12.03.2014 Views

Modules

Modules

Modules

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tracking No. 00.00.2010<br />

Identification of Appropriate<br />

Subcontractors<br />

• Factors to be considered when determining strategy:<br />

– Regulatory and quality track record<br />

– Owner/Consortium preferences<br />

– Local labor conditions and availability<br />

– Site conditions and limitations<br />

– Schedule requirements<br />

– Availability of qualified subcontractors<br />

– Size of potential subcontracts relative to available<br />

subcontractors<br />

– Financial and resource capability of subcontractors<br />

– Comparative suitability of single or multi-disciplined<br />

subcontractors with regard to project interfaces<br />

– Preferred pricing structures<br />

62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!