Ward Improvement Plan:<br />
<strong>Finsbury</strong> <strong>Park</strong><br />
Scheme location and details Description of scheme Why Investment is needed<br />
Andover Estate - environmental<br />
<strong>improvement</strong>s<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
1 - High<br />
£280,000<br />
Funds secured: £144,281<br />
Estate <strong>improvement</strong>s<br />
Estate security / permeability<br />
To carry out a range of landscape, conservation and<br />
environmental <strong>improvement</strong>s to the entire estate<br />
following years of neglect, through continued<br />
regeneration of housing stock and other associated<br />
building/construction works.<br />
Develop a master <strong>plan</strong> for improving green spaces<br />
throughout the estate, focusing on improving verges,<br />
rationalising hedge <strong>plan</strong>ting, tree pits and areas at the<br />
perimeter of the estate. This element of the proposal<br />
does not include <strong>improvement</strong>s to large open green<br />
space or the creation of any new amenity, play or<br />
community gardening spaces.<br />
Money is also needed for a redundant kickabout area<br />
and the conversion of Sue Davies football pitch to a<br />
community garden.<br />
10 new PTZ cameras would be provided on the main<br />
thoroughfares on the entire estate (cost £140k),<br />
lighting would be provided and underground garages<br />
at old Andover would be refurbished.<br />
S106 allocated from 67-83 Seven Sisters Rd<br />
(£184,281.30, 07/2012) to<strong>ward</strong>s improved pedestrian<br />
permeability, security/CCTV and play space on the<br />
Andover Estate (including Corker Walk and Sue<br />
Davies Pitch). £40k of this covers the Andover<br />
Security Lighting Project, a separate WIP scheme.<br />
The estate has undergone large scale<br />
refurbishment over the past few years. LBI<br />
Housing is working with Groundwork to develop a<br />
proposal to further enhance the estate’s external<br />
spaces, specifically to rationalise and enhance<br />
<strong>plan</strong>ting estate wide, carry out community safety<br />
<strong>improvement</strong>s, explore opportunities for community<br />
gardening and to improve the Sue Davies football<br />
pitch. Our proposal with Groundwork is part of a<br />
bigger urban design scheme, focusing on <strong>plan</strong>ting<br />
with the creation of conservation areas and largely<br />
to assist with designing out crime.<br />
Once final designs and project costs have been<br />
developed, Groundwork’s experienced fundraiser<br />
will be able to support research and work with the<br />
TRA to apply for extra funding in order to<br />
implement the changes. This fundraising work is<br />
free of charge on the basis that Groundwork is<br />
commissioned to project manage the works if any<br />
funding is secured by Groundwork. Groundwork’s<br />
current quotation for managing through to delivery<br />
of the scheme is £20k, with LBI Housing and the<br />
TRA requiring a further £80k to use across the<br />
Andover Estate on landscaping schemes.<br />
Additional visible CCTV units would also be<br />
provided to act as a possible deterrent for criminal<br />
acts and increase the overall security of the estate.<br />
Additional lighting would help support the new<br />
cameras.<br />
24 June 2013 Page 76
Andover Estate - security / lighting project<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Estate security / permeability<br />
Priority: 1 - High<br />
Approx cost: £60,000<br />
Funds secured: £40,000<br />
TRA led initiative to improve existing and install<br />
additional lighting on the estate to support the new<br />
CCTV cameras being installed there. The majority of<br />
the scheme will be to light the areas not currently<br />
covered by existing lighting.<br />
S106 allocated from 67-83 Seven Sisters Rd. (£40k,<br />
07/2012) as part of a larger allocation to Andover<br />
Estate.<br />
Investigation ongoing to determine full cost of scheme.<br />
It is required by the TRA and residents of the<br />
estate to help in the prevention of crime and to<br />
safeguard the residents of the estate. It also acts<br />
to give the residents confidence that the estate is a<br />
safe environment.<br />
<strong>Finsbury</strong> <strong>Park</strong> Community Hub H&S and<br />
Refurbishment<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Community facilities<br />
1 - High<br />
£150,000<br />
Funds secured: £58,140<br />
Community space<br />
A long overdue refurbishment and repairs programme<br />
of the<br />
Community Hub. To perform H&S adaptations and<br />
implement modifications to the main hall, increase<br />
security and decorate the building.<br />
S106 allocated to<strong>ward</strong>s physical <strong>improvement</strong>s to the<br />
<strong>Finsbury</strong> <strong>Park</strong> Community Hub from 189-219 Isledon<br />
Rd (£58,140k, 01/2013)<br />
to address some pressing H&S issues and to<br />
continue offering an appropriate and safe space for<br />
social, recreational, learning, training &<br />
development activities.<br />
<strong>Finsbury</strong> <strong>Park</strong> Community Hub, Holloway<br />
Neighbourhood Group, Manor<br />
Gardens Welfare Trust<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Community facilities<br />
Community support funding<br />
1 - High<br />
£35,000<br />
The out<strong>ward</strong> image of the three bidding organisations<br />
does not reflect the breadth of services offered nor<br />
adequately show their impact in the community. The<br />
three organizations need to develop a PR and<br />
Communications Strategy to properly position them<br />
and increase success of fundraising activities.<br />
A professionally managed communications<br />
strategy increases the chances of attracting<br />
funding in an increasingly competitive environment.<br />
It is in the interest of the WP and LBI that the<br />
largest members of the <strong>ward</strong> partnership succeed<br />
in their efforts to attract funding, thus releasing the<br />
pressure for funding and allowing more funds to<br />
flow to smaller organisations.<br />
24 June 2013 Page 77
<strong>Finsbury</strong> <strong>Park</strong> Creative Hub<br />
Category: Community facilities<br />
Sub-category: Arts<br />
Priority: 1 - High<br />
Approx cost: £152,900<br />
Funds secured: £60,000<br />
This three year project will bring together a broad<br />
range of partners to deliver a comprehensive<br />
programme of community arts engagement activities,<br />
public art and training opportunities.<br />
The project is seeking S106 funding and will also lever<br />
an additional £60,000 from Arts <strong>Council</strong> England to<br />
support the development of a coherent programme of<br />
works as part of a broader place making initiative.<br />
This is a strategic project that the arts service will be<br />
leading and co-ordinating on behalf of the project<br />
partners.<br />
Creating opportunities to engage the wider public<br />
in the arts; providing training opportunities;<br />
contributing to wider place making initiative through<br />
public art;<br />
Holloway Neighbourhood Group -<br />
Community Development Programme<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Community facilities<br />
Community support funding<br />
1 - High<br />
£85,000<br />
A sustained programme of community development<br />
work which will encourage and support neighbourhood<br />
action and reach out to more people in need through<br />
the following projects:<br />
*Supported Volunteering Opportunities for people with<br />
mental health issues<br />
*Timebank Holloway<br />
*Meet my Street - a project to encourage neighbourly<br />
support for isolated or vulnerable people<br />
*Healthy Holloway - stress management in the<br />
workplace to support local small and medium sized<br />
businesses to build healthy workforces<br />
The Fairness Commission and the <strong>Council</strong>'s<br />
corporate strategy both point to the importance of<br />
reducing health inequalities and of building strong<br />
communities where people can engage in civic life<br />
and contribute through giving time to support local<br />
action.<br />
Investment will provide pump priming funding to<br />
kick start these initiatives to increase opportunities<br />
for people to improve their neighbourhoods and<br />
improve their health. Investment will also help<br />
attract longer-term charitable support.<br />
24 June 2013 Page 78
Manor Gardens Centre<br />
Category: Community facilities<br />
Sub-category: Community space<br />
Priority: 1 - High<br />
Approx cost: £137,400<br />
Funds secured: £30,000<br />
Painting of external parts of buildings, including<br />
windows, railings and metal fire escape (£42k);<br />
Repairs of loose tiles on roof of central buildings<br />
(£1.4k); Re-surfacing of car park (£18,000); New roof<br />
and decoration of covered space at back of House no.<br />
6, used as entrance by Age UK <strong>Islington</strong> (£6k);<br />
Refurbishment of small kitchen areas in House no.7<br />
and 8 (£12k); Refurbishment of toilets - 3 in central<br />
buildings, 1 in House no.6, 2 in House no.7, 1 in<br />
House no.8 and 1 in House no.9 (£36k); Painting and<br />
re-carpeting of halls and stairways in Houses no.6, 7,<br />
8 and 9 (£18k); New doors in Community Café (£3k);<br />
New door to Dame Geraldine Hall (£1k)<br />
s106 allocated from 556-564 Holloway Rd (£30k,<br />
07/2012)<br />
The Manor Gardens Centre provides a range of<br />
high quality accessible services to meet the<br />
changing requirements for health and well-being of<br />
people in <strong>Islington</strong> from the buildings comprising 6-<br />
9 Manor Gardens. These services take the form of<br />
projects directly managed by the Manor Gardens<br />
Welfare Trust and the provision of serviced office<br />
and meeting space for partners in the local<br />
community sharing our vision.<br />
Mayton Street Festival community event<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 1 - High<br />
Approx cost: £4,000<br />
Funds secured: £0<br />
Following the successful revival of the Mayton Street<br />
Festival last year (with 850 attendees) we want to put<br />
on an even better event this year. The street festival<br />
will contribute to better community involvement and<br />
renewed pride in the local area. Using the Old Fire<br />
Station as the base for the festival means that we can<br />
draw on the building’s long history in the area of<br />
tackling poverty and contributing to the economic and<br />
social vibrancy of the area.<br />
In a recent <strong>ward</strong> consultation event held at the Old<br />
Fire Station, participants said that their top priority<br />
was strengthening the sense of community.<br />
Holding a festival in the street is a very direct way<br />
of engaging directly with local people and can help<br />
generate pride and boost interest in an area. The<br />
event will be free, and with mass publicity we<br />
expect local residents to turn out in force.<br />
24 June 2013 Page 79
Old Fire Station, Mayton Street<br />
Category: Community facilities<br />
Sub-category: Community space<br />
Priority: 1 - High<br />
Approx cost: £92,352<br />
Funds secured: £49,645<br />
A programme of refurbishment to transform local<br />
community facilities at the Old Fire Station, home of<br />
the Holloway Neighbourhood Group. Work includes:<br />
painting and decorating of communal areas and<br />
general <strong>improvement</strong>s to the main hall and reception<br />
signage (£54,425); repairs to toilets and <strong>improvement</strong>s<br />
to disabled access bathrooms (£4,187); replacing two<br />
boilers (£12,740); refit of our WebRoom (£6,000);<br />
renovation of the Garden Room and improving access<br />
to our outside space (£15,000).<br />
106 allocated from 3-5 Thane Villas (£49,645,<br />
07/2012) to<strong>ward</strong>s <strong>improvement</strong>s<br />
To make significant and much needed<br />
<strong>improvement</strong>s to the Old Fire Station to enhance<br />
local people's experience of the centre, to improve<br />
facilities for smaller groups and to enable us to<br />
generate increased revenue from venue hire. HNG<br />
has never been able to imagine a full-scale<br />
refurbishment programme before and we see this<br />
as a key opportunity to really improve and<br />
strengthen a vital community asset<br />
Andover Bright Start Creche<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 2 - Medium<br />
Approx cost: £80,000<br />
Funds secured: £0<br />
To continue offering the Under Fives Childcare<br />
provision at the Hub.<br />
<strong>Finsbury</strong> <strong>Park</strong> Ward has the second highest child<br />
poverty index in the country. The crèche is a<br />
fundamental service to the community. Places for<br />
young children are in short supply in the <strong>ward</strong> as a<br />
result of the increase in population, -and is<br />
expected to grow even further in the immediate<br />
future when the new homes on Six Acres come on<br />
stream.<br />
Current funding runs out in April 2012 and if no<br />
funding streams are secured by then, the service<br />
will have to be shut down. Funding is requested to<br />
fund the creche for two years<br />
24 June 2013 Page 80
Andover Community Communication<br />
Enhancement Project<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Estate <strong>improvement</strong>s<br />
Estate security / permeability<br />
2 - Medium<br />
£34,000<br />
To purchase and install badly needed notice boards<br />
for the estate, lighted bollards to forge path through<br />
landscaped area at Corker Walk and the<br />
creation/installation of estate based maps for visitors<br />
and emergency services to use when entering the<br />
estate.<br />
One of the main criticisms of the Andover for our<br />
Emergency Services is the lack of road<br />
signs/estate maps to guide them to specific<br />
locations. This investment would eradicate this<br />
problem.<br />
Additional lighted bollards along the path way at<br />
Corker Walk would help define this walkway as a<br />
natural path leading from the estate to Seven<br />
Sisters Road. It also aids to help light up this area<br />
which currently has no lights and is used heavily at<br />
night by pedestrian traffic. This scheme is also<br />
heavily supported by the TRA.<br />
Andover Estate - road resurfacing<br />
Category: Transport and streetscape<br />
Sub-category: Highway maintenance<br />
Priority: 2 - Medium<br />
Approx cost: £60,000<br />
Funds secured: £0<br />
To resurface entire stretch of Old Andover Road.<br />
One of the main arteries through the estate and<br />
onto Hornsey Road end of the estate is via Old<br />
Andover Road. The blocks within this area are<br />
soon to have Decent Homes works commencing<br />
there and would only be complemented by the<br />
resurfacing of what amounts to a very poor road.<br />
The current state of the Old Andover Road exerts a<br />
sense of neglect and timely deterioration, coupled<br />
with the effects of years of continued construction<br />
use. We are therefore asking for and additional<br />
£60k for the resurfacing of this complete road way.<br />
24 June 2013 Page 81
Andover Estate - youth and community trust<br />
Category: Community facilities<br />
Sub-category: Community space<br />
Priority: 2 - Medium<br />
Approx cost: £29,195<br />
Funds secured: £0<br />
Andover Youth & Community Trust New Kitchen<br />
(£7,000)<br />
Andover Youth & Community Trust Technology<br />
upgrade. We would like to upgrade our current 10<br />
Laptops within the multimedia suite with more up to<br />
date Apple Mac Pros (£16,000, LOW priority)<br />
Andover Youth & Community Trust Redecoration<br />
Scheme. The centre has not been decorated inside or<br />
outside since 2007 and the outside need’s brightening<br />
up to improve the look of the front of the building<br />
(£3,500, LOW priority)<br />
Andover Youth & Community Trust New Shutters<br />
Scheme (£2,695)<br />
The current kitchen has been in situ since 1994<br />
and we would like to renew the kitchen. We would<br />
like to improve our kitchen so that it meets any<br />
health & safety requirements and that it is up to<br />
date with today’s standards.<br />
We would like to enable young people & Adults to<br />
get a chance to use the most up to date technology<br />
available and to improve our very slow Toshiba<br />
Laptops. We would like to offer the same<br />
opportunities to our users as they are offered at<br />
HNG.<br />
To help us regenerate the building in aid of getting<br />
more of the community involved in our sessions &<br />
to make the building more inviting.<br />
This particular area has not been improved within<br />
the last 18yrs and requires investment to improve<br />
access to the building. The current grills on the<br />
front have been in place since 1994 , These are<br />
now very worn and have become very hard to open<br />
for Volunteers. We would like to get a small<br />
electronic shutter that covers the main front door<br />
area.<br />
B2B Somali Arts and Education<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 2 - Medium<br />
Approx cost: £18,000<br />
Funds secured: £5,000<br />
This is a arts and Crafts Project base in Grafton<br />
Primary School. this project develops the Somali<br />
women and others, who attend the project skills to<br />
making saleable products, so the women can be<br />
encourage to develop further skills. Participants, are<br />
both Somali women and from diverse backgrounds<br />
and include mothers, single women and women whose<br />
children have grown up. They learn various skills:<br />
sewing, pattern cutting, printing and associated<br />
English language and numeracy skills.<br />
This investment is need to encourage women, to<br />
look in future employment such as the creative<br />
industry. Either to work as machines or as pattern<br />
cutters but also to work from home in future and<br />
take up commission's form so B2B can develop<br />
online sales, market stalls, for handmade products,<br />
as well a shop to sale products in the future.<br />
AlsoB2B has had advice and training from various<br />
agencies about developing our social enterprise,<br />
including Women’s Resourc, The funding to be<br />
finish by March July, But the project will carry on to<br />
develop further, marketing, on-line shop and as<br />
well marketing.<br />
24 June 2013 Page 82
Bennett Court Community Centre - external<br />
decoration<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Estate <strong>improvement</strong>s<br />
Community space<br />
2 - Medium<br />
£25,000<br />
External decorations to building<br />
&<br />
Heating Renewal in centre<br />
Bennett Court CC is currently well utilised,<br />
particularly for asuccessful children’s nursery.<br />
However, it is in a poor state due to years of<br />
neglect to the external decoration. The decoration<br />
of the external fabric of the building would be<br />
relatively inexpensive but provide a better looking<br />
facility which could lead to increased usage.<br />
The current heating system in place is the original<br />
heating system and covers two main areas of the<br />
centre when a speratate system for each area is<br />
needed.<br />
FinFuture<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 2 - Medium<br />
Approx cost: £50,000<br />
Funds secured: £0<br />
FinFuture is an independent registered charity with<br />
Development Trust status. All other FinFuture<br />
initiatives are based entirely on working in partnership<br />
with other organisations that have an interest in<br />
improving quality of life in our neighbourhood.<br />
FinFuture owns the FinSpace building and this is<br />
sustained by rental income from its tenants and from<br />
income generated by hiring out its meeting rooms.<br />
<strong>Finsbury</strong> <strong>Park</strong> Community Hub Development<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 2 - Medium<br />
Approx cost: £49,000<br />
Funds secured: £0<br />
To employ an additional member of staff to work<br />
alongside the CEO; to develop the board of directors<br />
and staff to better fulfil the Hub’s objectives.<br />
FPCH is <strong>Finsbury</strong> <strong>Park</strong>'s main Community Hub and<br />
is a model for other hubs in the borough. It is<br />
essential to the success of its partners, including<br />
the FPWP, that FPCH has the tools, resources and<br />
skills to drive for<strong>ward</strong> <strong>Islington</strong>’s Core Strategy, the<br />
Fairness Commission's recommendations and to<br />
expand the provision of services<br />
agreed with LBI. This is a one off request for<br />
funding and will allow the CEO to concentrate on<br />
fundraising and the board and staff to support her<br />
in this activity<br />
24 June 2013 Page 83
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> - Connecting <strong>Finsbury</strong><br />
<strong>Park</strong><br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Community facilities<br />
Community support funding<br />
2 - Medium<br />
£10,000<br />
A hyper local website would be developed with an<br />
attached volunteering and business development<br />
project. The website would would give news and<br />
information about the <strong>Finsbury</strong> <strong>Park</strong> area - it would<br />
concentrate on positive news but also give a space for<br />
people to suggest <strong>improvement</strong>s. It would allow all<br />
local groups, organisation and businesses to promote<br />
themselves and thier activiites . It would use the<br />
tempate developed for Holloway<br />
www.hollowayonline.net which will be live in Feb 2012.<br />
We need to pay for a staff member to under take<br />
the training up of volunteers who will collect<br />
information and take photos for one year. We<br />
need to pay a modest fee to the designer for the<br />
template.<br />
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> tree <strong>plan</strong>ting<br />
Category: Transport and streetscape<br />
Sub-category: Trees<br />
Priority: 2 - Medium<br />
Approx cost: £85,000<br />
Funds secured: £0<br />
Street tree <strong>plan</strong>ting in this <strong>ward</strong> in line with the tree<br />
strategy - 169 street trees<br />
To increase the number of street trees in the area,<br />
improving the feel of the area, providing shade for<br />
pedestrians, and absorbing carbon emissions.<br />
Because there is no longer a dedicated annual<br />
budget for tree <strong>plan</strong>ting, funding such as s106 is<br />
required in order for new trees to be <strong>plan</strong>ted or<br />
replaced.<br />
<strong>Islington</strong> LinkUp, 48 Seven Sisters Road<br />
Category: Community facilities<br />
Sub-category: Community space<br />
Priority: 2 - Medium<br />
Approx cost: £14,000<br />
Funds secured: £0<br />
Flooring on the ground floor needs to be replaced due<br />
to wear and tear. First floor maintance and decorating<br />
to make rooms useable. Phone and electrical system<br />
needs to be updated. Kitchen equipment sort for<br />
users needs.<br />
Investment is needed so that <strong>Islington</strong> Link Up can<br />
deliver activities and services to users in a safe,<br />
friendly and professional environment.<br />
24 June 2013 Page 84
Rowan Arts Shop<br />
Category: Community facilities<br />
Sub-category: Arts<br />
Priority: 2 - Medium<br />
Approx cost: £35,000<br />
Funds secured: £10,000<br />
Rowan Arts are applying for funding to develop a<br />
dynamic shop space that engages local people who<br />
are in need of training and development through<br />
volunteering opportunities, skills workshops, and<br />
offering space for artists and crafts persons to sell<br />
their work. It will invite other local people to donate<br />
items and skills. £10,000 has been as match funding<br />
for a Big Lottery Reaching Communities bid.<br />
To provide volunteering and training and the<br />
development of new skills and work experience<br />
opportunities. Once the model is deemed to be<br />
successful, Rowan Arts will approach other funders<br />
to support it on an ongoing basis. Other local<br />
organisations will also be supported to promote<br />
their work and the hyperlocal websites.<br />
Sue Davies pitch relocation/replacement<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Leisure / play space<br />
Priority: 2 - Medium<br />
Approx cost: £995,000<br />
Funds secured: £70,000<br />
To relocate/replace the Sue Davies pitch from the rear<br />
of Old Andover to Corker Walk / Seven Sisters Road<br />
with a modern, fit for purpose, sound proofed, semisunken<br />
Astroturf/G3 pitch as well as building an<br />
ancillary administrative light-weight prefabricated<br />
building with classroom, cafe and other facilities. The<br />
scheme also includes landscaping and provisioning of<br />
play-space and an outdoor gym.<br />
Alternatively option, if less funding was available,<br />
would be just to refurbish the football pitches and kick<br />
about areas on the estates (approx. cost: £150k).<br />
The scheme will benefit all residents in <strong>Finsbury</strong><br />
<strong>Park</strong> Ward.<br />
- Residents on the Andover Estate and Birnam<br />
Road, the Andover Futures Forum, <strong>Finsbury</strong> <strong>Park</strong>'s<br />
Safer Neighbourhoods Team, council officers and<br />
<strong>ward</strong> councillors agree that the ASB and criminal<br />
activities going on at the football pitch need to be<br />
resolved.<br />
- Relocating the Sue Davies pitch to Corker<br />
Walk/Seven Sisters Rd is the "linchpin" to unlock<br />
land that will enable the development of 150-170<br />
new homes on the Andover within the context of<br />
the Andover Estate Development Plan.<br />
- Arsenal wish to use this for community football<br />
training ('Arsenal Positive Futures' community<br />
coaching scheme) which will involve not only the<br />
estate children but children from all over the local<br />
area could be met while avoiding the ASB and<br />
neighbour complaints occasioned by the Sue<br />
Davies Playground.<br />
24 June 2013 Page 85
Andover Estate - tree management project<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Open space / green space<br />
Priority: 3 - Low<br />
Approx cost: £10,000<br />
Funds secured: £0<br />
To prune remaining trees in an effort to support the<br />
other security projects for the installation of addition<br />
CCTV on the estate.<br />
As part of our programme of security initiatives for<br />
the Andover Estate, LBI Housing in conjunction<br />
with the Tree Services at LBI have recently<br />
completed a scheme which saw the pruning of<br />
some 50 trees on the estate. This was part of the<br />
wider security works programme. There is still a<br />
requirement for additional funding to lower more of<br />
the tree stock on the estate. It was identified that<br />
there was a requirement to have these works<br />
carried out in order to support the installation of<br />
new lighting and the CCTV system. This figure<br />
equates to some 25% of the overall quantity of<br />
trees on the estate. We are now seeking an<br />
additional £10k to complete the tree pruning<br />
programme as all local budgets have been<br />
exhausted in the process.<br />
Coleridge Road streetscape <strong>improvement</strong>s<br />
Category: Transport and streetscape<br />
Sub-category: Streetscape<br />
Priority: 3 - Low<br />
Approx cost: £200,000<br />
Funds secured: £0<br />
Streetscape <strong>improvement</strong>s, including DDA works,<br />
footway renewal, de-cluttering of street furniture,<br />
possible tree <strong>plan</strong>ting, replacement of road humps with<br />
sinusoidal profile for cyclists (road is main cycle route),<br />
carriageway resurfacing for ease of movement for both<br />
cyclists and vehicles.<br />
Improve the environment for pedestrians.<br />
CPZ IS-J Area parking review<br />
Category: Transport and streetscape<br />
Sub-category: <strong>Park</strong>ing<br />
Priority: 3 - Low<br />
Approx cost: £78,500<br />
Funds secured: £0<br />
Review of CPZ IS-J. All the signs (at bay and zone<br />
entry) will need to changed to reflect any changes.<br />
Cover stickers cannot be used as these will bleach in<br />
time and will effect enforcement capabiities. The<br />
zones in the matchday area have similar enforcement<br />
times apart from CPZ IS-J having full Saturday<br />
enforcement as opposed to ending at 1.30pm. Careful<br />
consideration needs to given to reviews of zones in<br />
isolation to ensure they cause no adverse parking<br />
impacts on adjacent zones.<br />
To review the zone to ensure it provides benefits to<br />
residents with particular focus on hours of<br />
operation (possibly to match surrounding zones).<br />
24 June 2013 Page 86
Eburne Road disabled parking<br />
Category: Transport and streetscape<br />
Sub-category: Highway maintenance<br />
Move one disabled parking space and replace with<br />
double yellow lines. Remove kerb build out to create<br />
turning head.<br />
Resident cars being damaged due to poor road<br />
layout. No turning head for emergency services.<br />
Priority:<br />
Approx cost:<br />
3 - Low<br />
£6,500<br />
Funds secured: £0<br />
<strong>Finsbury</strong> <strong>Park</strong> principle routes streetscape<br />
<strong>improvement</strong>s<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Transport and streetscape<br />
Streetscape<br />
3 - Low<br />
£1,000,000<br />
Streetscape <strong>improvement</strong>s to main thoroughfares<br />
incuding Seven Sisters Road, Stroud Green Road and<br />
Holloway Road; possible works to include DDA works,<br />
footway renewal, decluttering of street furniture,<br />
possible lighting enhancement, tree <strong>plan</strong>ting, and<br />
public art, designed to improve community safety and<br />
public confidence in using public space. £1m is a<br />
conservative estimate of how much it would cost to<br />
make any significant <strong>improvement</strong> to these streets.<br />
Improvements would also need the co-operation of<br />
Transport for London, and would need to be<br />
implemented by TfL.<br />
Community safety is the Partnership's top priority.<br />
<strong>Finsbury</strong> <strong>Park</strong> station access<br />
Category: Transport and streetscape<br />
Sub-category: Public transport<br />
Measures to improve pedestrian access between<br />
stations, bus stops and walking routes on borough<br />
roads.<br />
To ensure easy pedestrian access between<br />
various modes of transport at interchanges.<br />
Priority:<br />
Approx cost:<br />
3 - Low<br />
£150,000<br />
Funds secured: £0<br />
24 June 2013 Page 87
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> bus facilities<br />
Category: Transport and streetscape<br />
Sub-category: Public transport<br />
Review of bus provision on a <strong>ward</strong> by <strong>ward</strong> basis to<br />
establish current bus services and <strong>improvement</strong>s<br />
required to serve local residents.<br />
Many local residents rely on buses as their main<br />
form of transport. By providing evidence and a<br />
suitable strategy we will be in a stronger position to<br />
petition TfL for <strong>improvement</strong>s to bus services.<br />
Priority:<br />
Approx cost:<br />
3 - Low<br />
£10,000<br />
Funds secured: £0<br />
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> cycling <strong>improvement</strong>s<br />
Category: Transport and streetscape<br />
Sub-category: Walking / cycling<br />
Priority: 3 - Low<br />
Approx cost: £320,000<br />
Funds secured: £0<br />
To provide an improved, safer cycling environment in<br />
the borough. This includes removal of barriers to<br />
cycling, such as one-way streets and "No Entry" points<br />
to allow cycling on less trafficked roads (approx 8<br />
sites, £100,000). This also includes improving<br />
infrastructure by providing enhancements such as<br />
Advanced Stop Lines (ASLs), cycle lanes/tracks, cycle<br />
logo on-street markings and signage where<br />
appropriate (approx 11 sites, £220,000).<br />
The <strong>Council</strong> aims to increase cycling, and to do so,<br />
must address the range of barriers faced by<br />
cyclists and those who wish to cycle. Costeffective<br />
investment will target funding at specific<br />
barriers and will ensure that there is a reduction in<br />
casualties despite any increase in cycling.<br />
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> speed management<br />
Category: Transport and streetscape<br />
Sub-category: Road safety<br />
Priority: 3 - Low<br />
Approx cost: £20,000<br />
Funds secured: £0<br />
To implement measures to address any speeding<br />
issues that may be occuring following the<br />
implementation of the borough wide 20mph speed limit<br />
scheme. Possible measures include new vehicle<br />
activated signs, visual road narrowings, additional<br />
20mph road markings and resident community<br />
enforcement programmes.<br />
A figure of £20K is proposed for each <strong>ward</strong> to be<br />
allocated to roads as highlighted in the surveys being<br />
undertaken to identify the most at risk locations.<br />
The recently introduced 20mph limit will be most<br />
effective if any areas of non-compliance are<br />
highlighted and remedial measures undertaken. As<br />
part of the review of the borough 20mph limit<br />
scheme speed surveys are being undertaken postimplementation<br />
to establish which roads have<br />
speed limits which are not complying with the new<br />
limit and identify measures to improve this.<br />
24 June 2013 Page 88
Isledon Road Gardens play area<br />
Category: Open space / green space<br />
Sub-category: Leisure / play space<br />
Priority: 3 - Low<br />
Approx cost: £60,000<br />
Funds secured: £0<br />
Increase play value of existing play area by replacing<br />
some of the existing play equipment and/or adding<br />
more natural play opportunities.<br />
The existing play area is in reasonable condition<br />
but the play value needs to be improved. The<br />
project is identified as a medium priority in the<br />
Greenspace Play Areas Audit and Action Plan,<br />
indicating that its physical condition and<br />
developmental and engagement value could be<br />
enhanced.<br />
Manor Gardens streetscape <strong>improvement</strong>s<br />
Category: Transport and streetscape<br />
Sub-category: Streetscape<br />
Priority: 3 - Low<br />
Approx cost: £280,000<br />
Funds secured: £0<br />
Footway reconstruction, for de-cluterring and design in<br />
line with <strong>Islington</strong> Streetbook.<br />
Manor Gardens has been highlighted as a route<br />
which requires renewal as identified by condition<br />
surveys. Footways and carriageway require further<br />
works to improve access to local businesses and<br />
transport links.<br />
Stroud Green Road road safety measures<br />
Category: Transport and streetscape<br />
Sub-category: Road safety<br />
Priority: 3 - Low<br />
Approx cost: £300,000<br />
Funds secured: £0<br />
Accident reduction, road safety and environmental<br />
<strong>improvement</strong>s for vulnerable road users (incl.<br />
pedestrians and cyclists)<br />
The borough now has a 20mph limit on all borough<br />
roads except Principal Roads (still 30mph). In view<br />
of the volume of pedestrian and vehicular traffic on<br />
these Principal Roads, and recent casualty data, it<br />
is expected that the majority of accidents will occur<br />
there; therefore, further investment is required to<br />
maintain a continuing reduction in the number of<br />
casualties.<br />
24 June 2013 Page 89
Andover Community Centre - internal<br />
decorations<br />
Internal decorations and replacement of doors<br />
throughout centre<br />
Andover CC is a well used centre with hub status in<br />
the borough and requires redecoration throughout.<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Community facilities<br />
Community space<br />
4 - To be prioritised<br />
£30,000<br />
s106 allocated from 89-219 Isledon Rd (£25k + any<br />
remaining funds from the community cafe allocation,<br />
07/2012) have been allocated to<strong>ward</strong>s <strong>improvement</strong>s<br />
to the Andover Community Centre<br />
All doors within the community centre are of a poor<br />
quality and and an age where replacement could<br />
be deemed as needed.<br />
Funds secured: £25,000<br />
Annette Road - Contraflow cycling<br />
Category: Transport and streetscape<br />
Sub-category: Walking / Cycling<br />
Priority: 4 - To be prioritised<br />
Approx cost: £15,000<br />
Funds secured: £0<br />
Provide contraflow cycle facilities in Annette Road<br />
between Arthur Road and Tollington Road.<br />
Note: Cost of £15000 is subject to consultation / could<br />
change.<br />
Contraflow cycling on this section of Annette Road<br />
would provide a useful link to the communities<br />
either side of Tollington Road<br />
Note: Request for scheme came from ICAG<br />
(<strong>Islington</strong> Cyclists' Action Group)<br />
Bennett Court playground<br />
New play equiment<br />
Request by TRA<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Estate <strong>improvement</strong>s<br />
Leisure / play space<br />
4 - To be prioritised<br />
£40,000<br />
Funds secured: £0<br />
24 June 2013 Page 90
<strong>Finsbury</strong> <strong>Park</strong> Community Arts<br />
Category: Community facilities<br />
Sub-category: Arts<br />
Priority: 4 - To be prioritised<br />
Approx cost: £175,000<br />
Funds secured: £90,000<br />
Support for community arts in <strong>Finsbury</strong> <strong>Park</strong>, including:<br />
- Public art/heritage project to utilise hoardings,<br />
streetscape, station tunnels etc to create temporary<br />
exhibition (~£35k)<br />
- Public Arts Programme / bursary to commission<br />
artwork from new/emerging artist or arts organisations<br />
(~£50k)<br />
- Development of community facilities/ contemporary<br />
public gallery space (~£90k)<br />
(Projects could be connected with John Jones site)<br />
* To engage local residents in contemporary art /<br />
heritage of local art<br />
* To develop residents' core skills in reading and<br />
writing and visual literacy linked to the Word<br />
Festival, reading strategy and Platform Youth Hub<br />
* Public art / gallery space under-represented in<br />
area<br />
£90k for development of community facilities /<br />
contemporary public gallery space has been<br />
secured in principle through an agreement with the<br />
developers of the John Jones site.<br />
Friends of The Royal Northern Gardens -<br />
Weekly Craft Club<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Community facilities<br />
Community support funding<br />
4 - To be prioritised<br />
£4,880<br />
This club would be coordinated by a craft club leader<br />
who would run and organise themed sessions for<br />
parents and their children (from April 2012). We<br />
specifically would like to continue to target isolated and<br />
vunerable parents who have children under the age of<br />
5. Our target group would include recent migrants,<br />
socially isolated and single parents. The funding would<br />
be used for an event room hire, fees for the club<br />
leader, advertising and materials.<br />
The North Library used to run a craft club, this ran<br />
in 2009/2010. Unfortunately, the funding for it<br />
ceased. The members were from a variety of<br />
social backgrounds, a number of them migrants,<br />
single parents and socially isolated parents who<br />
had found a safe, educative, inclusive environment<br />
to meet other parents. We would like to continue<br />
this environment in order to build on capacity<br />
building in the community for knowledge exchange<br />
among new parents and providing an alternative<br />
environment to the home in order to prevent<br />
isolation.<br />
Hercules Street - contraflow cycle route<br />
Category: Transport and streetscape<br />
Sub-category: Walking / cycling<br />
Priority: 4 - To be prioritised<br />
Approx cost: £12,500<br />
Funds secured: £0<br />
Provide contraflow cycle route in Hercules Street.<br />
Hercules Street N7 is currently one way from<br />
Holloway Road.<br />
Note: Request for scheme came from ICAG<br />
(<strong>Islington</strong> Cyclists' Action Group)<br />
24 June 2013 Page 91
Funded and Completed<br />
<strong>Finsbury</strong> <strong>Park</strong><br />
Scheme location and details Description of scheme Why Investment is needed<br />
Bennett Court Community Centre - internal<br />
decoration<br />
Category:<br />
Sub-category:<br />
Priority:<br />
Approx cost:<br />
Funds secured: £0<br />
Estate <strong>improvement</strong>s<br />
Community space<br />
£15,000<br />
Internal decoration to community centre.<br />
Bennett Court CC is currently well utilised,<br />
particularly for asuccessful children’s nursery. The<br />
internal decoration to the centre has not been<br />
completed for several years. Users of the centre<br />
complain that walls are in disprepair, ceilings<br />
cracking and the general feel of the centre is<br />
unwelcoming. An internal decoration programme<br />
would improve users' enjoyment of the centre and<br />
increase usage.<br />
Andover Community Centre - feasibility study<br />
Category: Community facilities<br />
Sub-category: Community space<br />
Priority: 1 - High<br />
Approx cost: £35,000<br />
Funds secured: £35,000<br />
Feasibility study for creation of social enterprise 'café<br />
on the square'.<br />
S106 funds allocated from from 189-219 Isledon Rd<br />
(up to £35k, 07/2012) for development of a 'community<br />
café' social enterprise / employment training facility<br />
(subject to a feasibility study)<br />
To provide training and job opportunities for local<br />
people.<br />
24 June 2013 Page 217
<strong>Finsbury</strong> <strong>Park</strong> Community Hub<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 1 - High<br />
Approx cost: £165,000<br />
Funds secured: £165,000<br />
To increase the breadth and width of services provided<br />
to the community directly and in partnership with other<br />
statutory and voluntary organisations. To develop,<br />
expand and support the range of services already<br />
provided and include new services proposed by LBI,<br />
the board of directors and requested by the community<br />
at large. (Core funding provided by LBI for the basic<br />
operation of the Hub.)<br />
S106 allocated to<strong>ward</strong>s <strong>Finsbury</strong> <strong>Park</strong> Community Hub<br />
employment and training and regeneration<br />
programmes from 189-219 Isledon Rd (£105k,<br />
01/2013)<br />
Core funding covers remainder (£60k)<br />
The services offered to the community are based<br />
on established needs, feedback from the<br />
community and are an expression of the <strong>Council</strong>’s<br />
Core Objectives and the Priorities and<br />
Recommendations of LBI’s Fairness Commission<br />
Report.<br />
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> project support funding<br />
Category: Community facilities<br />
Sub-category: Community support funding<br />
Priority: 1 - High<br />
Approx cost: £45,000<br />
Funds secured: £45,000<br />
Running cost of <strong>ward</strong> project, incorporating some<br />
project money. This would likely be £22,500 per year<br />
over a two year period (including on costs).<br />
To be funded by LBI Housing.<br />
To support local physical regeneration and<br />
community engagement.<br />
24 June 2013 Page 218
<strong>Finsbury</strong> <strong>Park</strong> <strong>ward</strong> estate <strong>improvement</strong>s<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Open space / green space<br />
Priority: 2 - Medium<br />
Approx cost: £200,000<br />
Funds secured: £0<br />
To resolve issues of anti-social behaviour created by<br />
poorly designed and/or redundant public spaces, this<br />
proposal would enhance the amenity of local housing<br />
estates by improving public spaces. Schemes could<br />
range from small scale projects (play areas,<br />
community gardens, lighting, seating, landscaping etc)<br />
to more ambitious schemes to upgrade green spaces,<br />
provide new leisure facilities or re-allocate space from<br />
other redundant uses such as excess parking.<br />
Selection of locations would take into account potential<br />
future housing expansion.<br />
The cost per scheme will vary greatly depending on<br />
what is required. If prioritised, further investigation<br />
would be required to identify the specific measures to<br />
be implemented on each estate. This would involve<br />
working closely with residents and other stakeholders<br />
at the estates to identify these details.<br />
Suggested estates for consideration in this <strong>ward</strong><br />
include the Andover Estate.<br />
To resolve issues of anti-social behaviour created<br />
by poorly designeed and/or redundant public<br />
spaces. To create improved public space on<br />
estates and to increase the use of these spaces,<br />
particularly by the wider community.<br />
Kinloch Street open space<br />
Category: Open space / green space<br />
Sub-category: Leisure / play space<br />
Priority: 2 - Medium<br />
Approx cost: £213,562<br />
Funds secured: £213,562<br />
Replace existing play equipment and introduce more<br />
natural play opportunities. Recently, site lines have<br />
been improved and some small scale landscape<br />
works, but the play equipment has not been replaced.<br />
S106 allocated<br />
- from 189-219 Isledon Rd (£180k, 07/2012) to<strong>ward</strong>s<br />
<strong>improvement</strong>s to Kinloch Street Gardens and the open<br />
space around the Sobell Leisure Centre<br />
- from The Globe public house, 107 Tollington Rd<br />
(£33,562.96, 03/2013)<br />
The existing play area is not in good condition and<br />
needs to be replaced. It is identified as a high<br />
priority in the Greenspace Play Areas Audit and<br />
Action Plan, indicating that it is in poor physical<br />
condition, lacks developmental and engagement<br />
value, and/or is in an area of high deprivation.<br />
24 June 2013 Page 219
<strong>Park</strong> Theatre, Clifton Terrace<br />
Category: Community facilities<br />
Sub-category: Arts<br />
Priority: 2 - Medium<br />
Approx cost: £400,000<br />
Funds secured: £400,000<br />
This major new development in <strong>Finsbury</strong> <strong>Park</strong> will see<br />
the development of a new theatre space. We are<br />
currently raising £400,000 in order to fund a dedicated<br />
education floor on site. This would be a facility in which<br />
to engage with both young people and older members<br />
of the community through a range of educational<br />
programmes. These will include community plays, over<br />
60s playreading sessions, workshops for schools, a<br />
regular saturday school and summer school and a<br />
young writers' programme. The theatre may work in<br />
partnership with <strong>Islington</strong> Community Theatre.<br />
To extend its <strong>plan</strong>s for its education programme, the<br />
organisation has raised the required £400,000 through<br />
donations and £10,000 of s106 from LB <strong>Islington</strong>.<br />
<strong>Finsbury</strong> <strong>Park</strong> is one of the most deprived areas of<br />
<strong>Islington</strong> and has been crying out for better<br />
facilities for a long time. The focus is on nurturing<br />
people within a professional theatre context and<br />
making them feel part of the building.<br />
<strong>Islington</strong> <strong>Council</strong> helped support the theatre's<br />
fundraising activities with an early contribution of<br />
£10,000 of s106 funding from 3-5 Thane Villas<br />
(10k, 07/2012)<br />
Seven Sisters Road / Sussex Way<br />
Category: Transport and streetscape<br />
Sub-category: Streetscape<br />
Priority: 2 - Medium<br />
Approx cost: £100,000<br />
Funds secured: £100,000<br />
Improvements to the 'square' outside the Poundland<br />
shop on Seven Sisters Rd, with inclusion of public art<br />
(possibly neon, £10k). There is scope for involving<br />
local young people through Spring Board (locally<br />
based) and other youth organisations - linking into<br />
existing projects.<br />
s106 allocated from 67-83 Seven Sisters Rd (£100k,<br />
07/2012) to<strong>ward</strong>s streetscape <strong>improvement</strong>s, lighting<br />
and public art near the junction of Sussex Way and<br />
Seven Sisters Road<br />
The area looks run down and delapidated. It is<br />
extremely busy both with pedestrians and cars. It<br />
has become a gathering place for street drinkers.<br />
24 June 2013 Page 220
Six Acres Estate<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Open space / green space<br />
Priority: 2 - Medium<br />
Approx cost: £147,015<br />
Funds secured: £147,015<br />
Landscaping the new plaza which their new buildings<br />
will overlook. The £150k was therefore meant to allow<br />
us to deliver a high-quality scheme similar to the new<br />
Central Square on the Andover Estate, suitable for a<br />
variety of recreational and conmmunity-based uses for<br />
the combined Six Acres, Haden and Clifton estates as<br />
well as the newbuild properties.<br />
S106 allocated from Six Acres Estate (£147,015,<br />
07/2012)<br />
The lighting and concierge-controlled CCTV will<br />
allow us to make the square not just safe, but<br />
welcoming at all times. The external water and<br />
power points will provide the flexibility for<br />
community events and markets, and the highquality<br />
feature <strong>plan</strong>ting will form a suitable<br />
framework for the square. We wish to ensure that<br />
these elements form an integral part of the plaza,<br />
and are not tacked on piecemeal at a later date.,<br />
The existing funding has been allocated for the<br />
estate-wide environmental <strong>improvement</strong>s<br />
associated with security works, and the new layout<br />
formed by the OHG newbuild project, including the<br />
central plaza.<br />
However, the budget was allocated on the belief<br />
that a portion of funding for the main plaza would<br />
come from OHG via the S106 funding allocation.<br />
Bennett Court Community Centre - rewiring<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Community space<br />
Priority: 3 - Low<br />
Approx cost: £20,000<br />
Funds secured: £0<br />
Complete electrical rewire<br />
Bennett Court CC is currently well utilised,<br />
particularly for asuccessful children’s nursery. The<br />
building's electrics are the original electrics. A<br />
rewiring of the system will modernise the centre<br />
and increase security for users if an intercom<br />
system was also introduced to the main entrance<br />
door.<br />
24 June 2013 Page 221
Bennett Court Community Centre - windows<br />
Category: Estate <strong>improvement</strong>s<br />
Sub-category: Community space<br />
Priority: 3 - Low<br />
Approx cost: £33,000<br />
Funds secured: £33,000<br />
Replacement of existing window to double glazed and<br />
renewal of flooring throughout.<br />
S106 allocated from 14-20 Sussex Way (£33,396,<br />
07/2012)<br />
Bennett Court CC is currently well utilised,<br />
particularly for asuccessful children’s nursery.<br />
Windows are original windows and as such offer<br />
no heating retainment nor address climate change<br />
issues surrounding these types of windows. A<br />
replacement to double glazed would enhance the<br />
use of the centre and prove to be more effective.<br />
The current timber flooring is in a poor condition.<br />
Renewing the flooring would increase safe usage<br />
and enhance the centre for users with mobility<br />
issues.<br />
24 June 2013 Page 222