D. ORGANIZATIONAL CHART OF PROPOSED TEAM Lillian M. Reyes, P.E. President & Principal Engineer Electrical Design Associates, Inc. Instrumentation Project Engineer Graphics/Cadd Dept. John Newton Instrumentation Designer Dameion Donaldson, P.E. Electrical Engineer Ryan Meeks Designer STANDARD FORM 330 (6/2004) Page 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM Lillian M. Reyes, P.E. 15. FIRM NAME AND LOCATION (City and State) Electrical Design Associates, Inc. / Delray Beach Florida Atlantic University Bachelors of Science in Electrical Engineering, 1988 President / Principal Engineer 23 13 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer – Florida 50780 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society (FES) National Fire Protection Association (NFPA) Illuminating Engineering Society (IES) International Association of Electrical Inspectors (IAEI) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Duck Key Lift Station Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Florida Keys Aqueduct Authority, Florida 2008 Ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical and Instrumentation design associated with the addition of a sanitary collection system at Duck key. The stations will allow the FKAA the ability to pump wastewater to the WWTP located on the island. The design also includes the ability add low pressure systems to the residential properties. The estimated cost of the station is approximately $4,000,000.00, with the MEP portion at approximately $850,000.00. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Region Pump Station PROFESSIONAL SERVICES Palm Beach County, Florida 2006 2008 CONSTRUCTION (If applicable) b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical, Instrumentation, HVAC and Plumbing design associated with proposed pump station. The station will allow the County the ability to pump both water and wastewater through the facility. The design also included a standby generator system sized to support the facility in the event of a power failure. The estimated cost of the station is approximately $8,000,000.00, with the MEP portion at approximately $1,800,000.00. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Wastewater Lift Station Rehabilitation PROFESSIONAL SERVICES Palm Beach County 2007 2008 CONSTRUCTION (If applicable) c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical design associated with the improvements at lift stations 102, 243, 312, 348, 1024 and 5195. Design includes standby generators, Pump Control Panels and Remote Telemetry Equipment in accordance with County Standards. The estimated cost of the station is approximately $2,000,000.00, with the Electrical Improvements at approximately $400,000.00. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Area 11 Reclaimed Water Booster Station PROFESSIONAL SERVICES City of Delray Beach, Florida 2008 2009 CONSTRUCTION (If applicable) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical and Instrumentation design associated with City’s an inline booster pump station to take reclaimed water from the existing effluent/outfall pipe and boost the pressure necessary to convey the reclaimed water through a new reclaimed water distribution system that serves the City's barrier island. The estimated cost of the station is approximately $2,800,000.00, with the Electrical Improvements at approximately $600,000.00. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Duck key Reclaimed Water Pumping Facility PROFESSIONAL SERVICES Florida Keys Aqueduct Authority, Florida 2005 2007 CONSTRUCTION (If applicable) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical and Instrumentation design associated with proposed reclaimed water pumping station. The new reclaimed water storage and pumping facility serves the existing reclaimed water use areas at the Hawk’s Cay Resort, as well as the new reclaimed water use area in Duck Key residential neighborhood. The estimated cost of the station is approximately $2,100,000.00, with the Electrical Improvements at approximately $500,000.00. STANDARD FORM 330 (6/2004) PAGE 3