />

development and research.<br />

In order to support this, cooperati<strong>on</strong><br />

with internati<strong>on</strong>ally famous design<br />

offices has been introduced in past<br />

years. As an example, the most highly<br />

developed 2300 cubic meter dredger<br />

in the country was undertaken jointly<br />

with the Netherlands IHC company in<br />

14<br />

the middle of 1980 and was delivered<br />

at the end of the Eighties.<br />

Finally, various types of ship which<br />

will provide the basis for the future<br />

success of the Fujian yard have been<br />

designed in cooperati<strong>on</strong> with German,<br />

Swedish, Netherlands and Singapore<br />

design offices. This was also reflected<br />

in the award of numerous decorati<strong>on</strong>s,<br />

the yard receiving for example<br />

the “Fujian Province Science and Technology<br />

Progress Sec<strong>on</strong>d Award in the<br />

year 1994” for its 7300 DWT multipurpose<br />

c<strong>on</strong>tainer ship. This was followed<br />

by the “Nati<strong>on</strong>al New Product<br />

Award in the year 1997”, together with<br />

“Fujian Province Science and Technology<br />

Sec<strong>on</strong>d Award in the year 1997” for<br />

the 660-TEU c<strong>on</strong>tainer ship. The design<br />

for an 820-TEU c<strong>on</strong>tainer ship was decorated<br />

with the “Fujian Province Excellent<br />

New Product Sec<strong>on</strong>d Award in<br />

the year 2000”, followed by that of the<br />

“Fujian Province Excellent New Product<br />

Third Award in the year 2004”.<br />

The yard points out that it is, of<br />

course, also in a positi<strong>on</strong> to build ships<br />

other than c<strong>on</strong>tainer ships and multipurpose<br />

freighters. It can also produce<br />

more difficult ships, such as the two<br />

offshore supply vessels of the Norwe-<br />

gian UT-780 type for Singapore clients.<br />

The yard was certified to ISO 1001:2000<br />

<strong>on</strong> 31 December 2003.<br />

Well-functi<strong>on</strong>ing c<strong>on</strong>necti<strong>on</strong>s with<br />

internati<strong>on</strong>al suppliers<br />

Since the beginning of the export shipbuilding<br />

in the mid-Eighties, the yard<br />

has gradually built up extremely wellfuncti<strong>on</strong>ing<br />

c<strong>on</strong>necti<strong>on</strong>s with internati<strong>on</strong>ally<br />

recognized material and equipment<br />

suppliers, particularly those from<br />

Europe. In additi<strong>on</strong> to <strong>Caterpillar</strong>, these<br />

include GEA, Alfa Laval and numerous<br />

others. For fitting out the new 700-TEU<br />

building series, for example, the yard<br />

has ordered some thirty MaK propulsi<strong>on</strong><br />

installati<strong>on</strong>s with a total power of<br />

200,000 kW. A professi<strong>on</strong>ally operating<br />

purchase department ensures that the<br />

orders are dealt with smoothly and this<br />

is an important factor in achieving the<br />

producti<strong>on</strong> and social targets of the c<strong>on</strong>cern.<br />

Hangars with a total area of 12,000<br />

square meters are available for the storage<br />

of material and equipment. Overall,<br />

Fujian Mawei Shipbuilding Ltd. c<strong>on</strong>siders<br />

that it is well placed in the internati<strong>on</strong>al<br />

market – and it is making great<br />

efforts to further improve this positi<strong>on</strong>.<br />

More difficult ships as this offshore supply vessel of Norwegian UT-780 type are also<br />

in the portfolio

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!