04.03.2014 Views

IFTMIN Shipping Instruction From Customer To INTTRA EDIFACT ...

IFTMIN Shipping Instruction From Customer To INTTRA EDIFACT ...

IFTMIN Shipping Instruction From Customer To INTTRA EDIFACT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

detailed in <strong>INTTRA</strong> Connectivity Guide.<br />

2. Upon receipt of <strong>Customer</strong> <strong>IFTMIN</strong>, <strong>INTTRA</strong>’s EDI Translation Software can optionally return an <strong>EDIFACT</strong><br />

CONTRL message. Please advise your <strong>INTTRA</strong> Project Manager if you wish to receive CONTRL messages.<br />

3. <strong>INTTRA</strong>’s proprietary Portal Application, <strong>INTTRA</strong>Works, performs message validation and formats the<br />

<strong>Shipping</strong> <strong>Instruction</strong> to destination carrier’s specification (<strong>INTTRA</strong> <strong>EDIFACT</strong> <strong>IFTMIN</strong> or UCA PDF).<br />

4. Upon receipt of <strong>IFTMIN</strong> from <strong>INTTRA</strong>, Carrier system issues an EDI functional acknowledgment in the form<br />

of an <strong>EDIFACT</strong> CONTRL to <strong>INTTRA</strong>. <strong>INTTRA</strong> receives and processes Carrier Acknowledgment. Carriers<br />

who receive a UCA PDF do not issue an EDI functional acknowledgement to <strong>INTTRA</strong>.<br />

5. Upon receipt of a CONTRL from the Carrier, <strong>INTTRA</strong> optionally issues <strong>EDIFACT</strong> APERAK to customer<br />

indicating acceptance or rejection of the <strong>Shipping</strong> <strong>Instruction</strong> message by the carrier (as indicated in Carrier<br />

CONTRL/997 to <strong>INTTRA</strong>). Please advise your <strong>INTTRA</strong> Project Manager if you wish to receive APERAK<br />

messages.<br />

The <strong>INTTRA</strong> Global <strong>Customer</strong> Support team handles all errors, utilizing a comprehensive message monitoring<br />

system.<br />

V. Acknowledgments<br />

A. CONTRL Message<br />

Please refer to <strong>INTTRA</strong> CONTRL 99B Implementation Guide for message specifications.<br />

B. APERAK Message<br />

Please refer to <strong>INTTRA</strong> APERAK 99B Implementation Guide for message specifications.<br />

VI.<br />

<strong>IFTMIN</strong> Message Specification<br />

A. Changes from version 3.01 (November 2009) to version 3.02 (May 2010)<br />

Group11-0580-NAD-3035: Revised comments for “MR” qualifier.<br />

Group12-0620-CTA: Revised comments for Notification Contact (NT).<br />

Group12-0620-CTA-3139: Revised comments for “NT” qualifier.<br />

Group12-0620-COM: Revised comments for Notification Contact (NT).<br />

B. Changes from version 3.0 (August 2009) to version 3.01 (November 2009)<br />

Group9-0520-LOC-C517,3224: Revised element comment.<br />

C. Changes from version 1.4 (November 2006) to version 3.0 (August 2009)<br />

0050-DTM: Reduced max use from 9 to 1 to only pass document date.<br />

0060-TSR: Reduced max use from 9 to 1 to only pass one move type.<br />

0090-FTX: Added comments to describe customs filing requirements for Canada and US.<br />

0090-FTX-4451: Added qualifier "CCI" Customs Clearance <strong>Instruction</strong>s.<br />

0090-FTX-4451: Removed qualifier "RQT" Special Routing <strong>Instruction</strong>s.<br />

0090-FTX-C107,4441: Added qualifier "MFS" Manifest Filer Status<br />

0090-FTX-C108,4440(2) opened for "Manifest Filing Country"<br />

0090-FTX_C108,4440(3) opened for "Manifest Filer Identification".<br />

0090-FTX-4451: Added qualifier "DOC" Document <strong>Instruction</strong><br />

0090-FTX-C107,4441: Added qualifier "SMI" Single Message Indicator<br />

Version 3.02 Page 10 of 159<br />

Copyright 2009 <strong>INTTRA</strong> Inc. All rights reserved. May, 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!