Modules

jaif.or.jp

Modules

Tracking No. 00.00.2010

32

Site Development and Site-Specific

Scope

• Site development includes setup of on-site cranes for site

development and standard plant construction and module

assembly

– Installation of Ultra Heavy Lift Crane deep foundation and

support pad

– Crane mat installation for crawler cranes

– Assembly and load test of Ultra Heavy Lifting Crane

– Crane assembly and support for power island construction

– Crane support for module assembly and component prefab

– Crane support for general site and Warehouse support

More magazines by this user
Similar magazines